Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 CrAdmitted-Finance GUWAHATI | KAMRUP | ASSAM | 781030 | ₹9.5 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | Meetei Construction Private Limited L1 |
|---|---|---|---|---|
| 1.00A: Construction of Administrative Block. | ||||
| 2.00Sub- Head - Earth Work, | ||||
| 3.00 | 2.6.0 Earthwork in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains(not exceeding 1.5m in width or 10 sqm on plan) including getting out and disposal of excavated earth,lead upto 50m and lift upto 1.5m,as directed by the Engineer -in- Charge. a) All kinds of soil. | 337.84 | cum | 531.11 ₹1,79,430.2 Lowest |
| 4.00 | 2.24 Filling available excavated earth (excluding rock) in trenches, plinth sides of foundation etc. in layers not exceeding 20 cm.in depth, consolidating each deposited layer by ramming and watering lead upto 50 metres lift upto 1.5 metre. | 112.61 | cum | 223.22 ₹25,137.47 Lowest |
| 5.00 | 2.26 Supplying and filling in plinth with sandy soil under floors i/c watering, ramming, consolidating and dressing complete. | 305.46 | cum | 1,503.54 ₹4,59,271.33 Lowest |
| 6.00Sub- Head - Concrete & RCC Work, | ||||
| 7.00 | 4.1.6 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work upto plinth level: a) 1:4:8 ( 1 Cement : 4coarse sand ; 8 graded stone aggreagate 40 mm norminal size ) | 105.58 | cum | 12,308.63 ₹12,99,545.16 Lowest |
| 8.00 | 5.1 Providing and laying cement in position specified of reinforced cement concrete excluding the cost of centering,shuttering,finishing and reinforcement-All work upto plinth level: -1:1.5:3 ( 1 Cement : 1.5 coarse sand : 3 graded stone aggreagate 20 mm norminal size ) | 127.35 | cum | 18,501.54 ₹23,56,171.12 Lowest |
| 9.00 | 5.2 RCC work in walls (any thickness ), including attached pilasters, buttresses, plinth and string courses,fillets,columns,pillars,piers,abutments, posts and struts etc above plinth level .upto floor five level excluding cost of centering,shuttering,finishing and reiforcement: 1: 1.5 : 3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggrt. 20 mm nominal size) | 41.33 | cum | 19,074.47 ₹7,88,347.85 Lowest |
| 10.00 | 5.3 RCC work in beams, suspended floors, roofs having slope upto 15" landing, balconies, shelves,chajjas,lintels, bands, plain window sills, staircases and spiral staircases above plinth level upto floor five level, excluding the cost of centering, shuttering,finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggrt. 20mm nominal size). | 198.3 | cum | 19,173.65 ₹38,02,134.8 Lowest |
Tender Value
₹9.5 Cr
EMD Value
₹18.9 L
Closing Date
21 Sept 2026, 12:00 pmClosed
Executive Engineer - II
PDA Office North AOC Imphal.
Infrastructure Development of DIET Chandel, Chandel District, Manipur.
2026_PDA_3455_1
No. EE-II-PDA/NIT/2026-27/2
Open Tender
Civil Works
Works
540 days
As Per Tender Document
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Acc No 10160100021250
₹18.9 L
21 Sept 2026
31 Aug 2026
21 Sept 2026
31 Aug 2026
21 Sept 2026
31 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A: Construction of Administrative Block. | - | - | - | - |
| 2 | Sub- Head - Earth Work, | - | - | - | - |
| 3 | 2.6.0 Earthwork in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains(not exceeding 1.5m in width or 10 sqm on plan) including getting out and disposal of excavated earth,lead upto 50m and lift upto 1.5m,as directed by the Engineer -in- Charge. a) All kinds of soil. | 1 | cum | 1 | ₹1 |
| 4 | 2.24 Filling available excavated earth (excluding rock) in trenches, plinth sides of foundation etc. in layers not exceeding 20 cm.in depth, consolidating each deposited layer by ramming and watering lead upto 50 metres lift upto 1.5 metre. | 0.2 | cum | 1 | ₹0.2 |
| 5 | 2.26 Supplying and filling in plinth with sandy soil under floors i/c watering, ramming, consolidating and dressing complete. | 1 | cum | 1 | ₹1 |
| 6 | Sub- Head - Concrete & RCC Work, | - | - | - | - |
| 7 | 4.1.6 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work upto plinth level: a) 1:4:8 ( 1 Cement : 4coarse sand ; 8 graded stone aggreagate 40 mm norminal size ) | 1 | cum | 1 | ₹1 |
| 8 | 5.1 Providing and laying cement in position specified of reinforced cement concrete excluding the cost of centering,shuttering,finishing and reinforcement-All work upto plinth level: -1:1.5:3 ( 1 Cement : 1.5 coarse sand : 3 graded stone aggreagate 20 mm norminal size ) | 1 | cum | 1 | ₹1 |
| 9 | 5.2 RCC work in walls (any thickness ), including attached pilasters, buttresses, plinth and string courses,fillets,columns,pillars,piers,abutments, posts and struts etc above plinth level .upto floor five level excluding cost of centering,shuttering,finishing and reiforcement: 1: 1.5 : 3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggrt. 20 mm nominal size) | 1 | cum | 1 | ₹1 |
| 10 | 5.3 RCC work in beams, suspended floors, roofs having slope upto 15" landing, balconies, shelves,chajjas,lintels, bands, plain window sills, staircases and spiral staircases above plinth level upto floor five level, excluding the cost of centering, shuttering,finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggrt. 20mm nominal size). | - | cum | 1 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 24.03 MB
BOQ_3761.xls
BOQ • 0.60 MB
Chandel.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .