Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-Finance 227 228 GALI NO 9 BAPROLA NAJAFGARH PRASHANT ENCLAVE SOUTH WEST DELHI DELHI 110043 UDYAM DL 03 0004809 | WEST DELHI | DELHI | 110043 | ₹5.5 L | L1 | Accepted-Finance Being L1 bidder |
| 2 | L2₹6.6 LRejected-Finance | ₹6.6 L | L2 | Rejected-Finance Not the L1 bidder |
| 3 | L3₹7.6 LRejected-Finance 1001 SHIVALIK ABAISE 100 FEET ROAD OPP ANANDNAGAR APARTMENT PRAHALADNAGAR AHMEDABAD AHMEDABAD GUJARAT 380015 UDYAM GJ 01 0027029 24AGPPP8172K1ZP R M MII STATUS AS VERIFIED | AHMADABAD | GUJARAT | 380015 | ₹7.6 L | L3 | Rejected-Finance Not the L1 bidder |
| 4 | L4₹7.8 LRejected-Finance S 79 OKHLA INDUSTRIAL AREA PHASE II NEW DELHI 110020 | SOUTH EAST | DELHI | 110020 | ₹7.8 L | L4 | Rejected-Finance Not the L1 bidder |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not eligible as per NIT criteria. |
| Sl No | Description | Qty | Unit | PYROGUARD ENGINEERS PRIVATE LIMITED L4 | CENTRE TAP ENGINEERING L3 | Fire Engineering Technology L1 | Kalpataru Industries L2 |
|---|---|---|---|---|---|---|---|
| 1.00Supply of UL Listed / FM approved Clean Agent (FK-5-1-12/NOVEC-1230/NAF S-1230) based automatic linear pneumatic tube detection gas suppression system for LT electrical panels of MLCP & STP, design in accordance to NBC 2016 / NFPA 2001 system, comprising following including all components, accessories, connections, fittings and supports etc. complete as per technical specifications as required. | |||||||
| 1.10 | 2.0 Kg capacity PESO approved Aluminium seamless alloy cylinder conforming to IS 15660-2017, filled with 2.0 Kg UL Listed / FM approved Clean Agent (FK-5-1-12/NOVEC-1230/NAF S-1230), complete with TPED/CE/PESO/UL/FM approved Direct Low-Pressure (DLP) valve assembly with pressure gauge, ball valve, push-in / push-fit connector for heat detection tube, suitable rupture pressure rated safety burst disc, heavy-duty Stainless Steel / GI mounting brackets including all components, accessories, connections, fittings and supports etc. complete as per technical specifications as required. | 13 | Each | 20,580 ₹2.7 L | 20,000 ₹2.6 L | 18,000 ₹2.3 L | 21,550 ₹2.8 L |
| 1.20 | UL Listed Linear Pneumatic Heat Detection Tube (ID: 4- 6 mm & OD: 6-8 mm as per system design requirement) for automatic linear pneumatic tube detection gas suppression system, made of special modified Polyamide (PA), with Red colour, having burst temperature range of 1000C to 1330C, pressurised with dry Nitrogen at 15-20 Bars pressure, end plugs, tee-connectors etc. complete as per technical specifications as required. | 335 | Metre | 720 ₹2.4 L | 1,000 ₹3.4 L | 400 ₹1.3 L | 650 ₹2.2 L |
| 1.30 | UL Listed / FM Approved / CE certified / LPCB approved Low Pressure Switch for monitoring pressure loss in fire suppression system complete with electrical contacts (NO/NC), wiring up to fire suppression system monitoring panel, connections, fittings and supports etc. complete as per technical specifications as required. | 13 | Each | 2,830 ₹36,790 | 2,000 ₹26,000 | 1,200 ₹15,600 | 2,450 ₹31,850 |
| 1.40 | End of Line Adaptor with Pressure Gauge suitable for Linear Pneumatic Heat Detection Tube (ID: 4- 6 mm & OD: 6-8 mm as per system design requirement) made of Brass with elastomeric sealings, to be installed at the end of the tube for pressurizing / re-pressurizing, connections, fittings and supports etc. complete as per technical specifications as required. | 13 | Each | 3,220 ₹41,860 | 2,000 ₹26,000 | 1,500 ₹19,500 | 1,650 ₹21,450 |
| 1.50 | Fire Suppression System Monitoring Panel / Master Control Unit with LCD/LED display, hooter cum flasher, 6/12/24 VDC battery backup with in-built charging, minimum 02 Nos. NO/NC potential-free relay contacts, LED indications for Gas Discharge, Battery, System status and AC Power ON etc., suitable for operation on 230 VAC +/- 10%, 50 Hz power supply, extension of power supply from nearest power point along with provision of 5A switch & socket of approved make, related wiring/cabling, connections / interconnections, conduiting etc. (Up to 5 Metres), with provision for integration with FDAS / SCADA / BMS including all components, accessories, connections, fittings and supports etc. complete as per technical specifications as required. | 9 | Each | 12,920 ₹1.2 L | 5,000 ₹45,000 | 5,000 ₹45,000 | 4,250 ₹38,250 |
| 2.00 | Installation, Testing and Commissioning of UL Listed / FM approved Clean Agent (FK-5-1-12/NOVEC-1230/NAF S-1230) based automatic linear pneumatic tube detection gas suppression system for LT electrical panels of MLCP & STP in accordance to LPS 1666, comprising all components as above, accessories, connections, fittings and supports etc. complete as per technical specifications as required. | 13 | Job | 5,540 ₹72,020 | 5,000 ₹65,000 | 7,500 ₹97,500 | 5,200 ₹67,600 |
Tender Value
₹8.5 L
EMD Value
₹25,448
Closing Date
18 Feb 2026, 12:00 pmClosed
AGM(E-E), Goa International Airport, Goa-403801
Goa International Airport, Goa-403801
Provision of Clean Agent Based Automatic Fire Suppression System for LT Panels at Goa Airport
2026_AAI_263641_1
AAI/GOA/E-E/2025-26/NIT-13
Open Tender
Electrical Works
30 days
Goa International Airport
As per ENIT
16 documents required · 16 mandatory
₹1,180
₹25,448
18 Mar 2026
21 Jan 2026
19 Feb 2026
21 Jan 2026
18 Feb 2026
21 Jan 2026
21 Jan 2026 - 28 Jan 2026
2.0 Kg capacity PESO approved Aluminium seamless alloy cylinder conforming to IS 15660-2017, filled with 2.0 Kg UL Listed / FM approved Clean Agent (FK-5-1-12/NOVEC-1230/NAF S-1230), complete with TPED/CE/PESO/UL/FM approved Direct Low-Pressure (DLP) valve assembly with pressure gauge, ball valve, push-in / push-fit connector for heat detection tube, suitable rupture pressure rated safety burst disc, heavy-duty Stainless Steel / GI mounting brackets including all components, accessories, connections, fittings and supports etc. complete as per technical specifications as required.
UL Listed Linear Pneumatic Heat Detection Tube (ID: 4- 6 mm & OD: 6-8 mm as per system design requirement) for automatic linear pneumatic tube detection gas suppression system, made of special modified Polyamide (PA), with Red colour, having burst temperature range of 1000C to 1330C, pressurised with dry Nitrogen at 15-20 Bars pressure, end plugs, tee-connectors etc. complete as per technical specifications as required.
UL Listed / FM Approved / CE certified / LPCB approved Low Pressure Switch for monitoring pressure loss in fire suppression system complete with electrical contacts (NO/NC), wiring up to fire suppression system monitoring panel, connections, fittings and supports etc. complete as per technical specifications as required.
End of Line Adaptor with Pressure Gauge suitable for Linear Pneumatic Heat Detection Tube (ID: 4- 6 mm & OD: 6-8 mm as per system design requirement) made of Brass with elastomeric sealings, to be installed at the end of the tube for pressurizing / re-pressurizing, connections, fittings and supports etc. complete as per technical specifications as required.
Fire Suppression System Monitoring Panel / Master Control Unit with LCD/LED display, hooter cum flasher, 6/12/24 VDC battery backup with in-built charging, minimum 02 Nos. NO/NC potential-free relay contacts, LED indications for Gas Discharge, Battery, System status and AC Power ON etc., suitable for operation on 230 VAC +/- 10%, 50 Hz power supply, extension of power supply from nearest power point along with provision of 5A switch & socket of approved make, related wiring/cabling, connections / interconnections, conduiting etc. (Up to 5 Metres), with provision for integration with FDAS / SCADA / BMS including all components, accessories, connections, fittings and supports etc. complete as per technical specifications as required.
Installation, Testing and Commissioning of UL Listed / FM approved Clean Agent (FK-5-1-12/NOVEC-1230/NAF S-1230) based automatic linear pneumatic tube detection gas suppression system for LT electrical panels of MLCP & STP in accordance to LPS 1666, comprising all components as above, accessories, connections, fittings and supports etc. complete as per technical specifications as required.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
TenderDocs.pdf
Tender Documents • 7.42 MB
BOQ_305997.xls
BOQ • 0.61 MB
Download all tender documents and submit your bid