Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹4.2 L
Closing Date
22 Oct 2026, 12:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
E.E. Construction Division-2, P.W.D. Jaunpur
E.E. Construction Division-2, P.W.D. Jaunpur
Construction work of 2x5x5 m Box Culvert and approach road over the drain near Maurya Basti, Yadav Basti and Junior High School on the Vibhannamau Road in Development Block Jalalpur
2026_CEUVZ_1196617_1
2788/4A date 07-10-2026
Open Tender
Civil Works - Bridges
Fixed-rate
180 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹4.2 L
Yes
15 Oct 2026
15 Oct 2026
22 Oct 2026
15 Oct 2026
22 Oct 2026
15 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation of structures as per drawing and technical specification including setting out construction of shoring and bressing of sides and bottom, back filling the and excavated earth to the extent required utilising the ramaining earth locally for road work in widening portion. SI No. 251(Including all material, T&P, labour cess etc. but excluding G.S.T.) | 500 | Cum | 60 | ₹30,000 |
| 2 | Providing and laying filter Material in raft and underneath pitching in slopes complete as per drawing and Technical specification. As per SI No. 15.5 (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 131.18 | Cum | 2,325 | ₹3,05,002.8 |
| 3 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 15.53 | Cum | 5,440 | ₹84,456 |
| 4 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but including the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately) (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 225.73 | Cum | 7,400 | ₹16,70,396.45 |
| 5 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 22.15 | MT | 71,850 | ₹15,91,454.7 |
| 6 | Provindig and fixing of weep holes with 100mm dia P.V.C. pipe including supply of all materials labour tools and plants etc. complete work. (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 40 | RM | 147 | ₹5,880 |
| 7 | Stone boulder pitching in apron including cost of materials, Labour T&P etc required proper complition of work (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 144.72 | Cum | 2,300 | ₹3,32,856 |
| 8 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from R.O.W. with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per TechnicalSpecification Clause 301.5 (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 1,000 | Cum | 67 | ₹67,000 |
| 9 | Providing laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually mixing in place with rotavator and compacting with the road roller and OMC to achieve the desired uncomfined compressive strength and to form a layer of sub-base. (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 27 | Cum | 2,715 | ₹73,305 |
| 10 | Providing laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually mixing in place with rotavator and compacting with the road roller and OMC to achieve the desired uncomfined compressive strength and to form a layer of sub-base/base (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 36.75 | Cum | 2,970 | ₹1,09,147.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.79 MB
BOQ_2260771.xls
BOQ • 0.25 MB
T2.pdf
Tender Documents • 14.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .