Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.4 LAccepted-AOC | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹33.5 L+₹6.1 L (22.3%)Rejected-AOC | L2 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 3 | L3₹36.1 L+₹8.8 L (31.9%)Rejected-AOC | L3 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 4 | L4₹36.3 L+₹8.9 L (32.5%)Rejected-AOC | L4 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 5 | L5₹37.0 L+₹9.6 L (34.9%)Rejected-AOC | L5 | Rejected-AOC OTHER THAN LOWEST BIDDER |
Tender Value
₹42.2 L
EMD Value
₹84,360
Closing Date
17 Aug 2020, 6:00 pmClosed
S F AUGUSTINE GE KASAULI
MES OFFICE KASAULI
OUTSOURCING OF WATER SUPPLY INSTALLATIONS AND CONNECTED WORKS AT SUBATHU AND SOLAN
2020_MES_362967_1
GEK-33/2020-21
Open Tender
Civil Works - Water Works
Item Rate
330 days
KASAULI
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Yes
GE KASAULI
₹84,360
Yes
28 Aug 2020
22 Jul 2020
19 Aug 2020
22 Jul 2020
17 Aug 2020
5 Aug 2020
Amount
Schedule 'A' Section - I
Outsourcing of services for maint and operation of water supply pumping installation main pump house at Gamber by engaging 01 No operator (FGM) in each shift of 08 hours ( three shifts per day) . Operation Consists of three Shifts in a day on all working days including sundays and holidays complete all as specified and as directed by Engr-in-charge. The details of installed machineries and equipment are as under:- (a) Centrifugal multi stagte Pump set coupled with 220HP 3 phase electric Motor= 4 Nos (b) Centrifugal multi stagte Pump set coupled with 180HP 3 phase electric Moror= 3 Nos (c) DG Set 437.5KVA = 01 set (d) DG set 320KVA=01 set (DG set shall run when break down of electricity occurs) (e) Power Panel = 04 Nos (f) Motor control panels(MCC) = 8 Nos (g) Water reservoir 1LG = 01 No (h) Sluice valve/Gate valve/Non return valve = 32 Nos (j) High pressure filter with 5 HP Pump- 05 Nos ( Note :- Routine back wash of pressure filter will be carried out as & when required)
Outsourcing of services for maint and operation of water supply pumping installation at Raw water pump house (old & new) at Gamber by engaging 01 No operator (FGM) in each shift of 08 hours ( three shifts per day) . Operation Consists of three Shifts in a day on all working days including sundays and holidays complete all as specified and as directed by Engr-in-charge The details of installed machineries and equipment are as under:- (a) Motor & pump set 20 HP(Old & New) Gamber= 08 set, (b) Motor & pump set 15 HP = 02 set, (c) Alum Dozer plant = 01 set, (d) Sluice /Gate valve/Non return valve = 22 Nos, (e) Motor control panels(MCC) = 2 Nos, (f) Water Wells = 2 Nos.
Outsourcing of services for maint and operation of water supply pumping installation at Radiana pump house at Gamber round by engaging 01 No operator (FGM) in each shift of 08 hours ( three shifts per day) .. Operation Consists of three Shifts in a day on all working days including sundays and holidays complete all as specified and as directed by Engr-in-charge . The details of installed machineries and equipment are as under:- (a) Motor & pump set 125 HP = 02 set (b) Motor & pump set 100 HP = 03 set (c) DE driven pump set 50 BHP = 01 set (d) Sluice /Gate valve/Non return valve = 26 Nos (e) Motor control panels(MCC) = 02 Nos (f) Electric panels= 03 Nos (g) DG set 125 KVA=01 No (h) Water reservoir= 03 Nos.
Outsourcing of services for maint and operation of water supply pumping installations at Chindit enclave Pump House by engaging 01 No operator (Mate / Valve man) per shift, in two shift i.e from 0400 to 1200 hours and 1200 to 2000 hours each shift 08 hours. Operation Consists of two Shifts in a day on all working days including sundays and holidays complete all as specified and as directed by Engr-in-charge . The details of installed machineries and equipment are as under:- (a) Motor & pump set 7.5 HP = 02 set (b) Sluice /Gate valve/Non return valve = 64 Nos (c) Motor control panels (MCC) = 01 No (d) Water reservoir= 03 Nos.
Outsourcing of services for maint and operation of water supply by engaging 01 No operator (Mate / Valve man) per shift, in two shift i.e from 0400 to 1200 hours and 1200 to 2000 hours each shift 08 hours in OTM and Md Accn of 13, 14 & 15 No area at Subathu including routine/preventive maintenance of following machineries, equipment & installations complete all as specified and as directed by Engr-in-charge. (a) Sluice valves /gate valves /Non return valves (b) Altouch dosing plant (c) Water reservoir (d) Springs including catchment area of any size (e) Pumping/distribution mains for smoother distribution of drinking water to users.
Outsourcing of services for maint and operation of spring system of water supply by engaging 01 No operator (Valve man / Semiskilled) in one shift i.e. from 0900 to 1700 hours daily, each shift has a 08 hours in spring (Spring No. 1 to 5) area at Subathu including routine/preventive maintenance of following machineries, equipment & installations complete all as specified and as directed by Engr-in-charge. (a) Sluice valves /gate valves/Non return valves (b) Springs area including catchment area of any size.
Outsourcing of services for maint and operation of spring system of water supply by engaging 01 No operator (Valve man / Semiskilled) in one shift i.e. from 0900 to 1700 hours daily, each shift has a 08 hours in spring area at Solan including routine /preventive maintenance of following machineries equipment & installation complete all as specified and as directed by Engr-in-charge. (a) Sluice valve/gate valves /Non return valves (b) Spring area including catchment area of any size. (c) Travel allowances to up down from solan to spring area.
Outsourcing of services for operation of 02 Nos DG set 1) 40 kVA at Record Office Subathu 2) 62.5 kVA at Section Hospital Subathu by engaging DG set operator (Skilled)-01 No. as directed for one shift i.e. 800 hrs to 1600 ( shift of 08 hrs duration) daily The shift timing for the month during contract period shall be complete all as specified as directed by Engineer-in- charge. The trademan deployed shall also be responsible for routine/preventive maintenance of equipments and accessories and cleaning of surrounding area of the installation and minor maint work i.e. cleaning and tightening of loose connections in panels and DG set.
The contractor shall also be responsible for routine/preventive maintenance of equipment and accessories, cleaning of surrounding area of the installation and the building inclusive of minor repair for leakage like providing gland packing, replacement of flange gasket and maintenance of control panel of DG set/pumping set/LT panel and tightening of loose connections in panels etc and routinge/periodic maintenance as under:- Note:- The following routine/preventure measures of above equipment/plant deemed to be included in the unit rates quoted against this item in conmsonance with Sch 'A' notes:- (A) Pumping Set (i) Bearing lubrication (ii) Leakage on pump set control valve (iii) Replacement of gland packing (iv) Checking of coupling, bolts, nuts etc. (v) Checking of Electric control panel such as tightening of electric connections etc. (vi) Cleaning of plants/equipments, plant room and sorroundings. (B) General (i) Maintenance of control valves, replacement of gland packing and providing greasing as and when required (ii) Checking proper dose of cholorination (iii) Recording of tests results (iv) Cleaning of Alum doser and connected accessories. (C) DG SET - (i) Checking of oil level of Diesel Engine, (II) Checking of water level of the radiator of the DG set, (iii)Checking of Electrolyte in the battery terminals including petroleum jelly as and when required.(iv) Checking of electric connection of alternator, (v) Checking battery charging with the existing battery charger, (vi)Checking carbon brushes of alternator including electric connection and out-put voltage.
(Gen Note for item 1 to 8) :- (a) The Contractor will provide suitable reliver (Tradesman) during weekly rest of employed electricans without any extra cost to department). (b) Contractor will provide all the tools plants / Chlorine / PPM testing kit , transportation as required for maintanance and operation to without any extra cost to department. (c) The rates for cleaning of sub station area inside and outside shall be deemed to be included in the unit rate. (d) The Contractor or his represetative ( supervisor) would maintain the daily complaint register/complaint slip/log book / duty roster and other required documents and putup all the documents once in a week to JE concerned / ENGR-in-Charge (e) Trademan should inform to JE concerned about any major breakdown and non availability of water for pumping. (f) The contractor will provide full dress to the staff employeed by him and no duty will be perform without proper dress.
Note:- The following routine/preventure measures of above equipment/plant deemed to be included in the unit rates quoted against this item in conmsonance with Sch 'A' notes:- (i) Maintenance of control valves, replacement of control valves, replacement of gland packing & providing greasing as and when required. (ii) Checking proper dose of cholorination (iii) Proper maintenance of runningt/maintenance records as directed by Engineer-in-charge (iv) Cleaning of bleaching doser and connected accessories
Vasudeva Trading Co.
M/S Trilok chand sharma
KATWAL TECHNOCRATS
Santosh Enterprises
Pankaj Traders
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .