| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | ₹9.1 L Quoted ₹9.8 L | L1 | Accepted-AOC The rates quoted by the contractor are lowest, hence accepted. |
| 2 | L2₹11.7 LRejected-Finance R O BRAGTA BHAWAN CHOTTA SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹11.7 L | L2 | Rejected-Finance The rates quoted by the contractor are on higher side, hence rejected. |
| 3 | L3₹13.0 LRejected-Finance LOCATION HIMACHAL PRADESHHPLA | UNA | HIMACHAL PRADESH | 174301 | ₹13.0 L | L3 | Rejected-Finance The rates quoted by the contractor are on higher side, hence rejected. |
| Sl No | Description | Qty | Unit | Geeta Ram Thakur L1 | RAM LAL L2 | mukul thakur L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges | 9.11 | P.cum | 410 ₹3,735.10 | 400 ₹3,644 | 400 ₹3,644 |
| 2.00 | Providing and laying in position specified grade of cement concrete, excluding the cost of centering, shuttering, All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 3.04 | P.Cum | 6,660 ₹20,246.40 | 7,500 ₹22,800 | 7,000 ₹21,280 |
| 3.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 8,265.44 | P.Kg | 112 ₹9.3 L | 130 ₹10.7 L | 150 ₹12.4 L |
| 4.00 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 322 | P.Sqm | 105 ₹33,810 | 200 ₹64,400 | 100 ₹32,200 |
Tender Value
₹9.2 L
EMD Value
₹18,400
Closing Date
5 Dec 2025, 5:00 pmClosed
Executive Engineer R B MC Shimla
Executive Engineer R B MC Shimla
Road from Dhobighat to SJVNL Malyana SH P F MC Channel railing at different points ward No 25 Malyana
2025_MC_121845_3
2555dated17112025
Open Tender
Civil Works
90 days
Shimla
Please refer to tender documents
7 documents required · 7 mandatory
₹413
Executive Engineer R B MC Shimla
₹18,400
16 Mar 2026
27 Nov 2025
6 Dec 2025
27 Nov 2025
5 Dec 2025
27 Nov 2025
Amount
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges
Providing and laying in position specified grade of cement concrete, excluding the cost of centering, shuttering, All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
RAM LAL (BID ID -590478)
mukul thakur (BID ID -590615)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.74 MB
Tendernotice_2.pdf
PDF • 0.70 MB
Tendernotice_3.pdf
PDF • 0.35 MB
BOQ_178759.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid