Loading…
Loading…
| # | Company | Quoted % |
|---|---|---|
| 1 | +4.51% | |
| 2 | +3.03% |
Tender Value
₹24.2 L
EMD Value
₹18,200
Closing Date
3 Jun 2026, 5:30 pmClosed
MR SE BRIDGE RAIPUR PRAKHAR KUMAR MISHRA(DFLT)
CE(Bridge)
BORING WORK FOR CONSTRUCTION OF VARIOUS BRIDGES UNDER SUB DIVISION NO.-01 RAIPUR FOR 2026-27
190898
NIT NO-82/Bridge/Raipur/2026-27
RESTRICTED TENDER
WORKS
PERCENTAGE
CE(Bridge)
Required Past Technical Experience: AS PER NIT
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
9 documents required · 9 mandatory
Public Works Department (PWD)
WORKS
MR SE BRIDGE RAIPUR PRAKHAR KUMAR MISHRA(DFLT)
RESTRICTED TENDER
PERCENTAGE
A B C D
CE(Bridge)
Bridge Circle, Raipur
Bridge Division Raipur
120
No
1
33.25
20092022
190898
3 Jun, 2026 5:30:00 PM IST
8 Jun, 2026 11:30:00 AM IST
15 May, 2026 6:30:00 PM IST
14052026
NIT NO-82/Bridge/Raipur/2026-27
BORING WORK FOR CONSTRUCTION OF VARIOUS BRIDGES UNDER SUB DIVISION NO.-01 RAIPUR FOR 2026-27
18200.00 INR
RTGS/CHALLAN (ONLINE) Internet Banking (ONLINE)
2416000.00
2
5 Jun, 2026 5:30:00 PM IST
2416000
AS PER NIT
AS PER NIT
AS PER NIT
0.00 INR
12
0010720220002
9 documents required · 8 mandatory · 1 optional
₹0
₹18,200
3 Jun 2026
15 May 2026
8 Jun 2026
15 May 2026
5 Jun 2026
Boring Works of Various Bridges under Sub Division No. 01
S.No. Item No. Item Descritption Qty Unit Rate Amount
1 2.26 Taking exploratory boring 100 mm dia at the location of piers and abutments or for high embankments in approaches in all types of strata like soil, soft rock, hard rock etc. including all materials such as casing pipes, accessories, grease and other such materials and or as required including converving such materials and machinery to site of work preserving the loose/undisturbed soil sample and rock core sample serially numbered at the site of work, performing other tests at site such as SPT etc. as per direction of Engineer In charge and conveying the same to the head quarters of concerned office as directed and submission of detailed bore log sheet along with required test reports as per I.R.C.78 and section 2400 including testing and preserving soil/rock core sample in core boxes as per Technical specifications and direction of Engineer In charge .
(i) Upto 1.0 m below bed level 62.00 Each 7141.00 442742.00
2 (ii) Beyond 1.0 m upto 5.0 m depth 248.00 Meter 1690.00 419120.00
3 (iii) Beyond 5.0 m depth 742.00 Meter 1918.00 1423156.00
4 4.37 DGPS Survey for Flyover/ ROB/ RUB/ Overpass/ Grade Separator and providing Autocad & KML files of survey data with details of all existing structures like road, kerbs, trees, drain, temple, buildings, railway tracks etc. along with utilities like electric poles etc. & superimposing on Google map including marking of coordinates at site location as per direction of Eingineer in-Charge 2650.00 Meter 50.00 132500.00
Total 2417518.00
Sub Engineer Sub Divisional Officer P.W.D. Bridge Construction Sub Division No. 01, Raipur (C.G.) Executive Engineer P.W.D., Bridge Division Raipur (C.G.)
REPORT AND SPECIFICATION
1 Name of Work :- Boring work for prparing DPR of various works under bridge Sub Division No 01 Raipur (C.G.)
2 Proposed Cost of Project for A.A. :- 24.17 Lakh
3 Authority :- Executive Engineer, P.W.D. Bridge Division Raipur
4 Work Details 1 Boring Work For Construction of Foot Over Bridge On Ring Road No 01 Near Rawanbhatha filter Plant Under The PWD Bridge Sub Division No 01, Raipur.
2 Boring Work For construction of High Level Bridge across Kharun River on sarona kaivalyadham Road under PWD Bridge Sub Division No 01, Raipur.
3 Boring Work For Construction of High Level Bridge On Koya Kachna Road under PWD Bridge Sub Division No 01, Raipur.
4 Boring & Survey Work for construction of ROB across Raipur Vishakhapattanam Rail Line Near JW Marriot Labhandih under PWD Bridge Sub Division No 01, Raipur
5 Boring and Survey Work for construction of Flyover Near Pirda Chowk on Ring Road No. 03 under PWD Bridge Sub Division No 01, Raipur.
6 Boring and survey Work For construction ROB from Expressway to Platform No 07 under PWD Bridge Sub Division No 01, Raipur.
4 Necessity :- milaHkkx {ks=karxZr ctV o"kZ 2026&27 ds varxZr izLrkfor fuekZ.k dk;Z dh th-,-Mh-@MªkbZax fMtkbZu izkDdyu rS;kj djus ls iwoZ cksfjax dk;Z fd;k tkuk vko';d gSA vr% cksfjax dk;Z gsrq izkDdyu rS;kj fd;k x;k gSA
Specifcation :- MORT&H & Related IRC code will be followed during execution of work.
Rates :- Bridge S.O.R. w.e.f. from 01.01.2025 & ammendment upto date issued by E-in-C P.W.D. Raipur
Sub Engineer Sub Divisional Officer P.W.D. Bridge Const .Sub Div-1 Raipur ( C.G.) Executive Engineer P.W.D. Bridge Const. Division Raipur (C.G.)
boq_comp_chart.xls
BOQ Comparative Chart • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 1.11 MB
947891851723121709_25412_Guidelines_to_Bidders_EPS_v1.pdf
NIT • 0.13 MB
8737084717952988823_190898_Boring Form-A.doc
NIT • 0.15 MB
4170760365811204868_190898_Boring Appendix-2.doc
NIT • 0.27 MB
393019556791958370_190898_e-procurement formet.doc
NIT • 0.07 MB
6395436252664457120_190898_Raipur Sub Div.pdf
NIT • 0.22 MB
2833555492432071527_190898_NIT Schedule.xlsx
BOQ • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .