| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹16.7 L+₹92,750 (5.87%)Rejected-Finance | L2 | Rejected-Finance Being L2 due to high rate |
| Sl No | Description | Qty | Unit | KVB CONSTRUCTION L1 | M/s APN Builder Enterprices L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing the area of bushes by cutting around workshop complex as and when required by the EIC., including disposing off the debris / garbages with in a lead of 50mtrs including cost of all labour charges, GST, Labour welfare cess and minor tools etc., complete. | 693.16 | Sqm | 4 ₹2,772.64 Lowest | 6 ₹4,158.96 |
| 2.00 | Dismantling doors windows and clerestore windows (steel or wood) shutters including chowhats, architrave, holdfats etc, complete and stacking within 50m lead and including labour charges, labour cess, GST and minor tools etc., complete. | 47.04 | Sqm | 115 ₹5,409.6 Lowest | 120 ₹5,644.8 |
| 3.00 | Demolishing cement concrete 1:3:6 or richer Mix including disposal of material within 50 metres lead as per direction of Engineer-in- Charge. Including all labour charges, transportation charges, minor tools, labour cess GST etc. Complete. | 11.42 | Cum | 2,555 ₹29,178.1 Lowest | 2,900 ₹33,118 |
| 4.00 | Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead. Including cost of all labour charges, minor tools, Labour welfare cess, GST etc, complete | 301.5 | Sqm | 45 ₹13,567.5 Lowest | 50 ₹15,075 |
| 5.00 | Providing form work including centering shuttering so as to give rough finish strutting and propping etc. height of propping and centering below supporting floors to ceiling not exceeding 4m and removal of the same for insitu reinforced concrete and plain concrete work ,including cost of all materials, all labour charges, minor tools, GST, labour welfare cess etc. complete. | 1.5 | Sqm | 655 ₹982.5 | 650 ₹975 Lowest |
| 6.00 | Providing and fixing Tor steel reinforcement for R.C.C. work including cutting, bending, binding, and placing in position cost of binding wire, minor tools, cost of all materials, all labour charges, minor tools, GST, labour welfare cess etc. complete. | 0.19 | Qtl | 11,555 ₹2,183.9 Lowest | 12,000 ₹2,268 |
| 7.00 | Providing and laying in position reinforced cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level. including cost of cement, steel, stone aggregates, transportation charges of all materials to work site, all labour charges minor tools, GST, labour welfare cess etc complete. RCC 1:1.5:3 (1 cement,. 1.5 River Stone sand and 3 graded stone aggregate 20mm nominal size) | 0.18 | Cum | 25,000 ₹4,500 Lowest | 27,000 ₹4,860 |
| 8.00 | Providing and laying 12mm cement plaster of mix 1:4 ( 1 Cement, 4 Mainland river sand) including cost of cement, mainland river sand, all labour charges, cost of minor tools, transportation charges, GST, labour welfare cess etc complete. | 13.85 | Sqm | 595 ₹8,240.75 | 590 ₹8,171.5 Lowest |
| 9.00 | Supplying and fixing rolling shutters of approved make, made of required size of MS laths inter locked together through their entire length and jointed together at the end by end locks mounted on specially designed pipe shaft with brackets, sideguides and arrangements for inside and out side locking with push and pull operation complete including the cost of providing and fixing necessary 27.5 cm long wire springs grade No.2 and MS top cover of required thickness for rolling shutters, cost of all materials, all labour charges, welding charges, scaffolding charges, minor tools, transportation charges, GST, labour welfare cess etc. complete. 80x1.25 mm MS Laths with 1.25 mm thick top cover. | 49.55 | Sqm | 4,255 ₹2,10,835.25 | 4,100 ₹2,03,155 Lowest |
| 10.00 | Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufactures specifications including appropriate priming coat, including preparation of surface, cleaning, cost of paint, brushes, transportation charges, scaffolding arrangements, all labour charges, minor tools, labour welfare cess, GST etc. complete. ( Steel Work) | 129.96 | Sqm | 250 ₹32,490 Lowest | 300 ₹38,988 |
Tender Value
₹15.2 L
EMD Value
₹30,400
Closing Date
3 Sept 2025, 3:00 pmClosed
Executive Egineer(KandGN), ALHW, Campbell Bay
O/o The DCE(N), ALHW, Campbell Bay
Repairing/ Renovation of Workshop office complex at Campbell Bay in Great Nicobar Island.
2025_ALHW_873610_1
ALHW/EEC/CB/DB/TEND-13-2nd call/2025-26
Open Tender
Civil Works
Item Rate
150 days
Campbell Bay
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹30,400
2 Dec 2025
18 Aug 2025
4 Sept 2025
18 Aug 2025
3 Sept 2025
18 Aug 2025
18 Aug 2025 - 20 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .