Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.5 LAccepted-AOC 34 35 ASHOKA ESTATE NEAR S S PUBLIC SCHOOL SEWLA SARAI AGRA 282001 | AGRA | UTTAR PRADESH | 282001 | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹26.7 L+₹2.5 L (10.2%)Rejected-Finance 91 DEFENCE ESTATE PHASE II NEAR AMBEDKAR PARK DEORI ROAD AGRA UP | AGRA | UTTAR PRADESH | 282001 | L2 | Rejected-Finance other than lowest | |
| 3 | L3₹31.3 L+₹7.1 L (29.2%)Rejected-Finance | L3 | Rejected-Finance other than lowest | |
| 4 | Rejected-Technical | - | Rejected-Technical Not recommended since not enlisted in the category | |
| 5 | Rejected-Technical 34 1 12 2F SAINIK VIHAR DEORI ROAD AGRA UP 282007 | AGRA | UTTAR PRADESH | 282007 | - | Rejected-Technical Not recommended since not enlisted in the category |
Tender Value
Refer Docs
EMD Value
₹70,000
Closing Date
31 Dec 2020, 6:00 pmClosed
GE (WEST) AGRA
62 Station Road Agra Cantt
MANNING OPERATION AND MAINTENANCE OF CENTRAL AC PLANT AT OFP SIGNAL CENTER AND MH UNDER AGE EM (W) OF GE (W) AGRA
2020_MES_400374_1
8012/739/E8
Open Tender
Civil Works
Item Rate
330 days
GE (WEST) AGRA
As per NIT
9 documents required · 9 mandatory
₹500
GE (WEST) AGRA
₹70,000
20 Feb 2021
3 Dec 2020
4 Jan 2021
3 Dec 2020
31 Dec 2020
17 Dec 2020
Amount
Manning, operation and comprehensive maintenance of central Air conditioning plant of OFP area capacity 3x23 TR (Plant shall be run for one shift of 08 hours on all days except Sunday and closed holidays by one operator for its smooth functioning by maintaining temperature 25°C ± 2ºC and humidity between 50 ± 5% inside the shed including cleaning of plant and its surrounding, maintaining log sheet (daily, weekly, monthly, quarterly & half yearly) and routine maintenance and detection of leakage & its rectification including charging of refrigerant gas and compressor oil complete all as specified and directed. AC plant shall comprising of the following :- (a) Compressor model SMC/8-65 - 03 Nos Make -Accel (b) Shell and tube type condenser with piping and valves model No 300-6 capacity P-3T- 03 Nos (c) Compressor motor 30 HP- 03 Nos Make ABB- (d) Monoblock centrifugal condenser pump of 7.5 HP capacity Make Beecon-03 Nos (e) Cooling tower FRP type with CT fan motor.-01 No (f) Air handling unit with blower motor-01 No (g) Refrigerant pipes, valves and gauges (h) Electrical control panel (j) Strip heaters, damper and ducts
Manning, operation and comprehensive maintenance of central Air conditioning plant of X Ray unit of capacity 3x9.5 TR(Plant shall be run for one shift of 08 hours) and air conditioning plants at ICU of capacity 3x 9.5 TR (Plant shall be run for three shift of 08 hours each ie round the clock) both plants located within 50 mts distance at MH Agra by one operator on all days including Sunday and closed holidays for its smooth functioning by maintaining temperature 25°C ± 2ºC and humidity between 50 ± 5% inside the shed including cleaning of plant and its surrounding, maintaining log sheet (daily, weekly, monthly, quarterly & half yearly) and routine maintenance and detection of leakage & its rectification including charging of refrigerant gas and compressor oil complete all as specified and directed. AC plants shall comprising of the following :- X-Ray unit MH Area :- (a) Compressor reciprocating model SMC 3- 65 - 03 Nos Make: ACCEL (b) Squirrel cage induction motor 12.5 HP 1440 RPM - 03 Nos Make: KIRLOSKAR (c) AHU with cooling coil and blower motor 5 HP -01 No, Make: KIRLOSKAR (d) Monoblock pump set of 3 HP capacity –02 Nos, Make: KIRLOSKAR (e) Main electrical LT control panel-01 No
(f) shell and tube condenser 9.5 TR-03 Nos (g) Refrigerant pipes, valves and gauges. (h) Cooling tower with CT Fan motor Make: MIHIR-01 Nos (j) Strip heaters, Damper and ducts. ICU AC Plant at MH :- (a) Compressor model SMC 3 - 65 Make: ACCEL – 03 Nos (b) Shell and tube type condenser with piping and valves –03 Nos (c) Compressor motor 12.5 HP – 03 Nos (d) AHU with cooling coil & blower motor capacity 5HP – 01 No (e) Main electrical LT panel board – 01 No (f) Cooling tower with CT fan motor – 01 No (g) Refrigerant pipes, valve and gauge. (h) Monoblock condenser pump set capacity 5HP Make: KIRLOSKAR –02 Nos (j) Strip heater, damper and ducts. (k) Voltage stablizer 60 KVA – 01 No
Manning, operation and comprehensive maintenance of central Air conditioning plant of OT dept of capacity 3x14.0 TR and air conditioning plants at labour room of capacity 3x 9.5 TR (Both Plants shall be run for three shift of 08 hours each ie round the clock) both plants located within 200 mts distance at MH Agra by one operator on all days including Sunday and closed holidays for its smooth functioning by maintaining temperature 25°C ± 2ºC and humidity between 50 ± 5% inside the shed including cleaning of plant and its surrounding, maintaining log sheet (daily, weekly, monthly, quarterly & half yearly) and routine maintenance and detection of leakage & its rectification including charging of refrigerant gas and compressor oil complete all as specified and directed. AC plants shall comprising of the following :-
AC PLANT OF OT DEPTT MH AGRA:- (a) Compressor model SMC 4 - 65 Make Accel – 03 Nos (b) Shell and tube type condenser with piping and valves –03 Nos (c) Compressor motor 20 HP – 03 Nos (d) AHU with cooling coil & blower motor capacity 7.5 HP – 01 No (e) Main electrical LT panel board – 01 No (f) Cooling tower with CT fan motor 5 HP – 01 No (g) Refrigerant pipes, valve and gauge. (h) Monoblock condenser pump set capacity 5HP Make kirloskar –02 Nos (j) Strip heater, damper and ducts.
AC PLANT OF LABOUR ROOM:- (a) Compressor model SMC 3 - 65 Make: ACCEL – 03 Nos (b) Shell and tube type condenser with piping and valves –03 Nos (c) Compressor motor 12.5 HP – 03 Nos (d) AHU with cooling coil & blower motor capacity 5 HP – 01 No (e) Main electrical LT panel board – 01 No (f) Cooling tower with CT fan motor 3 HP – 01 No (g) Refrigerant pipes, valve and gauge. (h) Monoblock condenser pump set capacity 5HP Make: KIRLOSKAR –02 Nos (j) Strip heater, damper and ducts.
Operation and maintenance of water cooled package type water chilling air conditioning plant at Signal Center of capacity 2x 20TR for round the clock (i.e. for 24 hours in 03 shifts of 08 Hrs each) including Sunday and Holiday at a time including (01) one No. of capacity 1x20 TR as standby at Signal Centre by one operator for its smooth functioning by maintaining temperature 25ºC+2ºC and humidity 50% + 5% inside the building including cleaning of plant and its surrounding, maintaining printed log sheet (daily, weekly, monthly, quarterly & half yearly) and routine maintenance and detection of leakage & its rectification including charging of refrigerant gas and compressor oil, maintaining temperature record register duly signed by user complete all as specified and directed. AC plant shall be comprising of the following :- (a) 3x20 TR capacity water cooled central type water chilling air conditioning plant/ unit of Make: BLUE STAR (b) 3x20 TR capacity condenser unit (c) Set of two chiller water pumps (d) Set of two condenser water pumps (e) One (01) No. cooling tower with motor, expansion water tank (f) MS water piping for condenser unit (g) Ducting with supports grills, diffusers, dampers and insulating materials. (h) Electrical control panel- 01 No.
Note for item No 1 to 4 : (i) Refrigerant gas for charging and compressor oil for filling shall be mesured and paid saperatly under respactive items here in after as supply only . (ii) Printed log sheet shall be provided by the contractor as per performa approved by Engr-in Charge. (iii) Contractor shall be responsible for maintain the temperature humidity to required level inside the bldg/shed, failing which recovery of Rs. 1000.00 per day shall be made from the Contractor dues. (iv) Operator appointed by the contractor shall be ITI trained in Ref Mechanic/Electrical or having 3 years experience in similar work.
M&L for dismantling electric motor, taking out the old worn out/unserviceable winding wire and rewinding the electric motor/mono-block with superior quality copper winding wire of suitable size including insulating material (PVC insulation sleeve, tape, film paper, varnish, cotton) required and re-fixing in position and testing complete all as specified & directed of following capacities :-
M&L for taking out the mono-block pump 5 HP shaft, remetalling, welding, turning and fixing new bush and sleeve and re-fixing in position complete all as specified and directed.
S&F in repair ball bearing double coller type complete all as specified and directed for following capacities of electric motor/mono block motor :-
S&F in repair refrigerant gas pressure gauge of suitable size with adopter flair work and brazing work of the following range complete all as specified and directed.
HP - 30 to 300 Lbs
LP - 30 to 150 Lbs
OP - 30 to 150 Lbs
S&F in repair dial type water pressure gauge 4'' dia of working pressure 5 Kg/Sqcm complete with adopter complete all as specified and directed.
S&F in repair HP/LP cut off switch including making electric connections complete for any capacity of AC plant complete all as specified and directed.
S&F in repair OP cut off switch including making electric connections complete for any capacity of AC plant complete all as specified and directed.
Taking out oil filter assembly by opening up all the bolts of side cover and replacing the unserviceable oil filter by new one, re-assembling the same and fixing in to its original position by tightening the all bolts & making the system leak proof including providing the side cover gasket for the following sizes :-
Repair of LT electric control panel board, cleaning inside with blower, servicing tightening all electrical connections/ contacts points, replacing defective locking clips thimble and making it serviceable with inter locking wiring including replacement of the defective parts and refixing back in its existing position complete all as specified and directed. Note : Defective parts will be measured and paid separately.
Supply only the following parts of panel board to be fixed under respective items here in above or before complete all as specified and directed:-
Electronis timers type ET-100, 110 V to 240 V, 50 Hz, 3 Sec to 10 Sec. Make : L&T/SIEMENS/BCH
Electronis timers type ET-100, 110 V to 240 V, 50 Hz, 9 Sec to 30 Sec. Make : L&T/SIEMENS/BCH
Contactor ML 1.5 Make : L&T/SIEMENS/BCH
Contactor ML 2 Make : L&T/SIEMENS/BCH
Contactor ML 3 Make : L&T/SIEMENS/BCH
Power contactor ML 4 Make : L&T/SIEMENS/BCH
Biametalic over load relay ML type 9 to 14 Amps Make : L&T/SIEMENS/BCH
Biametalic over load relay ML type 20 to 32 Amps Make : L&T/SIEMENS/BCH
Biametalic over load relay ML type 28 to 48 Amps Make : L&T/SIEMENS/BCH
Volt meter 0-500V make : AE (Digital type)
Ampere meter of any range Make : AE (Digital type) suitable LT upto 100 Amp
PVC insulated stranded single core copper cable conductor wire 1100 Volts grade of size 10 Sqmm
PVC insulated stranded single core copper cable conductor wire 1100 Volts grade of size 16 Sqmm Make: FINOLEX/POLYCAB/PLAZA
MCB TP 63 Amp,50 Hz,, 10 KA rupturing capacity, 240 volts (C-series) 10 KA. Make: HAVELLS/LEGRAND/HPL
MCB TP, 40 Amp,50 Hz, 10 KA rupturing capacity, 240 volts (C-series) 10 KA. Make: HAVELLS/LEGRAND/HPL
Connector 4 pole, 240 volts complete all as specified and directed.
S&F in repair strip heater 3 KW single phase complete all as specified & directed. Make: DASPAS or any ISI marked
Dismantling air filter section any size of air handling unit and M&L for overhauling/servicing of AHU by cleaning the AHU complete, cooling coil with coil shine, by spraying the chemical on the fins of coil and let the chemical remains on the fins for 04 hours then clean the chemical with fresh water till the chemical flushes out entirely by pressure of water & wash completly including stoppage of air leakage by using gasket clothing and PGI sheet with nut , bolts and cleaning air handling room with bleaching powder solution/chemical/acid & cleaning of air filter wire mesh/5 micron filter with above solution complete all as specified and directed.
S&F in repair by replacement of fan belts of following size complete all as specified and directed :- MAKE : FENNER/DUNLOP
B-72 Compressor Motor 20HP
B-84 Compressor Motor 12.5 HP
B-96 Compressor Motor 30 HP
Repair to old existing safety release valve comprising for renewal of Teflon sheet and adjustment of valve for AC plant of any capacity complete all as specified and directed.
S & F in repairs three phase motor connector plate suitable for 3 HP to 5 HP complete all as specified and directed.
S & F in repairs three phase motor connector plate suitable for 12.5 HP to 30 HP complete all as specified and directed.
Supply and fix in repairs water spray header, suitable for 9.5 TR capacity AC plant and connected items etc. complete and necessary water pipe lines connection, commissioning and testing complete all as specified and directed.
Supply and fix in repairs water spray header, suitable for 14 TR capacity AC plant and connected items etc. complete and necessary water pipe lines connection, commissioning and testing complete all as specified and directed.
Supply and fix in repairs water spray header, suitable for 23 TR capacity AC plant and connected items etc. complete and necessary water pipe lines connection, commissioning and testing complete all as specified and directed.
Supply and fix in repairs PVC fills of size 300x300x150 mm complete all as specified and directed.
S & F in repairs solenoid coil (for any size of solenoid valve or loader- unloader) and making necessary electric connection complete all as specified and directed
S&F in repairs thermostatic expansion valve flange type of size suitable for 3x9.5 TR (R-22) AC plant as per and making necessary connection complete all as specified and directed. Make: INDOFOS/DANFOS/SPORLAN
S&F in repairs thermostatic expansion valve flange type of size suitable for 3x14 TR (R-22) AC plant and making necessary connection complete all as specified and directed. Make: INDOFOS/DANFOS/SPORLAN
S&F in repairs thermostatic expansion valve flange type of size suitable for 3x23 TR (R-22) AC plant as per and making necessary connection complete all as specified and directed. Make: INDOFOS/DANFOS/SPORLAN
Supply and fixing PVC water protection cover / jali for protecdtion from birds, leaf etc to cooling tower tank.
M & L for installing, commissioning & testing of the filter section consists of pre-filter should be made of 14 gauge stainless steel to remove 99.90% of dust, pollen, mold, bacteria and any airborne particles with a size 0.1 micrometer at 85 liters per minute, 90% efficiency complete all as specified and directed. The pre-filter having the following sizes :
S&F in repair GI steel tubing 'medium grade' on wall/floor including cutting, threading of required size suitable for connection to condenser, mono block pump, cooling tower, gate valve including all GI fittings complete all as specified and directed for the following bores:- MAKE ; TATA/JINDAL
80 mm bore
40 mm bore
25 mm bore
S&F in repair gun metal gate valve with iron wheel head screwed both ends for iron pipe and fixed complete all as specified & directed:-
80 mm dia
40 mm dia
25 mm dia
S&F in repair cast iron non return valve of 80 mm bore with flanged end, ISI marked complete with jointing materials complete all as specified and directed. MAKE : KIRLOSKAR/ZOLOTO
Supply only refrigerant gas M-22 in cylinders of required capacity including transportation, loading and unloading charges for collection of empty cylinders from MES store yard of AGE E/M, returning the same cylinder or other cylinder after refilling and testing of cylinders including test certificate by authorised agencies complete all as specified and directed.
Supply only non freezing compressor oil in sealed standard sized containers complete all as specified and directed.
M &L for spray painting of 9.5 TR to 23 TR compressor -03 Nos, 12.5 HP to 30 HP electric motor- 03 Nos, 3 HP to 7.5 HP Monoblock pump - 02 Nos and GI Tubing 100 mm dia -15 RM, Cooling tower - 01 No outer body of complete AC Plant by applying one coat of synthetic enamel grey/green paint over the existing paint including cleaning and preparation of surface complete all as specified & directed.
De-scaling the entire water circulation system of 3 x 23 TR AC Plant including condenser but excluding mono block pump set from existing AC plants by circulating de scaling solution with the help of de -scaling pump circulating acid independently in each tube by gravity cleaning the condenser tubing with brush including renewal of worn out gasket, nuts and bolts complete all as specified and directed.
De-scaling the entire water circulation system of 3 x 14 TR AC Plant including condenser but excluding mono block pump set from existing AC plants by circulating de scaling solution with the help of de -scaling pump circulating acid independently in each tube by gravity cleaning the condenser tubing with brush including renewal of worn out gasket, nuts and bolts complete all as specified and directed.
De-scaling the entire water circulation system of 3 x 9.5 TR AC Plant including condenser but excluding mono block pump set from existing AC plants by circulating de scaling solution with the help of de -scaling pump circulating acid independently in each tube by gravity cleaning the condenser tubing with brush including renewal of worn out gasket, nuts and bolts complete all as specified and directed.
Supply and fixed in repairs, air break (power) contactor 3 TF30 31-0A complete all as specified and directed. Make : L&T/SIEMENS/BCH
Supply and fixed in repairs, air break (power) contactor 3 TF30 10-0A complete all as specified and directed. Make:- Make : L&T/SIEMENS/BCH
Supply and fixed in repairs, HRC catridge fuse 20A, (IS9224) complete all as specified and directed. Make : L&T/SIEMENS/BCH
Supply and fixed in repairs, HRC catridge fuse 63A, AC complete all as specified and directed. Make : L&T/SIEMENS/BCH
S&F in repair, 25 mm dia gun metal stop valve with iron wheel head screwed both ends for iron pipe complete all as specified & directed.
S&F in repairs, 20mm dia stop valves, cast copper alloy, screwed down, high pressure, with crutch or butter fly handle, screwed both ends for iron pipes or for unions complete all as specified and directed.
M&L for openig side cover of compressor by descrewing nuts, bolts etc and replacing shaft seals assy, refixing side cover with replacement of packing gaskets and leak testing and rectifying if found complete all as specified and directed of following capacity:-
Suitable for SMC 3-65 of Make- ACCEL
Suitable for SMC 4-65 of Make- ACCEL
Suitable for SMC 8-65 of Make- ACCEL
M& L for replacement of templrature gauge suitable for fixing on existing water line of AC plant of range 0 to 60 degree centigrate complete all as per existing sample including filling of oil in mounting pocket all as directed by Engr-in- Charge.
S&F in repares water flow control switch suitable for fixing on chilled water type central AC plant condensor/chilller pipe line,suitable for max pressure 10 bar, model HFS-25, Make Synergy or eqivalant as approved by GE complete all as specified and directed.
Gupta Automobiles
Radhe Krishn Engineering
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .