| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | ₹2.5 L | L1 | Accepted-AOC L1 is Less Percentage Rate QUATED BY APPROVED |
| 2 | L2₹2.7 LRejected-AOC | ₹2.7 L | L2 | Rejected-AOC L2 is Above Percentage Rate QUATED BY rEJECTED |
| Sl No | Description | Qty | Unit | V.R. CONSTRUCTIONS AND DEVELOPERS L1 | Malaiarasan.V L2 |
|---|---|---|---|---|---|
| 1.01Repairs pot holes to Melkalavai BG Road-KM-0/0-0/545 (R-99) | |||||
| 1.02 | Clearing the scrub jungles including all labour charges for all labour charges etc complete.
Km 0/0 - 1/190 | 490.5 | sqm | 5 ₹2,452.50 | 10 ₹4,905 |
| 1.03 | Earth Work excavation in all classes of soils except hard rock requiring blasting andDepositing on bank with all leads and lifts as per SS20A including cost of all labour materials, Tools , Equipments and all incidental charges and sheeting shoring and br Km 0/0 - 1/190 | 245 | cum | 140.45 ₹34,410.25 | 200 ₹49,000 |
| 1.04 | Picking The existing Damaged BT surface to 3 -5 Cm deep including all labour charges Km 0/0 - 1/0 | 9.8 | sqm | 23.36 ₹228.93 | 30 ₹294 |
| 1.05 | Advance Patch Work Making up the Undulation in the Existing B.T Surface to an average thickness of 50mm using 45mm IRC size HBG metal | 1.47 | cum | 4,661.98 ₹6,853.11 | 5,000 ₹7,350 |
| 1.06 | Providing andf Lying Tack coat over BT Surface Using 3 Kg of Bitumen 60/70 for 10sqm area includin cost and conveyance of bituminous binder including labour charrges for preparing the surface and applying the reqired quantity of bitumen as tack cost Km 0/0 - 1/190 | 412.5 | sqm | 33.5 ₹13,818.75 | 33.5 ₹13,818.75 |
| 1.07 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13 20nini IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A’ over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine Cruished Chips With 9.80Kg of bitumen per 10 Sqm, including cost and conveyance of chips and stacking them to Departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental secticn stores and its cost will be resovered as per special condition appended including heating the bitumen and n etal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting tńe same by power rolłing to the specified iines and grade.s including ali labour charges application of bitumen for seąl coat over the premix carpet and spreading the seal coat and power roller rolling ,Separately as per MOST specification 509 | 412.5 | cum | 326.82 ₹1.3 L | 326.82 ₹1.3 L |
| 1.08 | Provision for HM Stones of size 75 x 2 x 10 cm. | 3 | Each | 574.65 ₹1,723.95 | 574.65 ₹1,723.95 |
| 1.09 | Provision for 60Cm Equilateral Triangular Sign box | 2 | Each | 3,745 ₹7,490 | 3,745 ₹7,490 |
| 1.10 | Provision for labour welfare fund 1.00% | 1 | LS | 2,022 ₹2,022 | 2,022 ₹2,022 |
Tender Value
₹2.5 L
EMD Value
₹2,500
Closing Date
16 Oct 2025, 3:00 pmClosed
Block Development Officer (B.P)
Panchayat Union Vallam
TN/VPM/Vallam/SFC ROAD WORK/2025-26 P1
2025_RDTN_612786_1
TN/VPM/Vallam/SFC ROAD WORK/2025-26 P1
Open Tender
Civil Works
Vallam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,500
Yes
14 Dec 2025
9 Oct 2025
16 Oct 2025
9 Oct 2025
16 Oct 2025
9 Oct 2025
Amount
Repairs pot holes to Melkalavai BG Road-KM-0/0-0/545 (R-99)
Clearing the scrub jungles including all labour charges for all labour charges etc complete. Km 0/0 - 1/190
Earth Work excavation in all classes of soils except hard rock requiring blasting andDepositing on bank with all leads and lifts as per SS20A including cost of all labour materials, Tools , Equipments and all incidental charges and sheeting shoring and br Km 0/0 - 1/190
Picking The existing Damaged BT surface to 3 -5 Cm deep including all labour charges Km 0/0 - 1/0
Advance Patch Work Making up the Undulation in the Existing B.T Surface to an average thickness of 50mm using 45mm IRC size HBG metal
Providing andf Lying Tack coat over BT Surface Using 3 Kg of Bitumen 60/70 for 10sqm area includin cost and conveyance of bituminous binder including labour charrges for preparing the surface and applying the reqired quantity of bitumen as tack cost Km 0/0 - 1/190
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13 20nini IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A’ over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine Cruished Chips With 9.80Kg of bitumen per 10 Sqm, including cost and conveyance of chips and stacking them to Departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental secticn stores and its cost will be resovered as per special condition appended including heating the bitumen and n etal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting tńe same by power rolłing to the specified iines and grade.s including ali labour charges application of bitumen for seąl coat over the premix carpet and spreading the seal coat and power roller rolling ,Separately as per MOST specification 509
Provision for HM Stones of size 75 x 2 x 10 cm.
Provision for 60Cm Equilateral Triangular Sign box
Provision for labour welfare fund 1.00%
Provision for Citizen cum Name Board charges
Provision for Photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Malaiarasan.V (BID ID -1489252)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid