Loading…
Loading…
Tender Value
₹66.4 L
EMD Value
₹1.3 L
Closing Date
9 Jun 2026, 11:00 am4d left
EXECUTIVE ENGINEER
DISTRICT RURAL DEVELOPMENT AGENCY - KUSHAWATI MATHANY SALDANHA ADMINISTRATIVE COMPLEX BLOCK NO 202, 2ND FLOOR NEW COLLECTORATE BUILDING SOUTH MARGAO-GOA
Construction of Stage and Developmental Works in Survey No. 39-13 of Village Canacona near Shree Nirakar Temple at Khalwadem in V.P Shristhal of Canacona Taluka (Re-tender 2nd call)
2026_DRD_29448_1
DRDA-K/EW/GGSY/2026-2027/28 L5
Open Tender
Civil Works
360 days
SHRISTHAL CANACONA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.3 L
27 May 2026
27 May 2026
10 Jun 2026
27 May 2026
9 Jun 2026
27 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | ||||||
| 1.01 | All kinds of soil 50% total Qty i.e. 440.69*50/100 | 440.69 | M3 | - | - | item 2 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 177.14 | M3 | - | - | item 3 |
| 3Providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering, shuttering and finishing in: | ||||||
| 3.01 | All works upto plinth level | 179.29 | M3 | - | - | item 5 |
| 3.02 | In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. | 105 | M3 | - | - | item 6 |
| 4Centering & shuttering including Strutting, Propping & removal of forms for : | ||||||
| 4.01 | Vertical surfaces such as retaing walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like | 210 | M2 | - | - | item 8 |
| 4.02 | Foundations, Footings, Bases for columns | 27.84 | M2 | - | - | item 9 |
| 4.03 | Columns, Piers, Pillars, Aburments, Posts and struts (square rectangle polygon in plan) | 62.22 | M2 | - | - | item 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_29873.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid