| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-Finance | ₹5.8 L | L1 | Accepted-Finance Lowest rate quoted |
| 2 | L2₹5.9 LRejected-Finance JALPAIGURI | JALPAIGURI | JALPAIGURI | WEST BENGAL | ₹5.9 L | L2 | Rejected-Finance Higher rate quoted. |
| 3 | L3₹5.9 LRejected-Finance DARJEE PARA P O KRISHNAGAR DIST NADIA PIN 741101 | KRISHNAGAR | NADIA | WEST BENGAL | 741101 | ₹5.9 L | L3 | Rejected-Finance Higher rate quoted. |
Tender Value
₹5.7 L
EMD Value
₹11,415
Closing Date
17 Feb 2026, 4:55 pmClosed
EXECUTIVE ENGINEER, MALDA IRRIGATION DIVISION
Green Park, Malda
FPM Works at Sajaldhara Sluice and Hatimari Sluice, raincuts repair in different places of including hyacinth clearing from channel upto the period of October 2026 in G.P- Jaluabathal, Block- Kaliachak-I, P.S- Kaliachak
2026_IWD_1002519_13
WBIW/EE/MID/eNIT-10/2025-26
Open Tender
CIVIL WORKS
140 days
Jaluabathal, Block- Kaliachak-I, P.S- Kaliachak
Please refer Tender documents.
8 documents required · 8 mandatory
₹11,415
Yes
5 May 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
Cutting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge.
Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles and burning them to ashes when dry or removing them outside Government land including all leads and lifts to stack in a nearby available space complete.
Supply of Mazdoor (Male / Female)
Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete.
Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipment and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge. NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3. Size of Nylon crate is 1metre X 1metre X 1metre. (a) Where boats are not necessary.
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates (stone / brick) and sewing as done in case of cement bags, (tying with a knot after filling will not be accepted), and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB: - Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag.
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts both ways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking A) Beyond 500 metre and upto 1.00 Note: The rate is inclusive of Royalty charges, Cesses Charges and Compensation for earth for land owned / arranged by the contractor. Royalty payment certificate in original from competent authority are to be produced along the bill, otherwise amount due towards royalty @ Rs. 29.00 / Cum and Cess charge @ Rs. 5.30/ Cum will be deducted from the bills of work
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
FromNo2911.pdf
Tender Documents • 1.01 MB
BOQ_2457604.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid