Loading…
Loading…
Tender Value
₹7.5 L
EMD Value
₹74,635
Closing Date
1 Oct 2026, 12:00 pm7d left
EO NPP GARHMUKTESHWAR
NPP GARHMUKTESHWAR
NAKKA KUA MANDIR KI BOUNDARYWALL KA NIRMAN KARYE
2026_DOLBU_1186605_4
2310/NPP/GARH-nivida nirman/2026-27 date. 16-09-2026
Open Tender
Civil Works - Others
Percentage
60 days
NPP GARHMUKTESHWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹881
EO NPP GARHMUKTESHWAR
₹74,635
17 Sept 2026
17 Sept 2026
1 Oct 2026
17 Sept 2026
1 Oct 2026
17 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadwork in soil with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of 1 lines, grades and cross section and transporting to the embankement location with a lift upto S m and lead unto 1000 m as per Technical snecification Clause 302.3
Unit = cum | 10.8 | m3 | 111.3 | ₹1,202.04 |
| 2 | P.C.C with 4 cm gauge in proportion 1:6:12 cement, c/sand & 4cm brick ballast in fondation and under floor including supply of all materials labour T&p all complete (Item no273) | 4.05 | m3 | 4,000 | ₹16,200 |
| 3 | Cement concrete with 4 cm. gauge brick ballast fine sand of 1.25 F.m. and cement in proportion of 12:6:1 in foundations under floors, including supply of all materials, labour, tools and plants etc. required for proper completion of the work.
S.I.No. 273. | 1.8 | m3 | 4,980.7 | ₹8,965.26 |
| 4 | Plain/ Reinforcement cement concrete (1:2:4) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 | 10.41 | m3 | 8,104.1 | ₹84,363.68 |
| 5 | Supplying, ftting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clause 1002,1005,1010 & 1202 | 817.37 | kg | 70.99 | ₹58,025.1 |
| 6 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specification Brick masonry in 1:4 cement mortar. | 54.72 | m3 | 6,846.2 | ₹3,74,624.06 |
| 7 | Plastering with cement mortar (1:4),15 mm thick on brickwork in
substructure as per technical specification Clauses 613.4 & 1204
Plastering with 1:4 cement mortar | 588.8 | m2 | 229.2 | ₹1,34,952.96 |
| 8 | Plain cement concrete (1:2:4) in
substructure complete as per
drawings and technical specification
Clauses 802, 804,805, 806, 807,1202 ans 1204 for Coping. | 9.2 | m3 | 7,390.2 | ₹67,989.84 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 16.55 MB
BOQ_2233526.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .