Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹21.1 L+₹3.5 L (20.2%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹22.7 L+₹5.2 L (29.5%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹24.0 L+₹6.4 L (36.8%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | Not Admitted-PreQual/Technical | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹22.9 L
EMD Value
₹46,000
Closing Date
27 Jan 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executice Engineer Provincial Division No. 1
Executive Engineer Provincial Division No. 1
DNIT for relaying of CCB RD 0 to 350 on Nasirpur Tilla app road Road ID 7242 in village Nalvi Khurd length Km 3.816 in Karnal District
2022_HRY_202815_1
DNIT for relaying of CCB RD 0 to 350 on Nasirpur
Open Tender
Civil Works
Works
180 days
Karnal
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Yes
₹46,000
Yes
17 May 2022
6 Jan 2022
28 Jan 2022
6 Jan 2022
27 Jan 2022
6 Jan 2022
165 days
Amount
Dismantling of existing damaged bitumen surface by cold milling machine upto any depth and hauling the milled material up to any lead and stacking at nearest recycling plant site. (HSR 17.43.2) Note: - The quantity of milled bituminous mix material shall be a recovery item as mention in BOQ item No. 16.
Earth work in excavation by mechincals means mannual means in foundations, trenches etc. or drain (not exceeding) 1.5 m in width 10 sqm staking the excavated soil clear from the edge of excavation and subsequent 1.5 including getting out the excavated soil disposal of surplus exvavated soil, as directed with in a lead of 50 metres. (HSR 4.14)
Cement concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone cum aggregate 40 mm nominal size) (HSR 6.1.8)
Brick work with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth in: (HSR 7.21.1) Cement mortar 1:4 (1 cement: 4 coarse sand)
Cement pointing 1 :2 on lining (HSR.14.23.1)
Providing and Laying 600 mm dia Reinforced 2900 Cement Concrete Pipe NP3 / NP-4P /prestressed Concrete Pipe on First Class Bedding in Single Row Providing and Laying Reinforced cement concrete pipe NP3 /NP-4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1 :2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets 1000 mm dia, as per clause 2900 of MORT&H specifications (HSR17.61.1)
Excavation for roadwork in soil by mechanical means including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead up to 1000m as per technical clause 301 of MORT&H specifications (HSR 17.10.1)
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications (in case of link roads earthwork to be done by villagers) (HSR 17.5.3)
Removing of existing CC block pavement including transporting and stacking usable block along road side and dispose unusable blocks outside PWD land or desired by Engineer. (HSR 17.67)
Relaying of available (removed and stacked) C.C. Block M-30 Size 450x300x150mm and spreading 25 mm thick sand underneath filling joints with sand as per technical specification clause 1503. (HSR 17.68)
Providing & laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (Based on HSR 17.22.2) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (Based on HSR 17.23.2) WBM Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer
Providing and laying of cement concrete blocks of size 0.450 m x 0.300 m x 0.15 m of cement concrete (C.C) M30 grade and spreading 25 mm thick sand underneath filling joints with sand on existing W.B.M. base as per technical specification clause 1503 (HSR 17.66.1)
Preparation of berms including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift and including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305 and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. This item also includes E/W if required in sub grade for Widening and Shoulder. Earth used for sub grade, shoulder and berms should have minimum CBR of 8%. Note:- No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus
Advance direction informatory sign board 900x900 rectangular as per IRC 67- 2012 with retro reflective Sheeting as per ASTM D 4956 09 and as per IRC 67 2012 fixed over 4 mm thick aluminium Composite material (ACM) sheeting having aluminium skin thickness of 0.4 to 0.5 mm on both sided and fixing the same with suitable size aluminium alloy rivets @ 200 mm c/c to back support frame of 25x25x3mm angle iron supported on a square hollow steel section post 60x60x3.2mm conforming to IS 4923 without cost of definition plate firmly fixed to ground in foundation concrete M-25 of size 0.45x0.45x0.75m for vertical post complete as per dause 801 of MORT&H specifications. Supplier shall provide a warranty as per clause 6.9 of IRC 67-2012 for retro reflective sheeting & a certified copy of test reports from an independent test laboratory including three year outdoor weathering test report for sheeting tested in India condition conforming to clause 6.7 of IRC 67-2012. Using retro reflective Sheeting Class C as per IRC 67 2012 (HSR 34.12.1)
i) Bituminous Credit @ 1635 per Cum Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling / scarifying of existing bituminous crust have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled / scarified material can be issued for use in any of the item for the work after modification (bringing it to required specifications) on approval from the employer. In case it is not possible to use this material on the work, the agency can take away this material. The material can be taken away by the agency at the price quoted by the agency. However, the reserve price is as under :- Note :- All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual scarifying and if material after scarifying is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price Note:- In case of any difference in the unit & nomenclature of any of the HSR items depicted in this DNIT and that given in HSR. the unit and nomenclature given in HSR Shall be applicable. ii) In case of any difference in the unit of any Non- schedule items depicted in this DNIT and the Conventional unit of that N.S Item as per practice in this department the conventional unit as per practice shall be applicable..
Sandhu Construction Company
The New Karnal Coop Society Ltd
The Kandroli Coop LC Society Ltd
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .