Loading…
Loading…
Tender Value
₹12.6 L
EMD Value
₹31,562
Closing Date
12 Jun 2026, 9:30 pm7d left
Karnataka Forest Department
Advance work Including Raising of Seedlings at BALEHALLI, Sy No 105, 82, Extent 25.00 Agumbe Range Head of Account NBM Or Other Budget Head
301667
KFD/2026-27/OW/WORK_INDENT39813
Open
Other Works
KFD ACF Territorial Sub Division Office Ayanur
4 documents required · 0 mandatory · 4 optional
Department Registration Details
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing work
List of works for which tenders already submitted
Banker Details
Upload all documents as per tender documents
₹500
₹31,562
29 May 2026
29 May 2026
15 Jun 2026
11 Jun 2026
MODEL NO.15(C) BAMBOO PLANTATION
DATASHEET NO - 110 ADVANCE WORK FOR BAMBOO PLANTATION DURING 2026-27
No. of Pits-400 & size 0.60M3 Extent 1 Ha
No. of PBS 440-8"x12" Unit: 1.00 Ha.
Sl. No. SSR Item NO. Particulars of Works Unit Quantity Rate Amount
1 100 (b) Survey & Demarcation of Planting Areas:Survey & Demarcation of Plantation Boundry lines after clearing the rank growth to a width of 2 mtr. in the areas width sparse under growth. Per Km 0.072 1,542.78 111.08
2 29(b) Aligning in the planting areas along the contours and marking for pit (without staking) Per 1000 400 580.08 232.03 37
4 29© Excavation of pits with vertically cut edges make an uniform cube and heaping the excaveted soil (1/3rd top soil on the upper side & 2/3rd on the lower side)in Hard Soil 0.45x0.45x0.45 = 0.091cum/pit (1500 pits/ha) Per Cum 0.00 145.88 0.00
3 29 (c) i Excavation of pits with vertically cut edges make an uniform cube and heaping the excaveted soil (1/3rd top soil on the upper side & 2/3rd on the lower side)in ordinary Soil 0.60x0.60x0.60 = 0.216cum/pit (400 pits/ha) Per Cum 86.40 263.78 22,790.59
4 Sub-Estimate Cost of Raising 8" x 12" PB seedling, including 10% Casuality Replacement Per 1000 440 26.634 11,718.96
5 Sub Estimate BARBED WIRE FENCING WITH WOODEN POLES 1 Ha 1 12,300.00
6 LS SMC works @ 7% of Advance work 1 ha 3,300.69 ha. 3,300.69
7 -- Miscellaneous & rounding off 46.65
* The Provision for Soil Moisuture Conservation-Contour Trenches can be made by the Competent Authority, who sanctioned the APO, based on the Site Requirments. ** In case if the site requirment does not favour for the SMC Works, The savings amount can be utilised for the documentation works of the plantations
Assistant Convervator of Forests,
Ayanur Sub Division, Shimoga
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Advance Work Tender Notification 2026-27.pdf
Tender Document • 10.78 MB
Annexure-1 Final Copy.pdf
Tender Document • 0.24 MB
50500.xlsx
Tender Document • 0.02 MB
Download all tender documents and submit your bid