Loading…
Loading…
Tender Value
₹10.7 L
Closing Date
17 Sept 2026, 3:00 pmClosed
SE Project Circle Bilaspur
Estimate for 01 nos.03 HPTW/Pump connection at Vill. - at Bahma (dhaunrapara) ,01 nos.03 HP TW/Pump connection at Vill. - Hathgada ,01 nos.03 HP eachTW/Pump connection at Village - Barjor ,01 nos.03 HP TW/Pump connection at Vill. - Hathgada ,01 nos.03 HP TW/Pump connection at Vill. - Pongro ,01 nos.03 HP TW/Pump connection at Vill. - Chetba (Vishrampali) ,07 nos. 03 HP TW/Pump connection at Village - Hathgada (Kendutola) ,01 nos.03 HP TW/Pump connection at Vill. - Barjor under kansabel D/C, of (O&M) Division, Pathalgaon.
106911
SE/PROJECT/BSP/T173 DT-14.08.2026
Jashpur, Chhattisgarh
11 Sept 2026
11 Sept 2026
17 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | LT INE | 0.37 | KM | - | - |
| 2 | LT LINE | 0.24 | KM | - | - |
| 3 | LT LINE | 0.2 | KM | - | - |
| 4 | LT LINE | 0.25 | KM | - | - |
| 5 | LT LINE | 0.45 | KM | - | - |
| 6 | LT LINE | 0.24 | KM | - | - |
| 7 | 11 KV LINE DP | 1 | NO | - | - |
| 8 | 11 KV LINE | 0.19 | KM | - | - |
| 9 | X-MER DP | 1 | NO | - | - |
| 10 | LT LINE | 1 | KM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
source.json
RAW_JSON • 0.01 MB
256828-NIT_TD106911.pdf
pdf • 0.29 MB
256829-BOQ_TD106911.xlsx
xlsx • 0.31 MB
256830-TENDER_DOC_TD106911.pdf
pdf • 0.70 MB
258977-DATE_EXT_TD106911.pdf
pdf • 0.26 MB
258977-DATE_EXT_TD106911.pdf
pdf • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .