Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 CrAccepted-AOC | L1 | Accepted-AOC Financial Bid Accepted by the committee | |
| 2 | L2₹6.0 Cr+₹15.4 L (2.65%)Rejected-Finance MAINPURI | UTTAR PRADESH | 209720 | L2 | Rejected-Finance Rejected being higher rate | |
| 3 | L3₹6.2 Cr+₹42.8 L (7.35%)Rejected-Finance PATHANPURA HAMIRPUR ROAD RATH DISTT HAMIRPUR U P | HAMIRPUR | HAMIRPUR | UTTAR PRADESH | 210431 | L3 | Rejected-Finance Rejected being higher rate | |
| 4 | L4₹6.4 Cr+₹57.4 L (9.86%)Rejected-Finance 0 RAGHAVPUR ORHA TIKAMGARH DISTRICT TIKAMGARH MADHYA PRADESH | TIKAMGARH | TIKAMGARH | MADHYA PRADESH | L4 | Rejected-Finance Rejected being higher rate | |
| 5 | L5₹6.5 Cr+₹68.4 L (11.7%)Rejected-Finance 17 SADAR BAZAR DISTT JHANSI | JHANSI | JHANSI | UTTAR PRADESH | L5 | Rejected-Finance Rejected being higher rate |
| Sl No | Description | Qty | Unit | M/s Shubh Enterprises L7 | Garg Trading Company L5 | JAINENDRA SINGH L6 | M/s Shree Nath Ji Constructions L2 | KHAJURAHO CONSTRUCTION L1 | M/s Suresh Chand Gupta L4 | Tomar Construction And Suppliars L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 11,250 | cum | 54.27 ₹6,10,537.5 | 50 ₹5,62,500 | 20 ₹2,25,000 Lowest | 40 ₹4,50,000 | 45.2 ₹5,08,500 | 47.03 ₹5,29,087.5 | 60 ₹6,75,000 |
| 2.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 340-2. | 11,250 | cum | 59.13 ₹6,65,212.5 | 54 ₹6,07,500 | 40 ₹4,50,000 Lowest | 40 ₹4,50,000 Lowest | 49.05 ₹5,51,812.5 | 51.25 ₹5,76,562.5 | 50 ₹5,62,500 |
| 3.00 | GSB
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 7,937 | cum | 1,863.72 ₹1,47,92,345.64 | 2,000 ₹1,58,74,000 | 1,800 ₹1,42,86,600 | 1,700 ₹1,34,92,900 | 1,545.66 ₹1,22,67,903.42 | 2,070.5 ₹1,64,33,558.5 | 1,500 ₹1,19,05,500 Lowest |
| 4.00 | WMM
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 3,549 | cum | 2,255.48 ₹80,04,702.07 | 2,500 ₹88,72,500 | 2,000 ₹70,98,000 | 2,200 ₹78,07,800 | 1,871.23 ₹66,40,995.27 Lowest | 2,505.1 ₹88,90,599.9 | 2,000 ₹70,98,000 |
| 5.00 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. | 23,665 | cum | 35.19 ₹8,32,771.35 | 39 ₹9,22,935 | 25 ₹5,91,625 Lowest | 35 ₹8,28,275 | 29.12 ₹6,89,124.8 | 30.5 ₹7,21,782.5 | 30 ₹7,09,950 |
| 6.00 | DGBM
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 1,516 | cum | 7,690.5 ₹1,16,58,798 | 8,500 ₹1,28,86,000 | 9,000 ₹1,36,44,000 | 7,800 ₹1,18,24,800 | 6,380.55 ₹96,72,913.8 | 5,665.1 ₹85,88,291.6 Lowest | 7,500 ₹1,13,70,000 |
| 7.00 | Tack
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 23,665 | sqm | 10.08 ₹2,38,543.2 | 9 ₹2,12,985 | 10 ₹2,36,650 | 10 ₹2,36,650 | 8.21 ₹1,94,289.65 Lowest | 8.74 ₹2,06,832.1 | 10 ₹2,36,650 |
| 8.00 | BC
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects | 1,332 | cum | 8,795.79 ₹1,17,15,992.28 | 9,700 ₹1,29,20,400 | 10,000 ₹1,33,20,000 | 8,800 ₹1,17,21,600 | 7,297.49 ₹97,20,256.68 | 6,623.1 ₹88,21,969.2 Lowest | 9,000 ₹1,19,88,000 |
| 9.00 | Providing and Laying of Rubble moulded Zig Zag Interlocking Concrete Block Pavements having thickness 100 mm as per drawings and MORD Technical Specification Clause 1504.Having > 40 MPA Compressive Strength As per SOR Ch-6 item no-6.7(3) | 9,400 | sqm | 818.1 ₹76,90,140 | 300 ₹28,20,000 Lowest | 500 ₹47,00,000 | 700 ₹65,80,000 | 678.75 ₹63,80,250 | 609.1 ₹57,25,540 | 700 ₹65,80,000 |
| 10.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | 456 | cum | 615.24 ₹2,80,549.44 | 564 ₹2,57,184 | 400 ₹1,82,400 | 150 ₹68,400 Lowest | 509.99 ₹2,32,555.44 | 533.21 ₹2,43,143.76 | 500 ₹2,28,000 |
Tender Value
₹7.8 Cr
EMD Value
₹15.7 L
Closing Date
15 Nov 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S.E., Hamirpur Circle PWD Hamirpur
S.E., Hamirpur Circle PWD Hamirpur
Construction work of four lane road from Parmanand Chowk to Jhalkaribai Tiraha
2025_CEBAN_1088673_1
1926/30C-Hamirpur Circle/2025 Date 10.10.2025
Open Tender
Civil Works - Roads
Item Rate
365 days
PD PWD Mahoba
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,250
₹15.7 L
S.E., Hamirpur Circle PWD Hamirpur
6 Feb 2026
7 Nov 2025
15 Nov 2025
7 Nov 2025
15 Nov 2025
7 Nov 2025
13 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 11,250 | cum | - | - |
| 2 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 340-2. | 11,250 | cum | - | - |
| 3 | GSB
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 7,937 | cum | - | - |
| 4 | WMM
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 3,549 | cum | - | - |
| 5 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. | 23,665 | cum | - | - |
| 6 | DGBM
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 1,516 | cum | - | - |
| 7 | Tack
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 23,665 | sqm | - | - |
| 8 | BC
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects | 1,332 | cum | - | - |
| 9 | Providing and Laying of Rubble moulded Zig Zag Interlocking Concrete Block Pavements having thickness 100 mm as per drawings and MORD Technical Specification Clause 1504.Having > 40 MPA Compressive Strength As per SOR Ch-6 item no-6.7(3) | 9,400 | sqm | - | - |
| 10 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | 456 | cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
SBDParmanand4lane.pdf
Tender Documents • 1.02 MB
BOQ_1997800.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .