Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LQualified Make: DEEMOIL
Model: DEEMOIL PHASE II PLOT NO 06 SRV NO 211 GOVT INDUSTRIAL ESTATE PIPARIA SILVASSA DADRA AND NAGAR HAVELI DADRA NAGAR HAVELI 396230 | DADRA AND NAGAR HAVELI | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396230 | Make: DEEMOIL
Model: DEEMOIL | L1 | Qualified MSE, Category: General | |
| 2 | L2₹2.3 L+₹4,765.20 (2.11%)Qualified Make: AG ANGLO GOLDY
Model: AG DIELECTRIC OIL 137 AG HOUSE S N GHOSH AVENUE ELACHI NARENDRAPUR SOUTH 24 PARGANAS WEST BENGAL 700103 | 24 PARAGANAS SOUTH | WEST BENGAL | 700103 | Make: AG ANGLO GOLDY
Model: AG DIELECTRIC OIL | L2 | Qualified MSE, Category: General | |
| 3 | L3₹10.5 L+₹8.2 L (364.1%)Qualified Make: QUAKER HOUGHTON
Model: QUAKER HOUGHTON 44 N G N VAIDYA MARG KHATAU BLDG 1ST FLOOR SHAHID BHAGAT SINGH ROAD MUMBAI MUMBAI MAHARASHTRA 400001 | MUMBAI | MAHARASHTRA | 400001 | Make: QUAKER HOUGHTON
Model: QUAKER HOUGHTON | L3 | Qualified | |
| 4 | Disqualified Make: PETRELPLUS INC.
Model: PETRELPLUS 2ND 24 1 3 16TH CROSS BYRAVESHWARA INDL AREA VISHWANEEDAM CHETAN CIRCLE BANGALORE KARNATAKA 560091 UDYAM KR 03 0132863 | BENGALURU URBAN | KARNATAKA | 560091 | Make: PETRELPLUS INC.
Model: PETRELPLUS | - | Disqualified | |
| 5 | Disqualified Make: ARZOL
Model: ARZOL EDM OIL 200 PLOT NO 14 B MIDC MORIVALI AMBERNATH WEST THANE THANE MAHARASHTRA 421505 | THANE | MAHARASHTRA | 421505 | Make: ARZOL
Model: ARZOL EDM OIL 200 | - | Disqualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
26 Aug 2025, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dielectric oil (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6559211 Dated : 12-08-2025 Bid Document 1/6 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 4 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Director
GTRE Gas Turbine Research Establishment
DRDO
C V Raman Nagar
Bengaluru
Karnataka-560093 (Director Gtre) Splitting
8209693
GEM/2025/B/6559211
Two Packet Bid
Dielectric oil (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC)
30 days
BANGALORE CITY
Total value wise evaluation
PRODUCT
2 documents required · 2 mandatory
Exempted
26 Aug 2025
12 Aug 2025
26 Aug 2025
Dielectric oil (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6559211 Dated : 12-08-2025 Bid Document 1/6 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 4 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Director
GTRE Gas Turbine Research Establishment
C V Raman Nagar
Karnataka-560093 (Director Gtre) Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8209693.pdf
GEM_BID
1754907376.pdf
OTHER
BIDaccLB_f2130b25-3db8-409b-b1ff1754907825811_gtrebuycon1.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .