| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.0 CrAccepted-AOC | L1 | Accepted-AOC Awarded | |
| 2 | L2₹20.0 Cr+₹94.2 L (4.96%)Rejected-AOC | L2 | Rejected-AOC Not awarded | |
| 3 | Rejected-Technical | - | Rejected-Technical 15.5.c,d not complianc, 4.3.3.b Not compliance, 4.5,4.6 not complaince, 4.6.1 Not Bank letter | |
| 4 | Rejected-Technical PLOT NO 3 YOGANAND CO OP HOUSING SOCIETY BEHIND BIJAN HOSPITAL NEAR MALPANNI HOSPITAL VIGHA MALA CANADA CORNER COLLEGE ROAD NASHIK | NASHIK | NASHIK | MAHARASHTRA | - | Rejected-Technical 15.5 c Not compliance | |
| 5 | Rejected-Technical 1ST FLOOR MAHALAXMI PRIDE AKOLA BYPASS ROAD SANGAMNER TAL SANGAMNER DIST AHILYANAGAR | SANGAMNER | AHILYANAGAR | - | Rejected-Technical 15.5.c,d not complianc, 4.3.3.e Not compliance,4.6 not complaince, Bid validity undetaking not attached |
| Sl No | Description | Qty | Unit | Ankita Enterprise L1 | S Maheshwari & Co L2 |
|---|---|---|---|---|---|
| 1.00PART A-1 CIVIL & PLUMBING WORKS | |||||
| 2.00 | SITE CLEARANCE : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 12,519 | Cum | 16 ₹2,00,304 Lowest | 16 ₹2,00,304 Lowest |
| 3.00 | SITE EXCAVATION : Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means | 14,875 | Cum | 284 ₹42,24,500 Lowest | 300 ₹44,62,500 |
| 4.00 | FILLING INSIDE THE PREMISES : Filling in plinth and floors with approved excavated material in 15cm. to 20cm. layers including watering and compacting etc. complete. | 5,670 | Cum | 132 ₹7,48,440 Lowest | 140 ₹7,93,800 |
| 5.00 | EXCAVATION - UPTO 1.50 M : Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 4,356.38 | Cum | 227 ₹9,88,898.26 Lowest | 250 ₹10,89,095 |
| 6.00 | EXCAVATION - ABOVE 1.50 M to 3.00 M : Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means | 6,234.02 | Cum | 283 ₹17,64,227.66 Lowest | 283 ₹17,64,227.66 Lowest |
| 7.00 | EXCAVATION FOR PILE : Empty boring for 325 to 400 mm dia bored R.C.C. cast in situ piles including withdrawal of shell, removal of earth to a distance of 50 metres etc. complete. Spec :(As directed by Engineer in Charge) | 522.6 | Rm | 638 ₹3,33,418.8 Lowest | 700 ₹3,65,820 |
| 8.00 | ANTI TERMITE TREATMENT - BELOW GROUND LEVEL : Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. | 16,914.23 | Sqm | 117 ₹19,78,964.91 Lowest | 130 ₹21,98,849.9 |
| 9.00 | ANTI TERMITE TREATMENT FOR BACK FILLING SOIL : Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) treatment by treating the backfill in immediate contact with foundation at the rate of 5 litres of emulsion concentrate of 1.0 percent of clorophyrifos per square metre of vertical surface area covering 10 years guarantee on bond paper. | 8,047.71 | Sqm | 123 ₹9,89,868.33 Lowest | 150 ₹12,07,156.5 |
| 10.00 | ANTI TERMITE TREATMENT - ABOVE GROUND LEVEL : Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 1.0 percent of clorophyrifos per square metre of surface area covering ten years guarantee on bond paper. | 2,856.19 | Sqm | 118 ₹3,37,030.42 Lowest | 130 ₹3,71,304.7 |
Tender Value
₹17.4 Cr
EMD Value
₹8.7 L
Closing Date
9 Jan 2026, 5:30 pmClosed
Commissioner of Fisheries, MH, Mumbai
Mittal Tower, C-24, Nariman Point, Mumbai
To establish a multi-species fish seed production center at Village Wagheshwar (Ubhadanda) Taluka Vengurla, District Sindhudurg.
2025_COFM_1263447_1
01 for the year 2025-26
Open Tender
Civil Works
Item Rate
365 days
Village Wagheshwar (Ubhadanda) Taluka Vengurla, Di
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
₹8.7 L
Commissioner of Fisheries, MH, Mumbai
29 Sept 2026
26 Dec 2025
12 Jan 2026
26 Dec 2025
9 Jan 2026
1 Jan 2026
26 Dec 2025 - 30 Dec 2025
30 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART A-1 CIVIL & PLUMBING WORKS | - | - | - | - |
| 2 | SITE CLEARANCE : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 12,519 | Cum | - | - |
| 3 | SITE EXCAVATION : Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means | 14,875 | Cum | - | - |
| 4 | FILLING INSIDE THE PREMISES : Filling in plinth and floors with approved excavated material in 15cm. to 20cm. layers including watering and compacting etc. complete. | 5,670 | Cum | - | - |
| 5 | EXCAVATION - UPTO 1.50 M : Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 4,356.38 | Cum | - | - |
| 6 | EXCAVATION - ABOVE 1.50 M to 3.00 M : Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means | 6,234.02 | Cum | - | - |
| 7 | EXCAVATION FOR PILE : Empty boring for 325 to 400 mm dia bored R.C.C. cast in situ piles including withdrawal of shell, removal of earth to a distance of 50 metres etc. complete. Spec :(As directed by Engineer in Charge) | 522.6 | Rm | - | - |
| 8 | ANTI TERMITE TREATMENT - BELOW GROUND LEVEL : Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. | 16,914.23 | Sqm | - | - |
| 9 | ANTI TERMITE TREATMENT FOR BACK FILLING SOIL : Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) treatment by treating the backfill in immediate contact with foundation at the rate of 5 litres of emulsion concentrate of 1.0 percent of clorophyrifos per square metre of vertical surface area covering 10 years guarantee on bond paper. | 8,047.71 | Sqm | - | - |
| 10 | ANTI TERMITE TREATMENT - ABOVE GROUND LEVEL : Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 1.0 percent of clorophyrifos per square metre of surface area covering ten years guarantee on bond paper. | 2,856.19 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
DrawingBooklet2.pdf
Tender Documents • 36.33 MB
DTP2.pdf
Tender Documents • 1.11 MB
DTP1.pdf
Tender Documents • 1.50 MB
BOQ_2177181.xls
BOQ • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .