Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC BANSI POST BINA SONBHADRA UP PIN 231220 | BINA | SONBHADRA | UTTAR PRADESH | 231220 | ₹4.4 L Quoted ₹3.8 L | L1 | Accepted-AOC As per approved tcr |
| 2 | L2₹4.0 LRejected-Finance MAJAN KALA P O KACHANI DIST SINGRAULI M P 486887 | SINGRAULI | MADHYA PRADESH | 486887 | ₹4.0 L | L2 | Rejected-Finance As per NIT |
| Sl No | Description | Qty | Unit | M/s PIPIRANT ENTERPRISES L1 | SHYAM AND BROTHERS ENGINEERING WORKS L2 |
|---|---|---|---|---|---|
| 1.00 | Transportation, installation & commissioning of 8 Nos. pontoons, 6.88 Ton Weight each of blocks in Turra Main Sump , Turra North Sump & Purewa bottom sump before and during monsoon 2026 as per instruction of Engineer In Charge. (Note -Required Nut bolt and welding electrodes will be arranged by Contractor, MS steel material & gases will be provided by Bina Project, NCL ) | 8 | Job | 8,500 ₹68,000 | 15,000 ₹1.2 L |
| 2.00 | Dismantling, transportation, stacking of 8 Nos. pontoons 6.88 Ton weight of 9 blocks in Turra main sump, Turra north sump & Purewa botton sump after monsoon 2026 as per instruction of Engineer In charge.(Note -Required Nut bolt and welding electrodes will be arranged by Contractor, MS steel material & gases will be provided by Bina Project, NCL ) | 8 | Job | 8,500 ₹68,000 | 14,000 ₹1.1 L |
| 3.00 | Installation of pump motor set/ alignment of motor, field switch, starter as per requirement including fixing of suction pipe, moving unit, priming, testing etc with Loading and unloading of pump motor set and its accessories for installation before, during and after monsoon 2026 as per instruction of Engineer Incharge. (Note - Required welding electrode will be arranged by contractor & Gases will be provided by Bina Project, If required) | 10 | Job | 12,000 ₹1.2 L | 9,000 ₹90,000 |
| 4.00 | Dismantling of pump motor set & other associated electrical equipments such as switch, starter etc as per requirement including suction pipe, moving unit, etc with Loading and unloading of pump motor set, starter, field switch and its accessories for placing at safe place during and after monsoon 2026 as per instruction of Engineer Incharge. (Gases and welding electrode will be provided by NCL, If required) | 10 | Job | 12,000 ₹1.2 L | 8,000 ₹80,000 |
| 5.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Updated dates
Tender Value
₹5.9 L
EMD Value
₹7,400
Closing Date
10 Apr 2026, 6:00 pmClosed
Staff Officer (EM), Bina
Office of Area General Manager Bina Project NCL U.P. 231220
Installation, shifting, commissioning and dismantling of pontoons, pump-motor sets and other associated electrical equipment at various locations in mines before, during and after monsoon 2026 at Bina Project
2026_NCL_357383_1
B/EM/eTender/2025-26/93 Dt. 23-03-2026
Open Tender
Electrical and Maintenance Works
120 days
Bina Project
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,400
6 May 2026
23 Mar 2026
11 Apr 2026
23 Mar 2026
10 Apr 2026
24 Mar 2026
23 Mar 2026 - 30 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Transportation, installation & commissioning of 8 Nos. pontoons, 6.88 Ton Weight each of blocks in Turra Main Sump , Turra North Sump & Purewa bottom sump before and during monsoon 2026 as per instruction of Engineer In Charge. (Note -Required Nut bolt and welding electrodes will be arranged by Contractor, MS steel material & gases will be provided by Bina Project, NCL ) | 8 | Job | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Dismantling, transportation, stacking of 8 Nos. pontoons 6.88 Ton weight of 9 blocks in Turra main sump, Turra north sump & Purewa botton sump after monsoon 2026 as per instruction of Engineer In charge.(Note -Required Nut bolt and welding electrodes will be arranged by Contractor, MS steel material & gases will be provided by Bina Project, NCL ) | 8 | Job | - | - | BI01010001010000000000000515BI0100001113 |
| 3 | Installation of pump motor set/ alignment of motor, field switch, starter as per requirement including fixing of suction pipe, moving unit, priming, testing etc with Loading and unloading of pump motor set and its accessories for installation before, during and after monsoon 2026 as per instruction of Engineer Incharge. (Note - Required welding electrode will be arranged by contractor & Gases will be provided by Bina Project, If required) | 10 | Job | - | - | BI01010001010000000000000515BI0100001114 |
| 4 | Dismantling of pump motor set & other associated electrical equipments such as switch, starter etc as per requirement including suction pipe, moving unit, etc with Loading and unloading of pump motor set, starter, field switch and its accessories for placing at safe place during and after monsoon 2026 as per instruction of Engineer Incharge. (Gases and welding electrode will be provided by NCL, If required) | 10 | Job | - | - | BI01010001010000000000000515BI0100001113 |
| 5Total impact of GST for the purpose of CTC | ||||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.06 MB
BOQ_370251.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid