Tender Value
₹3 Cr
EMD Value
₹30 L
Closing Date
26 Sept 2026, 5:00 pm2d left
EO
NPP BANDA
Tulsi Nagar Part-1 and 2 Drani and road cont
2026_DOLBU_1186726_1
1432/NPP/2026-27/Dt 03-09-2026
Open Tender
Civil Works
Percentage
180 days
npp banda
Please refer Tender documents.
2 documents required · 2 mandatory
₹18,800
EO
₹30 L
Yes
17 Sept 2026
17 Sept 2026
28 Sept 2026
17 Sept 2026
26 Sept 2026
17 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Tulsi Nagar work | - | - | - | - |
| 2 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge within a distance of 60metres. SI NO. 692 | 80.5 | cum | 550 | ₹44,275 |
| 3 | Excavation in foundation in ordinary soil(Loam clay or sand) including lift up to 1.5meter (5ft) and lead upto 30m (100ft) and including filling warening & rimming of excavated earth into the trenches or into the space between the building and the sides of SI No. 251 | 985.5 | cum | 120 | ₹1,18,260 |
| 4 | Sand fillling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km. (5mile) from the site of work and including watering dressing etc. Rate to include cost of all materials, labour and T&P etc. required for proper completion of the work. SI. No. 255 | 328.5 | cum | 1,000 | ₹3,28,500 |
| 5 | Concrete with 4 cm. gauge stone ballast fine sand of 1.25fm and cement in proportion of 1:4:8 in foundation and under floors with ass labour for completion of work SI No. 281 | 328.5 | cum | 4,300 | ₹14,12,550 |
| 6 | R.C.C. works cement appoved coatsesand and 2cm (1.5") gauge approved stone ballast in the proportion 1:1.5:3 in Raft foundation & footing excluding supply of reingrcement and its binding , but including its fixing and binding the same with 24 B.W.G.I. binding wire an including necessary cantering and shuttening etc. SI no. 284 | 328.5 | cum | 6,800 | ₹22,33,800 |
| 7 | R.C.C. works cement appoved coatsesand and 2cm (1.5") gauge approved stone ballast in the proportion 1:1.5:3 in Raft foundation & footing excluding supply of reingrcement and its binding , but including its fixing and binding the same with 24 B.W.G.I. binding wire an including necessary cantering and shuttening etc. SI no. 284a | 1,058.5 | cum | 7,200 | ₹76,21,200 |
| 8 | Steel Reinforcement for R.C.C work including straigthening , cutting , bending ,placing in position and binding all complete upto plinth level. DSR No. 5.2.2.1 | 707.72 | qtl | 7,798.28 | ₹55,18,975.33 |
| 9 | Dismantling cement concrete or brick or granolithic floors including base concrete and including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60metres SI NO. 697 | 4,500 | cum | 40 | ₹1,80,000 |
| 10 | Concrete with 4 cm. gauge stone ballast fine sand of 1.25fm and cement in proportion of 1:6:12 in foundation and under floors with ass labour for completion of work . SI NO. 273 | 770.4 | cum | 3,700 | ₹28,50,480 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_2233850.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .