SUPERINTENDING ENGINEER EUDC GKP
S.E Office, Bungalow no. 09, Old Powerhouse Colony, Railway station road, Gorakhpur
Engagement of Agency for Manning and Operation of Department owned Cable Fault Locator Van Including Supply of Fuel and Driver and Provision of Rectification Support Excavation Labor for 33KV, 11KV and LT Underground Cables under EUDC Gorakhpur
2026_PVVNV_1123301_1
53/EUDC(G)/2025-26
Open Tender
Electrical Works
Lump-sum
365 days
EUDC GORAKHPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SUPERINTENDING ENGINEER EUDC
₹19,500
17 Mar 2026
10 Mar 2026
8 Apr 2026
10 Mar 2026
7 Apr 2026
10 Mar 2026
Manning & Fuelling of Dept. Van Monthly charges for providing :-
Skilled Operator: (Diploma/ITI) for testing,. Commercial Driver: For Dept. Vehicle,Diesel for vehicle movement within Circle & Safekeeping & Cleaning of Van.(Availability: 24x7)
VARIABLE EXECUTION CHARGES (LABOR) 33 KV Cable Fault (Labor) :-
Assistance Basis: Rectification of 33KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is in the scope of the Supplier Firm. The Work includes digging/opening trench, barricading, manual assistance in cable preparation, High Voltage testing of cable, backfilling & levelling of road as it was earlier, laying of additional cable if required for cable jointing (in case of loop not available) and site cleaning.
Assistance Basis: Replacement of 33KV Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is in the scope of the Supplier Firm. The Work includes providing physical assistance to the Supplier’s jointer, including manual support during cable preparation (straightening/holding). The firm is also responsible for arranging safe access (ladders/scaffolding) and ensuring final site cleaning and waste disposal
Full Execution Basis: Rectification of 33 KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is NOT in the scope of the Supplier Firm. The work includes excavation, barricading, and providing a experienced cable Jointer for the installation of Straight-Through Joint (STJ). The work includes cable preparation, laying of additional cable (if required), High Voltage testing, backfilling, and road restoration. The Contractor shall also provide all necessary Tools & Plants (T&P) ,consumables, and skilled labor required for the execution of the work
Full Execution Basis: Replacement of 33KV Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is NOT in the scope of the Supplier Firm. The work includes safe dismantling of the old termination, cleaning of cable box/bushings, and providing an experienced Jointer for the installation of the store-issued kit. Scope covers cable preparation, connection to busbar/line, re-sealing, and site cleaning. The Contractor shall provide all necessary Tools & Plants (T&P), consumables, and skilled labor required for the execution.
VARIABLE EXECUTION CHARGES (LABOR) 11 KV Cable Fault (Labor) :-
Assistance Basis: Rectification of 11KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is in the scope of the Supplier Firm. The Work includes digging/opening trench, barricading, manual assistance in cable preparation, High Voltage testing of cable, backfilling & levelling of road as it was earlier, laying of additional cable if required for cable jointing (in case of loop not available) and site cleaning.
Assistance Basis: Replacement of 11KV Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is in the scope of the Supplier Firm. The Work includes providing physical assistance to the Supplier’s jointer, including manual support during cable preparation (straightening/holding). The firm is also responsible for arranging safe access (ladders/scaffolding) and ensuring final site cleaning and waste disposal
Full Execution Basis: Rectification of 11 KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is NOT in the scope of the Supplier Firm. The work includes excavation, barricading, and providing a experienced cable Jointer for the installation of Straight-Through Joint (STJ). The work includes cable preparation, laying of additional cable (if required), High Voltage testing, backfilling, and road restoration. The Contractor shall also provide all necessary Tools & Plants (T&P) ,consumables, and skilled labor required for the execution of the work.
Full Execution Basis: Replacement of 11KV Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is NOT in the scope of the Supplier Firm. The work includes safe dismantling of the old termination, cleaning of cable box/bushings, and providing an experienced Jointer for the installation of the store-issued kit. Scope covers cable preparation, connection to busbar/line, re-sealing, and site cleaning. The Contractor shall provide all necessary Tools & Plants (T&P), consumables, and skilled labor required for the execution.
VARIABLE EXECUTION CHARGES (LABOR) LT Cable Fault (Labor) :-
Assistance Basis: Rectification of LT UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is in the scope of the Supplier Firm. The Work includes digging/opening trench, barricading, manual assistance in cable preparation, High Voltage testing of cable, backfilling & levelling of road as it was earlier, laying of additional cable if required for cable jointing (in case of loop not available) and site cleaning.
Assistance Basis: Replacement of LT Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is in the scope of the Supplier Firm. The Work includes providing physical assistance to the Supplier’s jointer, including manual support during cable preparation (straightening/holding). The firm is also responsible for arranging safe access (ladders/scaffolding) and ensuring final site cleaning and waste disposal
Full Execution Basis: Rectification of LT UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is NOT in the scope of the Supplier Firm. The work includes excavation, barricading, and providing a experienced cable Jointer for the installation of Straight-Through Joint (STJ). The work includes cable preparation, laying of additional cable (if required), High Voltage testing, backfilling, and road restoration. The Contractor shall also provide all necessary Tools & Plants (T&P) ,consumables, and skilled labor required for the execution of the work
Full Execution Basis: Replacement of LT Indoor/Outdoor Cable box using Indoor/Outdoor End Termination Kit, where jointing/installation is NOT in the scope of the Supplier Firm. The work includes safe dismantling of the old termination, cleaning of cable box/bushings, and providing an experienced Jointer for the installation of the store-issued kit. Scope covers cable preparation, connection to busbar/line, re-sealing, and site cleaning. The Contractor shall provide all necessary Tools & Plants (T&P), consumables, and skilled labor required for the execution.
Attending to Underground (UG) Consumer Service Cable fault. Scope includes excavation to expose the faulty joint, repairing and sealing the cable using HT Tape, and backfilling/leveling the road to its original condition. The rate is inclusive of all labor, materials (including HT tape), Tools & Plants (T&P), and consumables required for the completion of work.
Single Phase Connection
Three Phase Connection
Supply of 11 kV Heat Shrinkable type Cable Termination Kits XLPE Cable Confirming to VDE-0278/1EEE-48-1975/IS-13573-1992 and ESI STD.09-13 and all other relevant standards complete with all accessories for the following type & size:
Outdoor size 3X185 sq mm
Indoor size 3X185 sq mm
Straight through size 3X185 sq mm
Supply of 33 kV Heat Shrinkablw type Cable Termination Kits XLPE Cable Confirming to VDE-0278/1EEE-48-1975/IS-13573-1992 and ESI STD.09-13 and all other relevant standards complete with all accessories for the following type & size:
Outdoor/Indoor size 3X300 sq mm
Straight through size 3X300 sq mm
Fuel Charges
Outstation Charges
GST extra on above rate
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_2092612.xls
BOQ • 0.30 MB
Tender_form_53.rar
Tender Documents • 0.13 MB
Ext5354.pdf
PDF • 0.21 MB
Exten53.pdf
PDF • 0.19 MB
Ext53iii.pdf
PDF • 0.17 MB
timeexe53.pdf
PDF • 0.16 MB
time_exe53.pdf
PDF • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .