Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC PASUMALAITHANGAL GINGEE VILUPPURAM | ₹1.1 Cr | L1 | Accepted-AOC Accept |
| 2 | L2₹1.2 Cr+₹6.3 L (5.63%)Rejected-AOC COIMBATORE NORTH H C M SUB DIVISION CBE 054 | COIMBATORE | TAMIL NADU | 638459 | ₹1.2 Cr+₹6.3 L (5.63%) | L2 | Rejected-AOC Reject |
| 3 | L3₹1.2 Cr+₹12.4 L (11.1%)Rejected-AOC | ₹1.2 Cr+₹12.4 L (11.1%) | L3 | Rejected-AOC Reject |
| 4 | Rejected-Technical 1 SRI GOKULAM COMPLEX 15 155B MARAPALAM MADUKKARAI COIMBATORE DISTRICT 641 105 | COIMBATORE | TAMIL NADU | 641105 | - | - | Rejected-Technical Not Satisfied |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Satisfied |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
7 Aug 2024, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Big bazaar street, Town hall, Coimbatore-1
Construction of Retaining wall at Channel from R.V.L Colony to Trichy road in ward no 60 of East Zone
2024_MAWS_468052_1
E32/2024
Open Tender
Civil Works
Works
180 days
Coimbatore Corporation
As per the tender condition attached
3 documents required · 3 mandatory
₹0
₹1.5 L
JNNURM Conference Hall, Coimbatore Corporation
24 Mar 2025
30 Jul 2024
8 Aug 2024
30 Jul 2024
7 Aug 2024
30 Jul 2024
31 Jul 2024
Amount
Earth work excavation and depositing on bank within initial lead of 10M and initial lift of 2 metre in hard stiff clay stiff black hard red earth shales murums, gravel stoney earth and earth mixed with small size boulders and hard gravelly soil, etc., complete complying with standard specification.
Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete.
Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
Supplying and erecting centering for sides soffits including supports and strutting upto 3.29m high for plain surface such as rectangular column top and bottom slabs of boxing, sill, slabs, sun shade etc., in all floors using mild steel slabs of sizes 90cm x 60cm and BG 10 stiffened with welded mild steel angles of size 25X25x3mm for boarding laid over country wood joists of size 10cm X 6.5cm spaced at about 90cm C/C and supported by casurina props of 10cm to 13cm dia spaced at 75cm C/C etc., complete as directed. Sl.No.123 C Part-II.
Reinforced Cement Concrete 1:1.5:3, one part of cement, one and half parts of sand , three parts of 20 mm hard blue granite metal by volume, characteristic strength not less than 20 N/sqmm) machine mixed for all reinforced Cement Concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., but excluding the cost and fabrication of reinforcements and also excluding centering and formwork etc., complete complying with the relevant standard specifications at all leads inside the building.
Supplying and fabricating of reinforcement steel of all diameters for reinforced cement concrete works at all heights and depths including straightening, cleaning,cutting,ending, placing in position and binding, hoisting and welding if any including cost of power, electrodes etc, cost of annealed binding wire (18 gauge), providing overlaps, tying in position and providing necessary cover blocks for all works as per detailed drawings supplied (including chairs, cranks, lap rods, spacer bars, fan hooks etc.,) with the relevant standard specifications, complete for all leads & lifts.
Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
K V K SENTHILNATHAN (BID ID -1103467)
G VENUGOPAL (BID ID -1100667)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .