| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.6 LAccepted-AOC | ₹50.6 L Quoted ₹42.8 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹48.2 L+₹5.3 L (12.4%)Rejected-Finance E MUTHILINGAPURAM VILLAGE SATTUR TALUK VIRUDHUNAGAR DISTRICT UNDER MADURAI DIVISIONAL OFFICE OF TAMIL NADU STATE OFFICE | VIRUDHUNAGAR | TAMIL NADU | 626001 | ₹48.2 L+₹5.3 L (12.4%) | L2 | Rejected-Finance Other than L1 Bidder |
| 3 | L3₹49.5 L+₹6.7 L (15.6%)Rejected-Finance | ₹49.5 L+₹6.7 L (15.6%) | L3 | Rejected-Finance Other than L1 Bidder |
| 4 | L4₹51.2 L+₹8.4 L (19.6%)Rejected-Finance | ₹51.2 L+₹8.4 L (19.6%) | L4 | Rejected-Finance Other than L1 Bidder |
| 5 | L5₹55.5 L+₹12.7 L (29.7%)Rejected-Finance C 103 UGATI HEIGHTS NR SWAGAT RAINFOREST 1 KUDASAN POR RAO KUDASAN GANDHINAAGR 382421 GUJARAT | AHMADABAD | GUJARAT | 382421 | ₹55.5 L+₹12.7 L (29.7%) | L5 | Rejected-Finance Other than L1 Bidder |
Tender Value
Refer Docs
Closing Date
2 Jun 2026, 3:00 pmClosed
Mukesh Kumar
Indian Oil Bhawan Gariahat Road, Dhakuria Kolkata-700068
LT among Empanelled Mechanical Contractors CAT M1 Rs 0 Lacs to Rs 100 Lacs for M and I Compliance works in Tank No M09 CRVT Dia 30m Ht 11 point 4m at Haldia Refinery Terminal under West Bengal State Office
2026_ERO_190001_1
ER MAC/2026-27/LT-95
Limited
Mechanical Works
Works
180 days
LT among Empanelled Mechanical Contractors CAT M1
Please refer tender Document
2 documents required · 2 mandatory
Exempted
23 Jun 2026
26 May 2026
3 Jun 2026
26 May 2026
2 Jun 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | INTERNAL PAINTING OF PRODUCT TANKS (OTHER THAN ATF) IN ZONE- A and ZONE- B : FIRST TIME PAINTING / FULL RE-PAINTING
Applicable for CRVT / IFRVT / EFRVT Tanks; painting area as per IOCL specification depending on hydro-carbon (product) stored in the Tank.
Note : 1. Application for External / Internal painting for all product tanks shall be carried out by means of AIRLESS SPRAY PAINTING SYSTEM only.
2. The item rates for above should include provision of double staging scaffolding with MS pipes, drawing to be approved by Site-Engineer.
i. Surface Preparation as per Sa 2½
ii. Primer : P1- Inorganic Zinc Ethyl Silicate - Single Coat, DFT 65-75µ
iii. Intermediate Coat : P5- Epoxy Zinc Phosphate : Single Coat, DFT 35-40µ
iv. Finish : F3- Amine adduct cured HB Epoxy Liner - 2 Coats (100-125µ each), DFT 200-250µ
Total Min DFT 300µ | 1,400 | M2 | 1,017.65 | ₹14,24,710 |
| 2 | EXTERNAL PAINTING OF PRODUCT TANKS (ALL PRODUCTS INCLUDING ATF & WATER) IN ZONE- A : RE-PAINTING / MAINTENANCE PAINTING
Surface preparation by power tool cleaning and painting of the tank as per details of specification given hereunder and the Techno-Commercial bid.
ii) for CONE ROOF tanks : Surface preparation by power tool cleaning & painting the Outside surface of tank shell upto and including curb angle, upperside surface of roof, roof & shell appurtenances of CONE ROOF tanks (CRVT / IFRVT) including all fittings and appurtenances etc.; providing IOC logo with tank writing work as per enclosed specifications (Table-1) and drawings.
Note : 1. Application for External / Internal painting for all product tanks shall be carried out by means of AIRLESS SPRAY PAINTING SYSTEM only.
2. The item rates for above should include provision of double staging scaffolding with MS pipes, drawing to be approved by Site-Engineer.
i. Surface Preparation as per St-2 / St-3
ii. Primer : P4- Self Priming HB Epoxy mastic Coating - Single Coat, DFT 100-125µ
iii. Intermediate Coat : U1- Polyamide cured HB Epoxy MIO - Single Coat, DFT 100-125µ
iv. Finish Coat : F1- Two Pack Acrylic Poly-Urethane (PU) - Single Coat, DFT 50-60µ (2 coats of 25-30µ)
Total Min DFT 250µ | 300 | M2 | 643.41 | ₹1,93,023 |
| 3 | INTERNAL PAINTING OF PRODUCT TANKS (FOR ATF TANK) IN ZONE- A and ZONE- B : PATCH / TOUCH UP PAINTING
Applicable for ATF Storage Tank; painting area as per IOCL specification
Note : 1. Application for External / Internal painting for all product tanks shall be carried out by means of AIRLESS SPRAY PAINTING SYSTEM only.
2. The item rates for above should include provision of double staging scaffolding with MS pipes, drawing to be approved by Site-Engineer.
i. Surface Preparation as per St-3
ii. Primer : P2- Polyamide cured Epoxy Zinc Phosphate - Single Coat, DFT 70-75µ
iii. Finish Coat : F3- Amine adduct cured HB Epoxy Liner - 2 Coats (100-125µ each), DFT 200-250µ
Total Min DFT 270µ | 280 | M2 | 724.17 | ₹2,02,767.6 |
| 4 | EXTERNAL PAINTING OF PRODUCT TANKS (ALL PRODUCTS INCLUDING ATF & WATER) IN ZONE- A : FIRST TIME PAINTING
Surface preparation by Blast cleaning and painting of the tank as per details of specification given hereunder and the Techno-Commercial bid.
ii) for CONE ROOF tanks : Surface preparation by power tool cleaning & painting the Outside surface of tank shell upto and including curb angle, upperside surface of roof, roof & shell appurtenances of CONE ROOF tanks (CRVT / IFRVT) including all fittings and appurtenances etc.; providing IOC logo with tank writing work as per enclosed specifications (Table-1) and drawings.
Note : 1. Application for External / Internal painting for all product tanks shall be carried out by means of AIRLESS SPRAY PAINTING SYSTEM only.
2. The item rates for above should include provision of double staging scaffolding with MS pipes, drawing to be approved by Site-Engineer.
1. Surface Preparation : as per Sa 2½
2. Primer : P1- Inorganic Zinc Ethyl Silicate - Single Coat, DFT 65-75µ
3. Intermediate Coat : U1- Polyamide cured HB Epoxy MIO - 2 Coats , DFT 200-250µ (2 coats of 100-125µ)
4. Finish Coat : F1- Two Pack Aliphatic Acrylic Poly-Urethane (PU) - 2 Coats, DFT 50-60µ (2 coats of 25-30µ).
Total Min DFT 315µ. | 750 | M2 | 808.39 | ₹6,06,292.5 |
| 5 | Dismantling of MS Plates in bottom, shell & roof of CRVT/ FRVT/ IFRVT Tanks either partly or in full as directed, by gas/hacksaw cutting from the existing weld seams & removing the MS plates from the tank by mechanical means, with utmost precaution and neatly straightening and storing at a place indicated by site engineer anywhere in IOC premises, etc complete irespective of lead and lift as directed. The rate includes the cost of labour, gases, providing necessary temporary supports, safe walk ladder, safety precautions, etc., all necessary equipments, all necessary structures, clamps, suitable non-combustible material wedges, etc. complete to the satisfaction of site-in-charge. Plan area and average thickness of steel plates will be considered for calculating the quantity of dismantled plates. Weight of appurtenances will not be considered seperately in measurement and no extra payment for the same will be made.
Note: Contractor has to submit the dismantling methodology clearly stating the restraining techniques to be involved so that circularity of the undamaged Shell plates remains undisturbed, prior to commencement of work and has to get it approved from IOCL. Steel Plates, structures, apputenances, etc should be dismantled with utmost care as these are to be reutilised. | 10 | TON | 33,458.2 | ₹3,34,582 |
| 6 | Supply of Mild Steel Plates of suitable width and length ranging in thickness from 5 mm to 28 mm as required, conforming to IS 2062 Gr. 'B' / IS 2062 E250B, Fully Killed (Un-trimmed and un-normalized condition of approved make).
Rate should also include cost of inspection by IOCL approved 3rd Party inspection agency as listed elsewhere in the tender document.
The item should be executed with prior approval from Engineering Department. | 0.5 | TON | 83,482.7 | ₹41,741.35 |
| 7 | Structural Steel Works in Vertical Tanks:
Supplying, transporting, fabricating, erecting Structural Steel work from rolled sections and built-up sections like flats, tees, angles, channels, plates, pipes, etc for various structural elements as required .
Preparation of drawing, design & specification shall be arranged by contractor at his own cost as per guidance of IOCL. Item also includes Painting as per below mentioned painting scheme :
i. Surface Preparation : St-2 / St-3
ii. Primer : P4- Self priming HB epoxy mastic coating - 1 Coat, DFT 100-125µ
iii. Intermediate Coat : U1- Polyamide cured HB Epoxy MIO - 1 Coat, DFT 100-125µ
iv. Finish Coat: F1- Two pack Acrylic Poly-Urethane (PU) - 1 Coat, DFT 40-50µ
Total DFT minm 240µ
etc. all complete as per drawing, specification and direction of Site-In-Charge.
However, painting scheme for structural steel work inside tank to be considered as per painting scheme of the internal surface of that tank. The make of Structural Steel / tubular steel shall be of SAIL/ Tata/ RINL/ Jindal or equivalent as approved by EIC. In case some small Mild Steel sections are not manufactured by SAIL/Tata, steel of other manufactuer may be used which must confirm the relevant IS code with prior approval of Engineer-In-Charge." | 1,000 | KG | 151.95 | ₹1,51,950 |
| 8 | FABRICATION, ERECTION & WELDING OF MS PLATES OR STRUCTURALS FOR REPAIR OF EXISTING CR / IFR / EFR VERTICAL TANKS FOR PRODUCT / WATER STORAGE OR ANY OTHER STRUCTURAL WORKS:
Item includes replacement of bottom, annular, shell and roof plates in existing Tank. It also includes replacement of shell manhole reinforcement plate, wind girder plates, other structurals like staircase, ladder, handrail, crossover, bridges, pipe support structures etc. All other items such as labour, equipment, power, consumables, etc shall be supplied by contractor. While replacing roof plates of existing tanks, special care should be taken to avoid local sagging/depression in the roof plates.
Note :
a) The steel plates shall be of Mild Steel Plate conforming to IS 2062 GR.'B' / IS 2062 E250B fully killed & will be free issue material for this item.
b) Item does not include dismantling of damaged plate in existing tanks.
c) Rate to include making all arrangment for proper installation of new plates after dismantling of damaged plates.
d) The rate shall be inclusive of provision of metalic tubular scaffolding up to required height as per site condition.
e) Item does not include any painting works of steel plates.
f) Radiography will be paid separately as welding shall conform to radiography quality. | 11,000 | KG | 28.65 | ₹3,15,150 |
| 9 | Welding (5 to 8 mm thick plate):
Cleaning, gouging/grinding /bevelling as required and carrying out welding of joints of required size wherever required/left out on the tank after surface preparation by grinding if required. Item includes testing of weld joints by DP test, chalk kerosene etc, if required. Scaffolding , if required, will be paid separately. | 75 | RM | 7,722.66 | ₹5,79,199.5 |
| 10 | Removal of existing internal paint including primer completely by grit blasting to SA 2 1/2. Scaffolding if required will be paid separately. | 50 | M2 | 235.3 | ₹11,765 |
stage.html
html • 0.08 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.36 MB
IOCL_Painting_manual_and_Color_code_2021.pdf
Additional Documents • 31.89 MB
Tender-Acceptance-Format.pdf
Additional Documents • 0.08 MB
FAQs-IOCL-Online-EMD.pdf
Additional Documents • 0.55 MB
BOQ_200280.xls
BOQ • 0.41 MB
LT_ALL_Combinations.xls
Tender Documents • 0.35 MB
Special_Instructions_to_the_Bidders_Version_5_dated_30_June_2025.pdf
Additional Documents • 2.80 MB
TenderDocPartA.pdf
Tender Documents • 1.22 MB
TenderDocPartB.pdf
Tender Documents • 1.19 MB
02_Revised addendum to IOCL painting manual 2021.pdf
Additional Documents • 5.55 MB
03_Painting brand name revised dtd 030823.pdf
Additional Documents • 0.15 MB
04_Specifications for scaffolding.pdf
Additional Documents • 0.42 MB
16_Civil Works Specification 2023 1st revision.pdf
Additional Documents • 15.06 MB
17-18_SPECIFICATION MECHANICAL ELECTRICAL WORKS.pdf
Additional Documents • 0.67 MB
21_GCC.pdf
Additional Documents • 3.30 MB
22_Layout drawing HLD A.pdf
Additional Documents • 1.82 MB
24_List of Preferred Makes_Engineering Materials_22 04 26.pdf
Additional Documents • 1.71 MB
Job Safety Analysis for Works at Retail Outlets.pdf
Additional Documents • 4.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .