| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.3 LAdmitted-Finance | ₹43.3 L | L1 | Admitted-Finance |
| 2 | L2₹39.3 L−₹4.0 L (9.32%)Admitted-Finance | ₹39.3 L−₹4.0 L (9.32%) | L2 | Admitted-Finance |
| 3 | L3₹5.8 Cr+₹5.4 Cr (1244.4%)Admitted-Finance 901 9TH FLOOR WINDFALL SAHAR PLAZA J B NAGAR ANDHERI EAST MUMBAI 400059 MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | ₹5.8 Cr+₹5.4 Cr (1244.4%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KGS ENGINEERING WORKS L1 | V T Corp Pvt.Ltd. L3 | MAHESH TUBEWELL WORKS L2 |
|---|---|---|---|---|---|---|
| 1.00PART - A (SUGAULI) :Repairing of ESP Internals and Replacement of related casing For 110 TPH Boilers as per below Specifications and attached tender document: | ||||||
| 1.01 | Repairing of ESP Internals and Replacement of related casing for 110 TPH Boilers as per below Specification:
The broad work scope of repairing of ESP Internals and replacement of its damaged parts shall include, but is not limited to the followings:
1. Work Location: All repair activities as mentioned below shall be performed at the HBL Sugauli plant. All tools, tackles, Scaffolding, manpower will be arranged by HBL.
2. Preliminary Inspection and Assessment: To carry out detailed inspection of the ESP to assess the extent of damage, identify the damaged plates, worn-out parts, and areas requiring repair or replacement.
3. Dismantling and Removal: To dismantle the necessary components of the ESP for access to the damaged plates. Cutting & removal of old damaged parts.
a. Repair/refurbishment/internals replacement and commissioning of the ESP system is carried out.
b. Casing Plate dismantling, fabrication, erection & welding of both side (Field # 01 & #02).
c. Hopper partition plate fabrication, erection & welding (field#01 & #02).
4. Fabrication & replacement of Plates:
a. Structural materials like plates, Angle, Channel are under HBL's scope.
b. All consumable items like welding electrode, filler rod, Argon gas, LPG, Oxygen, cutting wheel, grinding wheel, etc. are under contractor scope.
PLEASE REFER TO THE JOB SCOPE FOR DETAILS | 1 | LS | 36,72,400 ₹43,33,432 | 4,93,71,470 ₹5,82,58,334.6 | 33,30,000 ₹39,29,400 Lowest |
Tender Value
Refer Docs
Closing Date
30 Jul 2025, 3:00 pmClosed
CHIEF MANAGER PURCHASE
PATN ABIHAR
SUPPLY OF SPARES INCLUDING DISMANTLING, REPAIRING, REFITTING, COMMISSIONING AND AIR LOAD TEST OF EXISTING ELECTROSTATIC PRECIPITATOR (ESP) OF 110 TPH BOILER ON TURNKEY BASIS AT HBL PLANT SUGAULI, EAST CHAMPARAN AND LAURIYA, WEST CHAMPARAN, BIHAR.
2025_HPCLB_240689_1
HBL/TEN/PUB/25-26/095
Open Tender
Miscellaneous Works
Works
56 days
SUGAULI AND LAURIYA
AS PER ATTACHED TENDER DOCUMENT
2 documents required · 2 mandatory
₹0
Exempted
7 Aug 2025
8 Jul 2025
31 Jul 2025
8 Jul 2025
30 Jul 2025
8 Jul 2025
8 Jul 2025 - 22 Jul 2025
PART - A (SUGAULI) :Repairing of ESP Internals and Replacement of related casing For 110 TPH Boilers as per below Specifications and attached tender document:
Repairing of ESP Internals and Replacement of related casing for 110 TPH Boilers as per below Specification: The broad work scope of repairing of ESP Internals and replacement of its damaged parts shall include, but is not limited to the followings: 1. Work Location: All repair activities as mentioned below shall be performed at the HBL Sugauli plant. All tools, tackles, Scaffolding, manpower will be arranged by HBL. 2. Preliminary Inspection and Assessment: To carry out detailed inspection of the ESP to assess the extent of damage, identify the damaged plates, worn-out parts, and areas requiring repair or replacement. 3. Dismantling and Removal: To dismantle the necessary components of the ESP for access to the damaged plates. Cutting & removal of old damaged parts. a. Repair/refurbishment/internals replacement and commissioning of the ESP system is carried out. b. Casing Plate dismantling, fabrication, erection & welding of both side (Field # 01 & #02). c. Hopper partition plate fabrication, erection & welding (field#01 & #02). 4. Fabrication & replacement of Plates: a. Structural materials like plates, Angle, Channel are under HBL's scope. b. All consumable items like welding electrode, filler rod, Argon gas, LPG, Oxygen, cutting wheel, grinding wheel, etc. are under contractor scope. PLEASE REFER TO THE JOB SCOPE FOR DETAILS
Description of Work / Item(s)
PART - B (LAURIYA) :Supply of Thermax Make ESP Internals For 110 TPH Boiler as per below Specifications and attached tender document:
Collecting Plate (9440*1.25MM) Rigitrode Pipe DIA-2.2MM Stud Material Of Frame- A513GR-D Make-TATA/SAIL/JSW/THERMAX
Emitting Electrode (Pipe &Spike Type ) (OD38.1X10210X1.25MM) Rigitrode Pipe DIA-2.2MM Stud Matrial -Carbon Steel Material Of Frame A 513GR-D Make- TATA/SAIL/JSW/THERMAX
HT C- Clamp (Size-50*50MM) Make- TATA/SAIL/JSW/THERMAX
Rapper Controller Card (Make - Auto data, MTP Module)
Fasteners M 12 40MM Long (HT)
Fasteners M 12 50MM Long (HT)
Discharge Electrode Frame
Collecting Electrode Bottom Tadpole
Collecting Electrode Top Tadpole
PART - B (LAURIYA) :Service Parts: Repairing of ESP Internals and Replacement of related casing For 110 TPH Boilers as per below Specification:
The repair work of the Electrostatic Precipitator (ESP) involves the following major activities for successful repairing of works: 1. Dismantling, Erection & Refitting: Collecting Plates: Quantity: 260 Nos, Size: 9440 mm × 457 mm × 1.25 mm Job: Removal of burnt-out plates and installation of new/repaired ones. Emitting Electrodes: Quantity: 240 Nos, Size: Ø38.1 mm × 10210 mm × 1.25 mm Job: Dismantling of damaged electrodes and fitting of new ones. 2. Installation of ESP Components: Shaft Insulators (Rapper Coil), Support Insulators, Insulator Heaters, Hopper Heaters, Screen Tubes. These components must be fitted or replaced as required. 3. Additional Mechanical and Electrical Work: Dismantling and erection of 1st pass collecting & emitting electrodes Repair and maintenance in the 2nd pass Two-field alignment of ESP fields TR (Transformer-Rectifier) Set Testing: Open and close circuit tests, Air load test 4. Compliance and Execution Requirements: All dismantling, erection, and refitting works are to be strictly carried out as per original OEM drawings. All tools and tackles necessary for the job are within the vendor's scope. The vendor is also responsible for arranging all required materials and consumables, including Oxygen and LPG gases, Welding rods, Hydra/crane and other lifting equipment, etc. PLEASE REFER TO THE JOB SCOPE FOR DETAILS
KGS ENGINEERING WORKS (BID ID -876126)
V T Corp Pvt.Ltd. (BID ID -879490)
MAHESH TUBEWELL WORKS (BID ID -879123)
Bidder Name
V T Corp Pvt.Ltd.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .