Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance 10 0 RAMBAG COLONY RATLAM RATLAM MADHYA PRADESH 457001 | RATLAM | MADHYA PRADESH | 457001 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹35.3 L
EMD Value
₹70,520
Closing Date
28 Sept 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RnB Division Kulgam
Executive Engineer RnB Division Kulgam
Upgradation of Hanger Palnoo Noonmia Turigam road by way P/L of 50mm thick bituminous Macadam and 25mm thick semidense with 6mm thick seal coat mechanically with paver (Agg. length 1.20 Kms)
2020_PWDJK_104976_1
71/2020-21/RNB/Kul/4223-43 Dated 19-09-2020
Open Tender
Civil Works
Item Rate
8 days
Kulgam
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,100
Executive Engineer RnB Division Kulgam
₹70,520
29 Sept 2020
21 Sept 2020
29 Sept 2020
21 Sept 2020
28 Sept 2020
21 Sept 2020
120 days
Amount
Providing and applying of tack coat using hot straight run bitumen of grade 80/100 including heating the bitumen, spraying the bitumen with mechnical operated spray unit fitted on bitumen boiler,cleaning and preparing the existing road surface as per specifications clause 503 of MOST on WBM Surface @0.75 Kg/Sqm including all carriages etc complete job.
P/L of premix Bitumen macadam base course with stone agg. of quality size and grading as specified in C.P.W. D specifications and straight run bitumen of grade 80/100 @ 3.30% by weight of total mix including hot mixing of stone agg. and bitumen in hot mix plant transporting, mixed material and laying mixed with paver finisher to the required level and grade, rolling with road roller of 8 to 10 tonne capacity to achieve the required compaction and density confirming to MOST specification (50mm compacted thickness) complete including cost and carriage of all materials.
P/L of 25mm thick Semidence asphaltic base course using mineral aggregate satisfying the gradation set out in specifications, with 5 percent binding content (by weight of total mix) bitumen of grade 80/100 @ 2.88 Kg/Sqm with the aid of hot mix plant and paver finisher including rolling with 8 to 10 tonne capacity to achieve the required compaction and density confirming to MOST specifications (with bitumen 80/100 (quarry)including cost and carriage of all materials. incld: extra carriage beyond15 Kms upto 23 Kms
Providing and laying seal coat of premixed fine agg. (Passing 2.36mm and retained on 180 micron sieve) with bitumen using 128 Kgs, of bitumen of grade 80/100 bitumen per Cum of fine agg. and 0.60 Cum of fine agg. Per 100 Sqm of road surface to achieve the desired compaction as per MOST spacifications including rolling and finishing with road all complete
ASIAN ROAD CONSTRUCTION
stage.html
html • 0.02 MB
finance_200273.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .