Loading…
Loading…
Tender Value
₹2.4 Cr
EMD Value
₹4.8 L
Closing Date
26 Aug 2026, 3:00 pm2d left
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
TRACK1
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case No balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-XIVA, of STD/Jan/26 along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
Defination of Similar Work :- Any P-Way works.
34 conditions · 8 needing a document upload
Check list should be as per the annexure-XXIII as given in the tender document attached. Note: Tenderer's attention is invited to clause 1 of Section VII and other relevant clauses of Section I and II whereby in case of nonsubmission/ non compliance, the tender offer is likely to be rejected.
1.1) Following documents are common for all types of firms i.e. Sole proprietorship, Partnership, Limited Company or JV.
(a)Tender Form (First Sheet) as per 'Annexure-I' (Mandatory)
(b) Firm details as per Annexure-II
(c)Format for Certificate as per proforma given in 'Annexure-III A' (Mandatory)
(d) List of works of similar nature physically completed in all respects in current and last three financial year as per proforma given in 'Annexure-IV'
(e)Work Completion Certificate of works mentioned in para (d) above from the Organizations with whom they worked as per proforma given in 'Annexure-V' as applicable. (Mandatory)
(f)List of works on hand as per proforma given in Annexure-VI
(g)List of plants & Machinery available on hand (own) and proposed to be inducted (own and hired to be given separately) for the subject work in Annexure-VII.
(h)List of Personnel, Organization available on hand and proposed to be engaged for the subject work in Annexure -VIII.
(i) The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-XIVA, of Standard Tender Document along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
(j)Self attested copy of Permanent Account Number (PAN) issued by Income Tax Department.
(k)The tenderer(s) are required to submit the test report of the stone ballast conforming to railways specifications as given in the condition no.7.2.2 of section-VI along with their offer, issued from the approved laboratory as listed in condition no 7.1.1(a) of section-VI in the tender documents. (This item will be applicable only for the tenders of supply of ballast).
(l)Any other document in support of his/their credentials/scheme.
(m)Contractual Receipt of the year on the Letter Head of Chartered /Cost accountant. 'Annexure-IX' (Mandatory)
1.2 In addition to Para 1.1 above certain more documents are to be submitted by tenderers as per status of their firms. These documents are listed below - (Mandatory)
1.2.1For Sole Proprietorship firm a)Affidavit as per 'Annexure - X'. b)Special power of Attorney as per proforma given in 'Annexure-XI' to be submitted by sole proprietor firm duly notarized.(Not required if tender documents are submitted by proprietor himself) (Mandatory)
1.2.2 For Partnership firm a)Self/Notary attested copies of Partnership deed. b)Special Power of Attorney as per proforma given in 'Annexure-XII' to be submitted by Partnership firm. (Not required if one or more partners are authorized in Parternership deed to sign on behalf of the firm.) (d)All other documents in terms of explanatory notes in clause 22 of Standard Tender Document.
1.2.3 For Limited Company a) Copy of Memorandum & Articles of Association of Company. b)Self /Notary attested copy of resolution passed by Board of Directors authorizing its Director/Employee to deal with tender on behalf of company. c) 15.1.1 Attested copy of Notarized Special Power of Attorney including ratification clause duly signed by person authorized by the company vide (b) above as per proforma given in 'Annexure- XIII'. d) A copy of Certificate of Incorporation (Mandatory)
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
NOTE: BE IT KNOWN TO THE TENDERER THAT :-
All mandatory documents are required to be submitted by the bidder/tenderer at the time of bidding, in case of nonsubmission/ noncompliance, the tender offer is likely to be rejected.
(a)No post tender submission of documents shall be permitted in respect of item mentioned above. However, only clarification can be called for by Railway in respect of any part / document submitted by the tenderer which shall be responded to by the tenderer within 10 working days of the date of issue of such letter for clarifications, failing which the offer shall be dealt with as per available documents.
New Bongaigaon Jn. - Rangiya Jn. - Agthori - TRR(P) - 15.800 Tkm. (Project Id - 08.04.31.26.3.53.001)
43-ENGG-RNY-2026-27~NFR
43-ENGG-RNY-2026-27
Open
Works - General
12 Months
Kamrup, Assam
₹0
₹4.8 L
3 Aug 2026
3 Aug 2026
12 Aug 2026
44 items across 3 schedules · ₹2,74,93,498.64 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Up to 40 m long rail panel | RM 31600.00 | 10.29 | — | 3,25,164 |
| 2 | For Through Rail Renewal work | TRM 15800.00 | 50.47 | — | 7,97,426 |
| 3 | For Through Rail Renewal work | TRM 15800.00 | 52.04 | — | 8,22,232 |
| 4 | For location work not involving deep screening | TRM 20000.00 | 186.69 | — | 37,33,800 |
| 5 | Through renewal of Metal / GFN liners in running track condition after cleaning of rail foot at liner seat, greasing of liner, liner seat and sealing of liner contact area at rail foot including removing, cleaning & lubrication of ER Clip & Insert Eye and re-driving the same with contractor's grease graphite of approved quality with all lead & lift. | Sleeper 10000.00 | 28.00 | — | 2,80,000 |
| 6 | Lubrication of Elastic Rail Clips on PSC sleepers with contractor's grease, conforming to Railway's specifications, labour etc. complete as per procedure prescribed in latest edition of IRPWM. | ERC 104912.00 | 4.49 | — | 4,71,054.88 |
| 7 | On Cess | Each 100.00 | 317.75 | — | 31,775 |
| 8 | In-situ situation | Each 100.00 | 446.19 | — | 44,619 |
| 9 | On Cess | Each 300.00 | 413.07 | — | 1,23,921 |
| 10 | In-situ situation | Each 300.00 | 580.90 | — | 1,74,270 |
| 11 | Hole of dia. 26.5mm and above | Each 600.00 | 341.85 | — | 2,05,110 |
| 12 | Renewal of existing SEJ along with PSC sleepers under traffic block conditions as per approved drawing including fixing of special size bearing plate, rubber pad and other sleeper / rail fittings, greasing to the fittings, leading all new materials to site, transportation of released materials within a lead of 250m, cutting of Rails, drilling of holes, fixing of related fittings, providing temporary connection with fishplates till welding of SEJ is done and sleepers shall be given initial packing to make track fit for 20KMPH speed. Note: (1) Rail cutting and hole drilling shall be paid separately. (2) One set comprise complete SEJ on both rails at SEJ. | Set 4.00 | 8822.25 | — | 35,289 |
| 13 | Lifting and packing for regrading the existing PSC sleeper track to required height / level in stages not exceeding 75mm or part thereof at a time, providing permissible ramp for the track, insertion of moorum / sand / stone ballast uniformly under the existing track and placing the same to safe approved gradient, gauge, cushion including levelling and one round of through packing to allow train movement at restricted speed of 30 kmph for a specified length with all leads & lifts and fixing, marking, painting rail level pegs at every 30m interval. Note: Lifting of track shall be done in stages as per procedure prescribed in latest edition of IRPWM to get the proposed final level as per approved working profile, as directed by Engineer in-charge. | TRM 15000.00 | 201.22 | — | 30,18,300 |
| 14 | Extra for additional lift over 75mm for every 50mm lift or part thereof up to 275mm for item nos. 083010 for each TRM. | TRM 3500.00 | 31.20 | — | 1,09,200 |
| 15 | Boxing and profiling of ballast as per procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. | TRM 15800.00 | 29.56 | — | 4,67,048 |
| 16 | 25mm gap 'in-situ' welding during traffic block using Railway's welding portion & Welder and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Only welding portion and related accessories as per Annexure - I and Welder shall be supplied by Railways. 2. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 3. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track. | Each 598.00 | 1851.75 | — | 11,07,346.5 |
| 17 | For PSC Sleeper | TRM 7000.00 | 100.51 | — | 7,03,570 |
| 18 | For PSC Sleeper Track with Sleeper Density of 1660 | TRM 31600.00 | 154.78 | — | 48,91,048 |
| 19 | For PSC Sleeper Track with Sleeper Density of 1660 | TRM 15800.00 | 119.06 | — | 18,81,148 |
| 20 | Without Rail tensor | TRM 15800.00 | 50.06 | — | 7,90,948 |
| 21 | Replacing existing glued joint rail with cut rails or with glued joint rail or insertion of glued joint by cutting existing track under traffic condition by cutting rails, refixing with all rail sleeper fastenings and providing required gaps for carrying out welding as an alternative to drilling holes or joining rails with fish plates duly drilling holes as required including stacking of released material and as directed by engineer in-charge. Note: (1) Drilling holes & rail cutting will be paid separately. (2) Transportation of materials to the site of work from supply points, if more than 250m, shall be paid separately. | Each 100.00 | 2026.57 | — | 2,02,657 |
| 22 | For 60 Kg Rails | TRM 47400.00 | 108.04 | — | 51,21,096 |
| 23 | Rails, switches, crossings, SEJ, Glued Joints, Check Rails etc. | MT 250.00 | 450.02 | — | 1,12,505 |
| Schedule total | ₹2,54,49,527.38 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_correction_Slip_no_11.pdf GCC Correction Slip no 11
ATTACHMENT
TD_43-ENGG-RNY-2026-27.pdf Tender Document
ATTACHMENT
GCC_correction_Slip_no_11.pdf
ATTACHMENT
TD_43-ENGG-RNY-2026-27.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].