Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance NO 172 VAZHAPANTAL ROAD STREET MAMBAKKAM ARCOT TALUK VELLORE DIST 632 318 | MAMBAKKAM | ARCOT TALUK | TAMIL NADU | 632318 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 3139 TEACHERS COLONY LALGUDI TRICHY 621 601 | TRICHY | TRICHY | TAMIL NADU | 621601 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹10,500
Closing Date
15 Dec 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AEE GL GCC Trichy
O/o. SE GCC TRICHY
Providing foundation concrete for 110KV Structures equipment plinth cable duct for 110KV Bay extension at existing K.Sathanur 110KV SS for the erection of new 110KV line from proposed Thuvakudy 230 110 KV SS to K.Sathanur 110KV SS.
2023_EB_394652_1
GCC 044 GL 009 2023 2024
Open Tender
Civil Works
Works
90 days
K.Sathanur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,500
Yes
23 Jan 2024
30 Nov 2023
16 Dec 2023
30 Nov 2023
15 Dec 2023
30 Nov 2023
Amount
Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete.
Earthwork excavation in soft disintegrated rock laterite soft rock or kankar not requring blasting, etc, complete
Removing hard rock by wedging, chiselling and trimming to proper shape where blasting is prohibited
PCC 1:4:8 mix using 40mm HBS machine crushed metal for foundation with out form work including cost of all labour, materials, water charges, lead, lift, curing, etc., complete.
RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, water charges, labour lead, litf, etc., complete.
Refilling with excavated earth other than sand in foundation and sides of masonry, consolidation as per std. specn. with water including all, labour, lead, lift, etc., complete.
RCC 1:1.5:3 using 12 to 20mm (machine crushed) for cable duct wall with formwork including cost of all labour, materials, water charges, lead, lift, etc, complete. But excluding cost fo steel reinforcement (by using mixer machine).
PCC 1:2:4, using 20mm HBG metal foundation with out form work including cost of cement, all materials, labour, lead, lift, etc. complete.
PCC 1:2:4, using 20mm HBG metal foundation with form work including cost of cement, all materials, labour, lead, lift, etc. complete.
RCC 1:1.5:3 using 12 to 20mm (machine crushed) for precast cover slab with formwork including cost of all labour, materials, water charges, lead, lift, etc, complete. But excluding cost fo steel reinforcement (by using mixer machine).
Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
Plastering with CM. 1:5 mix 12mm thick for wall, including cost of materials, labour, water charges, lead, lift, watering, curing, etc., complete.
Providing PVC down fall pipe using 110mm dia 4 Kg / sqcm, PVC pipe and pvc clamp line supreme etc, including fixing PVC washer type door bend & shoe, in correct position and connecting from the roof slab including cost of all materials, labour, transport lead, lift, etc., complete, including PVC accessories and washers.
Removing the excess earth to the nearby bund or low laying area instructed by field engineer including all lead, lift, etc., complete.
Labour & Fabrication, Transport & fixing of GI angles for cable duct with anchorage and placing in position as directed by the engineer at site including cost of angles,cutting and all labour, lead, lift, etc. Complete
Collection, supplying, stacking and spreading & filling of red gravel including compaction,cost of all materials lead lift labour etc complete as per the direction of site engineer.
Supply and spreading of quarry dust inside the yard as per std. spec.including cost of materials ,labour lead,lift etc
Supplying and fixing of20mm of HB stone inside the yard as per std. spec.including cost of materials ,labour lead,lift etc
Colour washing two coats of approved Plastic emulsion over one coat of white cement primer for wall including cost of all materials, labour, lead, lift, etc., complete.
Labour charges for transporting from casting yard to curing tank, curing tank to cable duct aligning and erection RCC precast slab as directed by the site engineer including all labour lead lifts etc complete
Supplying & fixing in positionISMB 200x100mm for supporting the roof with the provision of hook arrangements including cost of all materials transporting labour charges welding charges cutting charges of required sizes for holding the ISMB and one coat of primer of painting with two coat all leads and lift etc complete and placing in position as per the specification and drawing and as per directed by Engineer
Applicable GST 18%
PERUMAL.S.K
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .