Loading…
Loading…
Tender Value
₹1.4 L
EMD Value
₹2,900
Closing Date
17 Aug 2026, 5:00 pm
Executive Engineer REW Kishtwar
Hall no. 4,1st Block Mini Sectt., Kishtwar
refer BOQ
2026_RDPR_318501_4
e-NIT No 65 of REW KISHTWAR 2026-27 Dated. 29.07.2026
Open Tender
Civil Works
Percentage
30 days
KISHTWAR
refer Tender documents
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹2,900
Yes
30 Jul 2026
30 Jul 2026
18 Aug 2026
30 Jul 2026
17 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: | - | cum | - | - |
| 2 | RR Stone mass laid in cement sand motor (1:6) mix using nallah stone in found & plinth. | 1 | cum | 1 | ₹1 |
| 3 | RR massonary with hard stone (1:6) mix in foundation and plinth. | - | cum | - | - |
| 5 | Random Rubble masnory in dry | 1 | cum | - | - |
| 6 | Filling of Plinth with 50 % stone bOulder | - | cum | - | - |
| 7 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with
dash fasteners of required dia and length (hold fast lugs or with dash fasteners
shall be paid for separately): Second class kail wood | 0.6 | sqm | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work | 1 | sqm | - | - |
| 9 | Reinforcement for RCC Work including straightning, Cutting,Bending, Binding & placing in position. | - | kg | 1 | - |
| 10 | Providing RCC Slab (1:2:4) Mix including curing cost of centering and shuttering | - | sqm | - | - |
| 11 | P/laying position cement concrete of specified grade (1:4:8) mix including curing but excluding the cost of cenetering and shuttering | - | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_1050011.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].