Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.7 LAccepted-AOC 00 VIDYUT NAGAR MEERANPUR SADDARALI TANDA AMBEDKAR NAGAR UTTAR PRADESH 224238 | AMBEDKAR NAGAR | UTTAR PRADESH | 224238 | 1 | Accepted-AOC L-1 Bidder | |
| 2 | 2₹9.2 L+₹37,903 (4.28%)Rejected-AOC | 2 | Rejected-AOC L-2 Bidder | |
| 3 | 3₹10.0 L+₹1.1 L (12.6%)Rejected-AOC | 3 | Rejected-AOC L-3 Bidder |
Tender Value
₹11.8 L
EMD Value
₹24,000
Closing Date
28 Nov 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S.E. OMC-IV, BTPS, PTPP, Parichha.
Office of S.E. OMC-IV, BTPS, PTPP, Parichha
Routine and Electrical Breakdown Maintenance of various capacities of 6.6 KV motors Ranging from 340 KW to 3600 KW and 0.4 KV LT motors of Units 3and4 of PTPP Parichha Jhansi
2023_RVUNL_860287_1
N-PAR/B/OMC4/EMD1/6000003584
Open Tender
Miscellaneous Works
Fixed-rate
731 days
Parichha Thermal Power Project, Parichha.
As mentioned in tender documents
2 documents required · 2 mandatory
₹1,180
Dy CAO / DGM Accounts PTPP Parichha
₹24,000
11 Jan 2024
7 Nov 2023
29 Nov 2023
7 Nov 2023
28 Nov 2023
7 Nov 2023
7 Nov 2023 - 28 Nov 2023
Routine Maintenance of various capacities of 6.6 KV motors ranging from 340 KW to 3600 KW of unit of Unit # 3 & 4 PTPP Parichha As per scope of work Sr. No.1, 1 to 10
Proper tightening of stator copper leads, Tail cables, brass connectors, main cables etc inside cable connection box of motor at motor end as per scope of works Sl. No.2 A, 1 to 6 and Proper tightening of cable connections at breaker end as per scope of works Sl. No.2 B, 1 to 6 for Category A motor and Category B motors
Disconnection and re-connection of 6.6 KV cable connections at motor end as per scope of works Sl. No.2 C, 1 to 6 and Disconnection and re-connection of 6.6 KV cable at breaker end as per scope of works Sl. No.2 D, 1 to 7 for Category A and Category B motors.
Measuring of 6.6 KV motor & cable insulation resistance (IR) value by 2.5/5 KV megger. Measuring IR value of motor for 1min and 10min time for measuring polarization index of motor to ascertain the healthiness of motor as per scope of works Sl. No.2 E, 1 to 10 Category A and Category B motors.
Repairing of stator copper cable end of 6.6 KV Motor as per scope of work Sl. No.2 F, 1 to 8 for Category A and Category B motors.
Replacement of Brass terminal connector/tail copper cable/FRP moulding joint box/nylon gland part as per scope of work Sl. No.2 G, 1 to7 for Category A and Category B motors and Replacement of C.T. of Neutral side as per scope of work Sl. No.2 H, 1 to 5 for Category B motors.
Removal & installation of neutral side CT connection box as per scope of work Sl. No.2 I, 1 to 9 for Category B motor.
Removal of 3 Phase 700 RPM, 240 Watt; 900 RPM, 500 Watt; 0.37 KW to 3.75 KW LT motor from its foundation and installation after completion of work
Removal of 3 Phase, 7.5 KW LT motor from its foundation and installation after completion of work
Removal and installation of 3 Phase, 0.37 KW to 7.5 KW LT motor fan/coupling/ bearing from /on rotor shaft.
O/H of 3 Phase 700 RPM, 240 Watt; 900 RPM, 500 Watt; 0.37 KW to 1.0 KW LT motor by shifting, dismantling, assembling & resifting to its foundations for installation
O/H of 3 Phase, 1.1 KW to 7.5 KW LT motor by shifting, dismantling, assembling & resifting to its foundations for installation
O/H of 220V DC, 8.5 KW LT motor by shifting, dismantling, assembling & resifting to its foundations for installation
Rewinding of 3 Phase 700 RPM, 240 Watt; 900 RPM, 500 Watt; 0.37 KW to 1.5 KW LT motor with new copper wire exactly like original winding
Rewinding of 3 Phase, 2.2 KW to 7.5 KW LT motor with new copper wire exactly like original winding
Repairing of 3 Phase 700 RPM, 240 Watt; 900 RPM, 500 Watt DE/NDE side bearing housing by re-metalizing & machining to original size
Repairing of 3 Phase 0.37 KW to 7.5 KW DE/NDE side bearing housing by re-metalizing & machining to original size
Providing new shaft for 3 Phase, 700 RPM, 240 Watt; 900 RPM, 500 Watt; 0.37 KW to 1.0 KW motors
Providing new shaft for 3 Phase, 1.1 KW to KW to 3.75 KW motors
Providing new shaft for 3 Phase, 7.5 KW motors
Re-metalizing and machining of rotor shaft to get its original shape & size. (0.37 KW to 7.5 KW motors).
Replacement of damaged end cover DE/NDE of LT motor by new end cover as per scope of work (up to 1 KW motor)
Replacement of damaged end cover DE/NDE of LT motor by new end cover as per scope of work (1 KW to 5 KW motor)
Replacement of damaged end cover DE/NDE of LT motor by new end cover as per scope of work (5 KW to 10 KW motor)
Replacement of gasket of 6.6 KV motor’s CT box & cable connection box at motor end
Overhauling of bearing vapour exhauster fan & motor as per scope of work
Replacement of cooler grass and water pipes by new one of ID fan motor external cooler
Supply and replacement of GT,ST,UAT fan blade
M/S Vikas Electricals
M/S MADHU CONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .