Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.4 LAdmitted-Finance | -33.33% | ₹12.4 L | L1 | Admitted-Finance |
| 2 | L2₹18.7 LAdmitted-Finance | -0.00% | ₹18.7 L | L2 | Admitted-Finance |
Tender Value
₹19.4 L
EMD Value
₹38,740
Closing Date
20 Feb 2026, 4:00 pmClosed
Executive Engineer PWD(RandB) Division Satwari
Office of the Executive Engineer PWD(RandB) Division Satwari
Upgradation of Road by way of filling Potholes from Chatha Food Godown to Hakkal via Animal Husbandary Department Office
2026_PWDJK_302498_5
Short e-NIT No. 113 of 2025-26 Dated 06-02-2026
Open Tender
Civil Works
30 days
Satwari
As per eNIT
2 documents required · 2 mandatory
₹600
Executive Engineer PWD(RandB) Division Satwari
₹38,740
Satwari
25 Feb 2026
6 Feb 2026
21 Feb 2026
6 Feb 2026
20 Feb 2026
6 Feb 2026
7 Feb 2026
Providing,laying,watering and compaction in layers exceeding 200 mm thick with 80-100 KN Road Roller Ramming ,river Bed material mixed with coarse sand and round nallah Shingle 75mm including from source of Supply to site of work.
Providing, laying, spreading and compacting graded stone aggregate (sizerange 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.
Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge.50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.5% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity.
Providing and laying semi- dense Bituminous concrete using crushedstone aggregates of specified grading, premixed with bituminous binderand filler, transporting the hot mix to work site by tippers, laying withpaver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 25 mm compacted thickness with bitumen of grade VG- 30 @5% (percentage by weight of total mix) and lime filler @ 2% (percentageby weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity.
Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying he bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On bitumen surface @ 0.50 Kg/sqm.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_981652.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid