Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance P O P S UDALGURI WARD NO 2 DIST UDALGURI BTC ASSAM | UDALGURI | ASSAM | 784113 | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Documents not found in order |
| Sl No | Description | Qty | Unit | Madan Debnath L2 | Sri Minon Mochahari L1 |
|---|---|---|---|---|---|
| 1.00 | Installation of 150 mm dia Deep Tube Well by ODEX boring | 7 | Jobs | 5,77,114 ₹40.4 L | 5,71,400 ₹40.0 L |
| 2.00 | Construction of RCC Staging with Sintex Tank (Capacity 15000 Liters) | 7 | Jobs | 9,48,462.72 ₹66.4 L | 9,39,072 ₹65.7 L |
| 3.00 | Construction of Chain Link Security fencing with gate | 7 | Jobs | 1,68,787.16 ₹11.8 L | 1,67,116 ₹11.7 L |
| 4.00 | Installation of single phase 3.0 HP Centrifufal & Submerssible Pump set including panel board, electrical cable, steel rope, column pipe, etc. and clamp, etc. all complete including Singel phase Electrical connection to Pump house. | 7 | Jobs | 2,10,968.8 ₹14.8 L | 2,08,880 ₹14.6 L |
| 5.00 | Construction of Pump House | 7 | Jobs | 86,031.8 ₹6.0 L | 85,180 ₹6.0 L |
| 6.00 | Distribition of Pipe Line with FHTC. | 7 | Jobs | 5,40,424.74 ₹37.8 L | 5,35,074 ₹37.5 L |
| 7.00 | Single phase Power Connection | 7 | Jobs | 68,490.12 ₹4.8 L | 67,812 ₹4.7 L |
| 8.00 | Site Development by Earth filling | 7 | Jobs | 12,483.6 ₹87,385.20 | 12,360 ₹86,520 |
| 9.00 | Signboard | 7 | Jobs | 12,753.27 ₹89,272.89 | 12,627 ₹88,389 |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
25 Mar 2020, 3:00 pmClosed
the Addl. Chief Engineer cum Director PHED BTC
O/o the Addl. Chief Engineer cum Director PHED BTC Kokrajhar
Construction of Bimala Nagar (Uttar Supa), No.2 Bagarikhuti (Bagarikhuti No.2), Bhawraguri(Nagrijuli Market), NonkeDongargaon No.2 (BaroSuba), Uparkhuti (BharaliChowk), Deochunga(Deochunga), Deochunga(Milan Pur) MPWSS under Baksa Division
2020_BoTC_17022_1
TN BTC/PHED/100/3
Open Tender
Water Equipments/ Meter/ Drilling/ Boring
180 days
BAKSA
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,500
Principal Secretary, BTC
₹3.6 L
Yes
1 Feb 2021
6 Mar 2020
25 Mar 2020
6 Mar 2020
25 Mar 2020
6 Mar 2020
6 Mar 2020 - 25 Mar 2020
Amount
Installation of 150 mm dia Deep Tube Well by ODEX boring
Construction of RCC Staging with Sintex Tank (Capacity 15000 Liters)
Construction of Chain Link Security fencing with gate
Installation of single phase 3.0 HP Centrifufal & Submerssible Pump set including panel board, electrical cable, steel rope, column pipe, etc. and clamp, etc. all complete including Singel phase Electrical connection to Pump house.
Construction of Pump House
Distribition of Pipe Line with FHTC.
Single phase Power Connection
Site Development by Earth filling
Signboard
Madan Debnath
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_25849.xls
BOQ • 0.21 MB
SBD_100_PHE_Final.pdf
Tender Documents • 0.39 MB
Download all tender documents and submit your bid