Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAccepted-AOC | ₹3.6 Cr | L1 | Accepted-AOC AS UPLOADED |
| 2 | L2₹3.6 Cr+₹23,812.50 (0.07%)Rejected-AOC | ₹3.6 Cr+₹23,812.50 (0.07%) | L2 | Rejected-AOC AS UPLOADED |
Tender Value
Refer Docs
EMD Value
₹7.3 L
Closing Date
19 Feb 2024, 11:00 amClosed
SUPERINTENDING ENGINEER,
OFFICE OF SUPERINTENDING ENGINEER, GANDAK IRRIGATION WORKS CIRCLE-2, GORAKHPUR(U.P)
FLOOD PROTECTION WORK OF ASAWANPAR GAHIRAGHAT BUND BETWEEN KM. 2.000 TO KM. 2.200 ON RIGHT BANK OF RIVER RAPTI IN DISTRICT GORAKHPUR.
2024_UPIDC_895426_9
04/SE/2023-24
Open Tender
Civil Works
Item Rate
90 days
GORAKHPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,614
₹7.3 L
Gorakhpur
23 Mar 2024
13 Feb 2024
19 Feb 2024
13 Feb 2024
19 Feb 2024
13 Feb 2024
13 Feb 2024
Amount
Earth work in cutting for making proper slope with dressing upto profile and excavated earth utilised in filling for making proper slope with dresing and mainul compaction upto profile including all lead, lift, cost of all material, labour, T&P etc complete as per direction of Engineer-in-charge.
Supplying, filling and placing of HDPE woven bags confirming to BIS No. 14887-2014 of Cement bag size, filled with earth/RBM, sewing with Machine and packing in Nylon crate size (1.0X1.0X1.0)m with mesh size (20.00X20.00)cm. and weight not less than 300gram per No. including cost of all material, labour, carriage, T&P etc complete for construction of platform for launching apron as per direction of engineer incharge.
Supplying and laying of Mzp stone boulder (25 to 60)kg in mechanically woven double twisted Hexagonal shaped wire mesh gabion box/Crate of size (1.0x1.0x1.0) M., Mesh size (10x12)cm of 10 SWG G.I. wire for construction of Launching Apron including cost of all Material, Carriage & Labour T&P etc.as per direction of engineer incharge.
Supplying and laying of 200 gsm Geo Textile sheet below boulder pitching with pegs including preparation of sub-grade with all cost of material, labour, carriage, T&P etc complete as per direction of engineer incharge.
Supplying and pitching of Mzp. Cut stone boulder (25 to 60)kg on slope as per Drawing including cost of all material, labour, carriage, T&P etc complete as per direction of engineer incharge .
Dismantling and relaying of pitching on slope as per Drawing including cost of all material, labour, carriage, T&P etc but excluding cost of stone boulder But Exculiding cost of boulder complete as per direction of engineer incharge .
M/S MALL CONSTRUCTIONS AND SUPLAYERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .