| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC SALBAGAN ROAD BENACHITY DURGAPUR BARDHAMAN BARDHAMAN 713213 WEST BENGAL INDIA | DURGAPUR | BARDHAMAN | WEST BENGAL | 713213 | ₹8.3 L | L1 | Accepted-AOC TC recommendation |
| 2 | L2₹8.6 LRejected-Finance | ₹8.6 L | L2 | Rejected-Finance TC recommendation |
| Sl No | Description | Qty | Unit | UNITED ENGINEERING ENTERPRISE L1 | GT ENTERPRISE L2 |
|---|---|---|---|---|---|
| 1.00Discription of items | |||||
| 2.00 | DISMANTLING OF BOILER SHED AT TILABONY COLLIERY, REMOVING OF GI SHEET, PARELING STEEL STRUCTURE ETC | 1 | ls | 28,000 ₹28,000 | 29,002 ₹29,002 |
| 3.00 | THICKNESS MEASURING OF BOILER SHELL PLATE BY ULTRASONIC THICKNESS MEASURING GAUGE & CONDUCTING DRY INSPECTION. | 1 | ls | 25,000 ₹25,000 | 25,895 ₹25,895 |
| 4.00 | LIFTING OF VERTICAL BOILER FROM FOUNDATION TO TRUCK & TRANSPORTION THE SAME TILADONI TO KHANDRA NKJ UNIT. | 1 | ls | 45,000 ₹45,000 | 46,611 ₹46,611 |
| 5.00 | INSTALLATION OF VERTICAL BOILER AT FOUNDATION & ALLIGNMENT OF THE SAME. | 1 | no | 22,000 ₹22,000 | 22,788 ₹22,788 |
| 6.00 | HIGHER CHARGES OF CRANE FOR LIFTING OF VERTICAL BOILER S FROM TILABONI COLLIERY & INSTALLATION OF THE SAME AT NIEU UNIT AND REMOVING OF THE OLD AND DAMAGED DOILER AT NKJ | 2 | times | 25,000 ₹50,000 | 25,895 ₹51,790 |
| 7.00 | INSTALLATION OF 4" STEAM & 2" FEED PIPE LINE & VERTICAL BOILER AS PER DRAWING WITH NUT & BOLTS STEAM JOINT ETC. | 1 | ls | 55,000 ₹55,000 | 56,969 ₹56,969 |
| 8.00 | PREPARATION OF DRAWING FOR STEAM & FEED PIPE LINE, APPROVAL OF THE DRAWING FROM DIRECTOR OF BOILER W.B., KOLKATA | 1 | set | 24,000 ₹24,000 | 24,859 ₹24,859 |
| 9.00 | STATUTORY CHARGES FOR APPROVAL OF DRAWING, LAB TEST OF STEAM & FEED PIPE, SUBMISSION OF FORM IIIA. | 1 | ls | 52,000 ₹52,000 | 53,862 ₹53,862 |
| 10.00 | GETTING APPROVAL FROM DIRECTOR OF BOILERS FOR CONDUCTING THE JOB UNDER REGULATION 392 OF IBR | 1 | ls | 23,000 ₹23,000 | 23,823 ₹23,823 |
Updated dates
Tender Value
₹8.3 L
EMD Value
₹10,400
Closing Date
29 Nov 2025, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
installation of one no. of vertical boiler after shifting from tilaboni colliery to Khandra Colliery, NKJ Unit under Bankola Area
2025_ECL_347462_1
ECL/GM/BA/E TENDER/25-26/ENM/205 Dt 15.11.2025
Open Tender
Electrical and Maintenance Works
30 days
Khandra Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,400
6 May 2026
15 Nov 2025
1 Dec 2025
15 Nov 2025
29 Nov 2025
15 Nov 2025
15 Nov 2025 - 19 Nov 2025
DISMANTLING OF BOILER SHED AT TILABONY COLLIERY, REMOVING OF GI SHEET, PARELING STEEL STRUCTURE ETC
THICKNESS MEASURING OF BOILER SHELL PLATE BY ULTRASONIC THICKNESS MEASURING GAUGE & CONDUCTING DRY INSPECTION.
LIFTING OF VERTICAL BOILER FROM FOUNDATION TO TRUCK & TRANSPORTION THE SAME TILADONI TO KHANDRA NKJ UNIT.
INSTALLATION OF VERTICAL BOILER AT FOUNDATION & ALLIGNMENT OF THE SAME.
HIGHER CHARGES OF CRANE FOR LIFTING OF VERTICAL BOILER S FROM TILABONI COLLIERY & INSTALLATION OF THE SAME AT NIEU UNIT AND REMOVING OF THE OLD AND DAMAGED DOILER AT NKJ
INSTALLATION OF 4" STEAM & 2" FEED PIPE LINE & VERTICAL BOILER AS PER DRAWING WITH NUT & BOLTS STEAM JOINT ETC.
PREPARATION OF DRAWING FOR STEAM & FEED PIPE LINE, APPROVAL OF THE DRAWING FROM DIRECTOR OF BOILER W.B., KOLKATA
STATUTORY CHARGES FOR APPROVAL OF DRAWING, LAB TEST OF STEAM & FEED PIPE, SUBMISSION OF FORM IIIA.
GETTING APPROVAL FROM DIRECTOR OF BOILERS FOR CONDUCTING THE JOB UNDER REGULATION 392 OF IBR
PROCESSING OF PAPERS FOR TRANSFER OF OWNERSHIP AGENT TILABONI TO AGENT KHANDRA COLLIERY.
NECESSARY MATERIALS FOR STEAM & FEED PIPE LINE 4" OF SEAMLESS STEAM PIPE ASTM-A-106 GR-8 WITH IBR TC
2" OF SEAMLESS STEAM PIPE ASTM-A-106 GR-B WITH IBR ETC
4" STEAM FLANGE TABLE-F WITH IBR TC
2" STEAM FLANGE TABLE-F WITH IBR TC
4" SEAMLESS STEAM BEND WITH IBR TC
2" SEAMLESS STEAM BEND WITH IBR TC
4" NON RETURN VALVE FLANGE TYPE WITH IBR TC
2" NON RETURN VALVE FLANGE TYPE WITH IBR TC
DISMANTLING OF BOILER SHED AT KHANDRA NKI UNIT WITH REMOVAL OF GI SHEET, PARLING, STELL STRUCTURE TO FACILITATE 1LS THE DISMANTLING OF OLD & DAMAGE BOILER & FOR ERECTION OF
RENOVATION OF BOILER FOUNDATN AT KHANDRA NKI UNIT AS PER MEASUREMENT OF NEW BOILER WITH ALL MATERIALS & LABOUR COST
DISMANTLING OF OLD AND DAMAGE VERTICAL BOILER AT KHANDRA NKI UNIT & SHIFTING THE SAME AT SAFE PLACE AS PER COILLERY INSTRUCTION
NECESSARY CLEANING OF NEWLY INSTALLED VERTICAL BOILER NO WBL 9878, DRY TEST, REPAIR, HYDROTEST, and commissioning
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendernotice_2.pdf
PDF • 1.25 MB
Tendernotice_3.pdf
PDF • 0.16 MB
BOQ_360170.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid