Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹10.6 L+₹2.7 L (34.9%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹11.4 L+₹3.6 L (45.3%)Rejected-Finance 145 1 0 NEAR OLD LIC SHIV NAGAR VILLAGE TOWN MODIPURAM CITY MEERUT MEERUT UTTAR PRADESH 250110 INDIA | MEERUT | UTTAR PRADESH | 250110 | L3 | Rejected-Finance L3 |
Tender Value
₹14 L
EMD Value
₹14,000
Closing Date
16 Apr 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Er. Prince Kumar Gautam, EE.
Electricity Construction and Work Division, Moradabad, 220 KV Sub Station Campus, Majhola, Moradabad.
Increasing Capacity of 33by11 KV Substation Kharkhonda Aajam District- Amroha
2024_PVVNL_920873_1
56/ECWD/MBD/2023-24
Open Tender
Electrical Works
Lump-sum
45 days
Moradabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Executive Engineer, ECWD, MBD
₹14,000
3 May 2024
1 Apr 2024
16 Apr 2024
1 Apr 2024
16 Apr 2024
1 Apr 2024
Supply of following Items :- (By Contractor) for Item No. 1.01 to 1.11 1.01 Stone Pad (300×300×75mm)
PG Clamp for Dog conductor to Panther Conductor /Dog Conductor
Number Plate with Clamp & Nuts
Danger Board & Clamps with Bolts and nuts
MS Nut & Bolts
Barbed Wire GI
G.I Pipe 150 mm Dia, 3 mtr long
33KV CT Junction Box
Holding Clamp for GI Pipe
Holding Clamp for Channel and Angle
M.S U-type holding clamp for earthing of neutral (Delta)
Safe carriage of following with loading & unloading at both ends respectively. (under jurisdiction of PVVNL) or Item No. 2.01 to 2.26 2.01 33 KV Bus Isolator 800 Amp/Line Isolator
33 KV Fuse Set
33 KV Lightening Arrestor
33 KV Post Insulator
24 Volt Battery & Battery charger Set
2x2.5 mm2 Control Cable
4x2.5 mm2 Control Cable
11 KV 3×300mm2 XLPE Cable Jointing Kit (Outdoor)
11 KV 3×300mm2 XLPE Cable Jointing Kit (Indoor)
11 KV 3×185mm2 XLPE Cable Jointing Kit (Outdoor) / 11 KV 3×50mm2 XLPE Cable Jointing Kit (Outdoor)
11 KV 3×185mm2 XLPE Cable Jointing Kit (Indoor) / 11 KV 3×50mm2 XLPE Cable Jointing Kit (Indoor)
11 Mtr. ST Pole, SP-55 Bottom Galvanized
11 KV Disc Insulators T&C Type 45 KN Polymeric
11 KV Disc fitting 45 KN
11 KV Polymeric Pin Insulator
M.S. Earthing Rod of 20×2500mm and 6 SWG Wire
Stay Complete (Stay Rod 16×1800mm, Stay Wire 5 Kg, Stay Insulators, Sty Clamps, bolts & nuts with grouting)
11 KV TPMO (3 Phase)
11 KV Fuse Set (drop out) (3 Phase)
11 KV Outgoing Switch Gear 200/100/5A 350MVA
ACSR Dog Conductor
11KV 3x300 mm2 XLPE Cable / 11KV 3x185mm2 XLPE Cable / 11KV 3x50mm2 XLPE Cable
33/11KV 05MVA Power Transformer (safe carriage from any one of the PVVNL Store/33/11KV Subsation as per RESPO Norms to working place)
M.S Channel 100x50x6mm
M.S Channel 65x65x6mm
M.S Round 32mm Dia
Safe Shifting of 10MVA (If allowed in writing by E.E, Construction,MBD)/05MVA, 33/11 KV, Power transformer from out side of switchyard to near Power transformer plinth in Switchyard.
Erection & Installation of 10MVA(If allowed in writing by E.E, Construction,MBD)/05MVA Power transformer on Power Transformer plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage after providing new radiator seals etc by the contractor in case of 5MVA T/F complete job in all respect. Reconnecting 2 Nos. earthing strip to transformer body.
Earthing of Outdoor Equipments in Switchyard, as per site requirement/as per PVVNL guideline details as given below:- for Item No. 4.01 to 4.02 4.01 Providing &laying of G.I.Strip of size 50x6mm for connecting the earthmat with each equipment (Bus Isolators, 33KV C.T., 33KV V.C.B., L.As., Fuse Set, Post Insulators, T/F Body & its neutral and M.S.Frame of Cabe Supporting Structure), various steel structures. The work also includes cutting, bending, straightening, over laping and welding the earth strip with earth mat and by using high quality arc welding in already digged trenches, as per PVVNL guidline and as per site requirement.
Fixing M.S Round 32mm dia and Making delta earthing for power T/F neutral/L.A as per RESPO Norms.
Making earthing of all 11KV Switchgears, P.T. and other outdoor equipments on both earth terminal inside the control room by G.I.Strip in size 50x6mm. with 32mm. dia M.S.Round laid in trench with proper electric welding, as per PVVNL guidline.
Supply & Erection of Water level earthing by Boring and lowering by providing of G.I.Pipe size 40mm dia, into the ground upto water level or minimum 20Mtr, which ever is more, with the lower end of solid copper cone Approx 224mm long and 750gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG, from the cone upto the ground surface where it will be bolted to the G.I. Strip for Transformer neutral connection, the G.I.Strip will be connected to star point through providing Copper Bond Strip of size-35x6mm, as per PVVNL guidline.
Installation of 33KV Bus Isolator/Line Isolator with structure, Fabrication, excavation, erection, grouting (with cement, coarse sand and stone shingle) and making of plinth of BUS ISOLATOR STRUCTURE as per RESPO Drawing, as per PVVNL guidline and site requirements :for Item No. 7.01 to 7.02 7.01 Fabrication of Structure, including cutting, straightening & drilling of holes in Channel/Angle including supply of materials.
Excavation of earth, Grouting of structure in C.C. ratio 1:4:8, Erection of Line/Bus Isolator structure in proper alighment., Making plinth by C.C. ratio 1:3:6 and 12mm thick plastering on plinth in ratio 1:4
Installation & mounting of materials on erected structure (The Work also includes safe removal of old items & Height incrasing of existing structures by providing M.S Channel/Angle as per site requirement if applicable) : for Item No. 8.01 to 8.03 8.01 Mounting of 33KV Post Insulator
Mounting of 33KV L.A
33KV Bus Isolator / Line Isolator
Erection of I/C Switchgear, Bus Coupler, O/G Switchgears & Double T/F Control panel in alignment, in Control Room, including safe shifting, from Dump Place. The work also includes safe removal of old switch gears to safe place if applicable. Making 4No. Pockets for each and providing/fixing of Reg Bolt by CC in ratio 1:2:4, with tightening also. As per PVVNL guidline.
Commissioning & fixing of Bus bar (Copper), between each Switchgear, Double T/F Control panel control cable, by bolt, nut & washers and HT compound and providing & tapping HT Tape, Empire Tape & PVC Tape, on each joint & Bus Coupler connect which existing Bus-bar. ( If extra fitting/adjustment or suitable copper bus-Bar for fitment required then provided by the contractor)
Construction of double pole structure :- Erection for Double Pole Structure on STP 11M.long, with fabrication of all accessories, such as Channel/Angle, 11KV TPMO, Fuse Set, Disc Insulator & Pin insulators etc & Fixing of all accessories on Double Pole, by providing &fixing M.S.Clamp with Bolt,Nut&Washers. Earthing to be on each supports by M.S.Earthing Rod and connecting between Rod &Supports, by G.I wire of 6 SWG as per RESPO Norms.
Grouting of STP 11M. long, with CC in ratio 1:4:8, complete in all respect, as per RESPO Norms.
Fixing of Stay Set-16x1800mm. on Double Pole, including digging of pits of size-0.75x0.75x1.5M. Grouting in CC ratio 1:4:8 Cement, Sand & Stone Shingle. Binding and nozelling of Stay Wire, complete in all respect, by providing & fixing of Stay Clamp, as per RESPO Norms.
Preparation of 11 KV Power Cable ends: as per RESPO specification of the following : for Item No.14.01 to 14.02 14.01 Making of cable end termination by Heat shrinkable Out door jointing kits suitable for 11KV, 3x300q.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect.
Making of cable end termination by Heat shrinkable indoor jointing kits suitable for 11KV, 3x300Sq.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect.
Preparation of 11 KV Power Cable ends: as per RESPO specification of the following : for Item No.15.01 to 15.02 15.01 Making of cable end termination by Heat shrinkable Out door jointing kits suitable for 11KV, 3x185q.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect.
Making of cable end termination by Heat shrinkable indoor jointing kits suitable for 11KV, 3x185Sq.mm XLPE cable. Providing, fixing and crimping of proper size good quality lugs complete in all respect.
Making, Fabrication and erection of neutral earthing L Type support made of M.S. Channel size 100×50mm. Structure shall be 4 Mtr. long with 1 Mtr. Arms. Structure shall be grouted in ratio 1:3:6 in block size 300×300×700mm and painted with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint work includes connecting neutral bushing rod of power Transformer and M.S. Earthing strip with the help of flexible copper bond size 35x6mm ( by providing) M.S. Bolt and washer.
Cable Support : for Item No. 17.01 to 17.02 17.01 Making, Fabrication and erection of cable support made of two pieces of M.S. Channel (100x50x6)mm, joined to each other by means of M.S. channel pieces of each by welding at equal intervals and grouting in a block of size (300x1000x1000)mm in C.C. 1:3:6 complete with one coat of ready mixed primer and two coats of Al. paint. Work includes providing of three Nos. M.S. clamps made of (50x6)mm M.S. Flat for holding the cable including nuts and bolts with stone Pad of size (300x300x75mm).
Providing & Fixing 110mm dia 2mm thick 2M long G.I.Pipe over 11KV, 3x300Sq.mm XLPE Cable before mounting the 2No. Cable on cable support structure. Work includes fixing of Clamp, sealing of top and bottom end of the G.I.Pipe. One end of G.I.Pipe is to be buried under earth about 500mm.
Copper bus bar support T-type M.S.Structure (As per site requirement) : for Item No.18.01 to 18.02 18.01 Making Fabrication and grouting erection of M.S. frames for support of copper Bus Bar in L.V. side of Power transformer. The M.S. frame shall be made of M.S. channel (100x50)mm in 'T' shape. drilling of 3 Nos. hole on the top channel for fixing of 03No. 33 KV Post insulator. The M.S. frame shall be painted with one coat of primer & two coat of aluminium paint and grouting the frame in C.C. ratio 1:3:6 in a block of size (300x300x700) mm with stone Pad (by providing) of size (300x300x75mm). The work also includes the fixing of 33KV Post Insulator by Aluminium binding wire in complete with nut & Bolts.
Supply & Fabrication of copper bus bar of size (2400x50x6)mm in L.V. side for 05MVA and (3000x65x8)mm for 10MVA T/F as per requirement for power transformer, Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor 11 KV cable box as well as providing empire tape and H.T. tape etc. for proper insulation work covering copper Bus-Bar in Complete.
Fixing of Cable Box on 5MVA/10MVA T/F, 11KV Switchgears, by Bolt & Nuts and tapping the joints by providing HT/Empire/PVC Tape.
Mounting of 11KV Cable boxes on Double Pole, by providing & fixing of M.S.Clamp, made of 65x6mm. M.S.Flat, with Bolts,Nuts & Washers, including providing & fixing 3mm. thick 150mm. dia G.I.Pipe-3M.long, with pipe supporting Clamp-2No. on each, made of 65x6mm M.S.Flat.
H.T. Power Cable Laying : for Item No.28.01 to 28.02 28.01 Laying and dressing of 11 KV 3×300 mm2/3×185 mm2 power cable in air/Trench.
Laying 11 KV, 3×300mm2/3×185mm2 XLPE, Power cable from power T/F to incoming switchgear/outgoing switch gear to 11 KV double poles in the cable trench 0.45m wide, 0.90m depth. Providing 150 mm thickness local sand for cushion beneath and 150 mm above the cable (quantity of local sand required 0.375 cubm/m in length). The cable shall be duly protected by brick. On both side of cable by laying bricks vertically and bricks would also be laid horizontally on top of vertically laid bricks along the cable (minimum 18 Nos. per mtr. length are to be laid top and outer side along the cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal's, back filling of earth and testing and commissioning of power cables etc. Spare cable shall be left over and laid in the trenches in shape of 6m rings at both ends. At the end of feeder cables, where the cable is to be laid across pucca/main road, 150 mm dia G.I. pipe will be weared over the cable in the cable trench for the protection of cable. G.I Pipe 150mm dia will be provided by contractor.
Laying of Control Cable in Packka Trench, from VCB/CTs/T/F to 33KV Control Panel and making connection for operation & protection of equipments, by using ferrules including commissioning battery charger with battery by providing copper lead with lugs etc & dressing of Control Cable and making arrangement for testing in the equipments.
Assembling and installation of the cabinet of 24 volt battery and battery charger including grouting of foundation bolt as per manufacturer drawing in control room including safe shifting. The electric connection between battery and battery charger by providing flexible copper lead of size 7/20SWG shall be done properly. The work including wireing upto control pannels, testing & commisnoning in al respect as per pvvnl guidline.
Providing & fixing 1 No. MCB Box 63amp. TPN and 03 No. 32 Amp. SPN box and power plug on wall and it is proper grouting including it is connection with A/C supply by providing proper size of connection wire as per pvvnl guidline.
Painting of the following structure with one coat of ready mixed primer and two coats of ISI Mark Alumn. Paint after rubbing with sand paper to the surface of the structure includidng labour and T&P complete in all respect.:for Item No.26.01 to 26.06 26.01 – Line Isolator Structure
Fuse Set Structure
Post Insulator, L.A.Structure
V.C.B.Structure, C.T.Structure
M.S.Frame for Cable, Neutral, cable stand
11KV Double Pole Structure on SP-55 STP
Providing of Chequerred Rubber Sheet of size-1800x900x10mm. in Control Room.
Hiring of D/G Set, including carriage, loading, unloading & operating charges (with fuel) at 33/11KV Substation, :for Item No. 28.01 to 28.02 28.01 – 20 KVA, 3 Phase D/G Set for testing of Power T/F & equipments installed at Sub-station.
5 KVA, Single Phase D/G Set for Welding/Testing of equipments installed at Sub-station.
Providing required No. of Skilled Technicians for testing & Commisning to work on power T/F, HT/LT Panels, during testing as assisting technical hands of test team during commissioning & energisation. After installation of new protection equipments (33KV VCB, C.T & Double T/F, single T/F Control panel/existing all control panels) the contractor will ensure its testing on his own expences.
Fixing of droper channel 100x50x6mm, 3200mm long with 02 no. clamp, nut & bolt.
SHASHI ENTERPRISES
Hi-tech power transmission
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .