Tender Value
₹3.4 Cr
EMD Value
₹6.8 L
Closing Date
17 Aug 2026, 5:00 pmClosed
Executive Engineer
Theog Division, HP.PWD., Theog
C/O Civil work, W.S.and S.I. site development, Rain Harvesting Tank and Septic tank etc)
2026_PWD_140585_1
PW.THD/CB-tender/2026-3448-62
Open Tender
Civil Works - Buildings
Percentage
547 days
HPPWD
As per GCC
14 documents required · 14 mandatory
₹10,000
₹6.8 L
14 Sept 2026
5 Aug 2026
18 Aug 2026
5 Aug 2026
17 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EARTHWORK : Cutting in earth work by mechanical means or manual means in all heights and depths in all kinds of soil, including saturated soil comprising of pick work, jumper work and blasting work both in soft and hard rock with chiesling and wedging out of rocks (where blasting is prohabited) and their intermediate classification of soil including dewatering whereever required,settling out to required lines,levels as shown on the drawing and directed by the Engineer in charge at site according to the HP.PWD specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful materials to be stacked at suitable site as per satisfication of Engineer -in- Charge along with levelling fine dressing and with all kinds of labour , mechanical tools and equipment and safety measures and incidental necessary to complete the work by mechanical means and labour (if required). All useful material such as stones, shingles, aggregate,sand slates shall be properlystacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per the direction of the Engineer-in-Charge and all surplus excavated earth will be disposed off at approved dumping site which will be arranged by the contractor at his own cost. Any loss to thepublic and private property during the course of execution and disposal of serviceableand unserviceable materials shall betheabsoluteresponsiblity of the contractor and shall have to be dully compensated by him in all respectsincluding all incidental charges. | 2,049.3 | Per cubic Metre | 734.7 | ₹15,05,620.71 |
| 2 | Excavation in foundation and trenches in earth work . in all heights and depth etc. in all kinds of soils including , saturated soil comprising of ,pick work, jumper work, blasting work both in soft and hard rock with chiselling and wedging outof rock ( where blasting is prohibted) and there intermediate classification of soils including dewatering whereever required, setting out to required lines, levells as shown on the drawing and direted by the Engineer-in-Charge at site, according to the PWD specification of 1990 ( One thousand nine hundered ninety) volume-I ( one) and sorting out useful and unuseful materials and transportation of the useful materials for disposing at dumping site ( to be arranged by the contractor) as per satisfication of Engineer-in- Charge through all modes of transportations including head load, animal load or mechanical means along with levelling fine dressing and with all kinds of labour , machineries, tool equipments and safety measures and incidents necessary to complete the work by mechanical means and labour (if required). All useful materialsuch as stones, shingles, aggregatesand slates shall be properlystacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per the direction of the Engineer-in-Charge. and all surplus excavated earth will be disposed off at approved dumping site which will be arranged by the contractor at his own cost. Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsiblity of the contractor and shall have to be dully compensated by him in all respects including all incidental charges. | 709.51 | Per cubic Metre | 756.5 | ₹5,36,744.32 |
| 3 | CONCRETE WORK : Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone - III) : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth including carriage of materials within all leads and lifts. | 91.45 | Per square Metre | 589 | ₹53,864.05 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering in Retaining walls any thickness including attached pillasters, columns, piers, abutments, pillers, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc. upto all heights and levels excluding cost of centring, shuttering and finishing including including carriage of materials with in all leads, lifts and other incidentals: (i) 1:3:6 ( 1 cement :3 sand: 6 graded stone aggregate 20 mm nominal size} | 283.5 | Per cubic Metre | 5,680 | ₹16,10,280 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement : 4 coarse sand): 8 graded stone aggregate 40 mm nominal Size) including carriage of materials with in all leads, lifts and other incidentals. | 16.05 | Per cubic Metre | 5,241 | ₹84,118.05 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering: All work up to plinth level 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggre-gate 40 mm nominal Size including carriage of materials with including carriage of materials within all leads and lifts. | 81.91 | Per cubic Metre | 4,800 | ₹3,93,168 |
| 7 | FORM WORK :-Centering and shuttering including strutting, propping etc. and removal of form for including carriage of materials with in all leads, lifts and other incidentals :- Foundations, footings, bases of columns, etc. for mass concrete | 139.26 | Per square Metre | 243.3 | ₹33,881.96 |
| 7.01 | Columns, Pillars, Piers, Abutments, Post and struts. | 583.2 | Per square Metre | 517.4 | ₹3,01,747.68 |
| 7.02 | Lintels, beams, plinth beams, girders,bressumers and cantilevers. | 589.92 | Per square Metre | 404 | ₹2,38,327.68 |
| 7.03 | Suspended floors, roofs and the like. | 481.69 | Per square Metre | 479.4 | ₹2,30,922.19 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
GCCHospital.pdf
Tender Documents • 5.94 MB
BOQ_208546.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .