| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.6 LAdmitted-Finance | ₹87.6 L | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹18.5 L (21.1%)Admitted-Finance | ₹1.1 Cr+₹18.5 L (21.1%) | L2 | Admitted-Finance |
| 3 | L3₹1.1 Cr+₹18.9 L (21.5%)Admitted-Finance | ₹1.1 Cr+₹18.9 L (21.5%) | L3 | Admitted-Finance |
| 4 | L4₹1.1 Cr+₹20.2 L (23.0%)Admitted-Finance | ₹1.1 Cr+₹20.2 L (23.0%) | L4 | Admitted-Finance |
| 5 | L5₹1.1 Cr+₹22.1 L (25.2%)Admitted-Finance | ₹1.1 Cr+₹22.1 L (25.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Ms Bichitra Kumar Jena L4 | Skater Infratech India Pvt. Ltd. L7 | MAA DAKHINAKALI ENTERPRISERS L8 | M/s. P N Construction L5 | Harihar Nayak L2 | M/S.RAMESH CHANDRA MOHANTY L10 | Padmanav Lenka L3 | NIRANJAN SAHOO L9 | Nilamani Swain L6 | M/S JAY JAGANNATH ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Scarifying bituminous road surface upto 50 mm depth by mechanicalmeans and disposal of dismantled materials up to a lead of 1000 metres or at identified location, stacking serviceableandunserviceablematerials separately including all labour, machineries, materials, T&P,taxes fuel, hire and running charges of all machinery etc. all complete as directed by Engineer-In-charge.(Excluding GST). | 1,115 | Each Sqm. | 1 ₹1,115 | 1.89 ₹2,107.35 | 2 ₹2,230 | 3 ₹3,345 | 0.01 ₹11.15 Lowest | 3 ₹3,345 | 4 ₹4,460 | 5 ₹5,575 | 2 ₹2,230 | 2.3 ₹2,564.5 |
| 2.00 | P.C.C(1:3:6) of using 20 mm. & down C.B.G chips of approved quality infoundation & plinth including mixing hosting, laying to proper level &slope compacting, curing, watering charges etc. complete including cost& supply of all materials, labour, T&P, taxes, etc. complete butexcluding cost of GST as directed by Engineer-in-charge | 111.5 | Each Cum. | 2,900 ₹3,23,350 | 3,089 ₹3,44,423.5 | 3,000 ₹3,34,500 | 2,000 ₹2,23,000 | 1,000 ₹1,11,500 Lowest | 3,600 ₹4,01,400 | 2,500 ₹2,78,750 | 2,900 ₹3,23,350 | 3,000 ₹3,34,500 | 2,668 ₹2,97,482 |
| 3.00 | Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for all floors,foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, etc. all complete but excluding GST as directed by Engineer-in-charge. | 223 | Each Cum. | 4,600 ₹10,25,800 | 5,589 ₹12,46,347 | 5,000 ₹11,15,000 | 4,700 ₹10,48,100 | 4,200 ₹9,36,600 | 5,200 ₹11,59,600 | 4,800 ₹10,70,400 | 5,000 ₹11,15,000 | 4,800 ₹10,70,400 | 4,060 ₹9,05,380 Lowest |
| 4.00 | Supply of Tor/TMTsteel rebars with minimum grade of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works binding the grills with binding wireof18to20gaugeincludingsupply of steel, labour, materials, transportation charges, T&P, taxes, etc. all complete but excluding GST as per the direction of Engineer-in-charge. (NB: No payment shall be made for extra weight than theoretical co-efficient). | 100.35 | Each qntl | 5,200 ₹5,21,820 | 5,089 ₹5,10,681.15 | 5,600 ₹5,61,960 | 5,800 ₹5,82,030 | 5,000 ₹5,01,750 | 6,600 ₹6,62,310 | 5,500 ₹5,51,925 | 6,500 ₹6,52,275 | 5,900 ₹5,92,065 | 4,408 ₹4,42,342.8 Lowest |
| 5.00 | Rigid smooth leak proof centring & shuttering for RCC work with Ply/Steel plank & bullah of approved quality in all areas as per requirment of site at any height & de-shuttering the same after prior period of concrete setting including supplying of labours, materials, scaffolding, T&P all complete as per the direction of Engineer-in-charge. | 137.2 | Each Sqm. | 80 ₹10,976 | 89.02 ₹12,213.54 | 95 ₹13,034 | 50 ₹6,860 | 10 ₹1,372 Lowest | 65 ₹8,918 | 100 ₹13,720 | 100 ₹13,720 | 58 ₹7,957.6 | 63.8 ₹8,753.36 |
| 6.00 | Providing and laying 75 mm thick bituminousmacadam with using1.06 cum of 40 mm and down C.B. chips for 10 Sqm area consuming52.50 Kg of VG-30 bitumen including heating bitumen in required tempconveying metal and chips from stacks feeding in bitumenmixture inrequired quantity to ensure thorough pre coating , applying tack [email protected]/10Sqm before laying the precoated mix conveying theprecoated mix , layingtogradeandcamber,compactedwithPRR,brooming ofdust fromroadsurfacebefore laying the biuminiousmacaddam allcomplete with supply of all material labour transporationhire and running charge of equipments, taxes ,tollage , royalties etc allcomplete but excluding GST as directed by EIC | 37.13 | Each cum | 4,200 ₹1,55,946 | 2,589 ₹96,129.57 | 4,100 ₹1,52,233 | 3,000 ₹1,11,390 | 50 ₹1,856.5 Lowest | 5,000 ₹1,85,650 | 4,200 ₹1,55,946 | 4,500 ₹1,67,085 | 4,100 ₹1,52,233 | 3,248 ₹1,20,598.24 |
| 7.00 | Providing & laying 20mm thick premix carpet using 0.27cum of13.2mm to 5.6mm size crushed stone chipping and 14.60kg.penetration grade of bitumen for 10sqm including hand packing toproper camber and consolidation with PRR including hire and runningcharges of PRR, hot mix plant, bitumen boilers and all other T & Particles as per specification including Supply of all material , labour ,T&P, hire and running charge of Equipments , taxes ,tollage etc allcomplete but excluding GST. as ditrected by EIC. (by using minibatching plant and bitumen boiler at site) | 35,102 | Each Sqm. | 140 ₹49,14,280 | 110 ₹38,61,220 | 147 ₹51,59,994 | 120 ₹42,12,240 | 165 ₹57,91,830 | 140 ₹49,14,280 | 138 ₹48,44,076 | 145 ₹50,89,790 | 147 ₹51,59,994 | 95.7 ₹33,59,261.4 Lowest |
| 8.00 | Providing & laying 6mm thick precoated seal coat using 0.06 cum of6.7mm size chips as per sieve analysis and 6.8Kg of bitumen per10sqm. maintain proper camber and consolidation with PRR including hire and running charges of PRR, hot mix plant, bitumen boilers and allother T & P articles with supply of all material labour transporation hireand running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC (by using mini batchingplant and bitumen boiler at site) | 35,102 | Each sqm | 50 ₹17,55,100 | 55.89 ₹19,61,850.78 | 48 ₹16,84,896 | 60 ₹21,06,120 | 60 ₹21,06,120 | 40 ₹14,04,080 | 35 ₹12,28,570 Lowest | 40 ₹14,04,080 | 43 ₹15,09,386 | 40.6 ₹14,25,141.2 |
| 9.00 | Blinding road surface with 6mm thickQuarryDustoverthefinalsurfaceofbitumenwithsupplyofallmateriallabourtransporation hireand running charge of equipments, taxes ,tollage , royalties etc allcomplete but excluding GST as directed by EIC | 35,102 | Each sqm. | 3 ₹1,05,306 | 4.89 ₹1,71,648.78 | 3 ₹1,05,306 | 5 ₹1,75,510 | 0.01 ₹351.02 Lowest | 5 ₹1,75,510 | 3 ₹1,05,306 | 5 ₹1,75,510 | 2.5 ₹87,755 | 4.64 ₹1,62,873.28 |
| 10.00 | Cleaning the existing black topped surface with removal of foreignmaterials with brooms or soft brushes and finally dusting witholdgunnybagsand/orcompressed air to receive bitumin tack coat withsupply of all material labourtransporationhireandrunningchargeofequipments, taxes , tollage , royalties etc all complete but excludingGST as directed by EIC | 35,102 | Each Sqm. | 2 ₹70,204 | 3.89 ₹1,36,546.78 | 2 ₹70,204 | 3 ₹1,05,306 | 0.01 ₹351.02 Lowest | 2 ₹70,204 | 2 ₹70,204 | 2 ₹70,204 | 1 ₹35,102 | 2.9 ₹1,01,795.8 |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
26 Jul 2025, 6:00 pmClosed
EE,R and B,PPA
Office of the Roads and Building Division Engineering Department, Paradip Port Authority, Ground Floor, Administrative Building, Ph-06722-222357 , Mob-9437120010
Annual Maintenance and Repair of colony Roads at Madhuban Area along with the Main road from Atharabanki to police station square for the year 2025-26
2025_MoS_867298_1
CE/R and B/Accts-14/25/175
Open Tender
Civil Works
Works
365 days
paradip
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Yes
As per eTCN and TD
₹3.0 L
Yes
30 Dec 2025
3 Jul 2025
28 Jul 2025
3 Jul 2025
26 Jul 2025
3 Jul 2025
Amount
Scarifying bituminous road surface upto 50 mm depth by mechanicalmeans and disposal of dismantled materials up to a lead of 1000 metres or at identified location, stacking serviceableandunserviceablematerials separately including all labour, machineries, materials, T&P,taxes fuel, hire and running charges of all machinery etc. all complete as directed by Engineer-In-charge.(Excluding GST).
P.C.C(1:3:6) of using 20 mm. & down C.B.G chips of approved quality infoundation & plinth including mixing hosting, laying to proper level &slope compacting, curing, watering charges etc. complete including cost& supply of all materials, labour, T&P, taxes, etc. complete butexcluding cost of GST as directed by Engineer-in-charge
Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for all floors,foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, etc. all complete but excluding GST as directed by Engineer-in-charge.
Supply of Tor/TMTsteel rebars with minimum grade of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works binding the grills with binding wireof18to20gaugeincludingsupply of steel, labour, materials, transportation charges, T&P, taxes, etc. all complete but excluding GST as per the direction of Engineer-in-charge. (NB: No payment shall be made for extra weight than theoretical co-efficient).
Rigid smooth leak proof centring & shuttering for RCC work with Ply/Steel plank & bullah of approved quality in all areas as per requirment of site at any height & de-shuttering the same after prior period of concrete setting including supplying of labours, materials, scaffolding, T&P all complete as per the direction of Engineer-in-charge.
Providing and laying 75 mm thick bituminousmacadam with using1.06 cum of 40 mm and down C.B. chips for 10 Sqm area consuming52.50 Kg of VG-30 bitumen including heating bitumen in required tempconveying metal and chips from stacks feeding in bitumenmixture inrequired quantity to ensure thorough pre coating , applying tack [email protected]/10Sqm before laying the precoated mix conveying theprecoated mix , layingtogradeandcamber,compactedwithPRR,brooming ofdust fromroadsurfacebefore laying the biuminiousmacaddam allcomplete with supply of all material labour transporationhire and running charge of equipments, taxes ,tollage , royalties etc allcomplete but excluding GST as directed by EIC
Providing & laying 20mm thick premix carpet using 0.27cum of13.2mm to 5.6mm size crushed stone chipping and 14.60kg.penetration grade of bitumen for 10sqm including hand packing toproper camber and consolidation with PRR including hire and runningcharges of PRR, hot mix plant, bitumen boilers and all other T & Particles as per specification including Supply of all material , labour ,T&P, hire and running charge of Equipments , taxes ,tollage etc allcomplete but excluding GST. as ditrected by EIC. (by using minibatching plant and bitumen boiler at site)
Providing & laying 6mm thick precoated seal coat using 0.06 cum of6.7mm size chips as per sieve analysis and 6.8Kg of bitumen per10sqm. maintain proper camber and consolidation with PRR including hire and running charges of PRR, hot mix plant, bitumen boilers and allother T & P articles with supply of all material labour transporation hireand running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC (by using mini batchingplant and bitumen boiler at site)
Blinding road surface with 6mm thickQuarryDustoverthefinalsurfaceofbitumenwithsupplyofallmateriallabourtransporation hireand running charge of equipments, taxes ,tollage , royalties etc allcomplete but excluding GST as directed by EIC
Cleaning the existing black topped surface with removal of foreignmaterials with brooms or soft brushes and finally dusting witholdgunnybagsand/orcompressed air to receive bitumin tack coat withsupply of all material labourtransporationhireandrunningchargeofequipments, taxes , tollage , royalties etc all complete but excludingGST as directed by EIC
Supplying of following items with supply of all labour, loading and unloading at site strore including alllabour,transportation,T&P,etc,allcomplete as directedbyEngineer- In-Charge,Exluding GST.
Modified all weather bitumen paste in liquid asphalt with chemicals anti stripping agents graded aggregate and additives (25 Kg. / Packet).
Two component ,polysulphide polymer based UV resistant flexible , tear rsistant , rubbery , self- levelling , pourable non staining sealant (16kg /Pack),
Providing, laying, spreading and compacting stone aggregates of IRC Gr-II(63 mm to 45 mm ) size to water bound macadam specificationincluding spreading in uniform thickness, hand packing, rolling withvibratory roller 8-10 tonnes in stages to proper gradeandcamber,applyingandbroming requisite and to fill uptheintersticesofcoarseaggregate with Quarry dust , watering and compacting to the requireddensity as per clause 404ofMORTH specification for Road & Bridgeworks with supply of all material labour transporation hire and runningcharge of equipments, taxes , tollage , royalties etc all complete butexcluding GST as directed by EIC
Providing & laying 37.5mm thick built up spray grouting in one layers37.5mm thick using 0.45cum of 25mm to 40mm size hard granite metaland 12.00Kg penetration grade of bitumen for 10 Sqm & 0.12cum of12mm size hard granite chips as key stone for 10 Sqm spreading overand laying including heating pouring and spreading bitumen metal andchips and rolling with PRR after scraping cleaning the road surfaceapplying tack coat using 3.0Kg of bitumen for 10 Sqm including Supplyof all material , labour , T&P, hire and running charge of Equipments ,taxes ,tollage etc all complete but excluding GST. as ditrected by EIC.
EngagementofHydraulicExcavator of 1cum bucket for each workexcavation during execution of work including supply of operator,fuel tools and plants etc all completeas directed b engineering incharge.(Excluding GST)
Providing and applying 2.5 mmthick road making strips, reflecting glass blades @ 250gm per sqm area & IRC:35(retro-reflective)ofspecifiedshade/colours using hot Thermoplastic materialbyfully/semiautomaticThermoplastic paint applicator machine fitted with profile shoe,glassbreadsdispenser,propane tank heater ,driven by experience operator on road surface including cost of material,labour ,T&P,cleaning the road surface of alldirt,seals,oil,grease and foreign material etc. all complete as per the direction of Engineer -in-charge .Excluding GST
Harihar Nayak (BID ID -3254865)
Padmanav Lenka (BID ID -3255511)
Ms Bichitra Kumar Jena (BID ID -3254563)
M/s. P N Construction (BID ID -3254850)
Nilamani Swain (BID ID -3255657)
Skater Infratech India Pvt. Ltd. (BID ID -3254644)
MAA DAKHINAKALI ENTERPRISERS (BID ID -3254822)
NIRANJAN SAHOO (BID ID -3255545)
M/S.RAMESH CHANDRA MOHANTY (BID ID -3255223)
stage.html
html • 0.05 MB
techsummary_911729.pdf
BOQ Comparative Chart
xlsx
cancelled_1.pdf
pdf • 0.20 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_911729.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .