Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.9 LAccepted-Finance | L1 | Accepted-Finance Bidder being L1. | |
| 2 | L2₹66.2 L+₹5.3 L (8.62%)Rejected-Finance | L2 | Rejected-Finance Bidder being L2. | |
| 3 | L3₹69.9 L+₹9.0 L (14.8%)Rejected-Finance NEAR MUGHAL DARBAR HOTEL PLOT NO 1 2 NEW S T COLONY KATKAT GATE AURANGABAD 431001 | CHHATRAPATI SAMBHAJINAGAR | CHHATRAPATI SAMBHAJINAGAR | MAHARASHTRA | 431001 | L3 | Rejected-Finance Bidder being L3. | |
| 4 | L4₹70.7 L+₹9.8 L (16.0%)Rejected-Finance | L4 | Rejected-Finance Bidder being L4. | |
| 5 | L5₹71.8 L+₹10.9 L (17.9%)Rejected-Finance PLOT NO 40 SECTOR A N 13 CIDCO HIMAYAT BAGH CHHATRAPATI SAMBHAJINAGAR 431 001 | CHHATRAPATI SAMBHAJINAGAR | AURANGABAD | MAHARASHTRA | 431001 | L5 | Rejected-Finance Bidder being L5. |
Tender Value
₹80.7 L
EMD Value
₹2.0 L
Closing Date
2 Oct 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Archaeologist, ASI, Nagpur Circle
Superintending Archaeologist, Archaeological Survey of India, Puratattva Bhawan, 2nd floor, Old Bungalow No. 11, Seminary Hills, Nagpur (MH) - 440006
MC and EW (CAM) to Comprehensive Conservation and Peripheral development of Lakhuji Jadhavraos Samadhi including providing seating arrangement, drinking water facility etc. at Lonar, Dist. Buldhana.
2023_ASI_771042_1
04/03/93/2023-W
Open Tender
Civil Works
Works
120 days
Raje Lakhujiraos Samadhi at Sindkhed Raja
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.0 L
Yes
30 Nov 2023
11 Sept 2023
3 Oct 2023
11 Sept 2023
2 Oct 2023
11 Sept 2023
Provision for debris clearance from the monument and premise and leveling other area including manual excavation, transportation and spreading/ stacking excavated of materials away from site including sorting out of useful materials.
Providing and laying lime concrete in floor 20 to 25 mm brick blast of well burnt mixed with 50 % lime mortar in ratio of 1:1:1 (1-lime, 1 Surkhi, 1. Sand) after removing of accumulated rubbish, including beating and treating with split bamboo and thappies till suface hardended for water tightening, including adding 2% solution of boiled water of Gum. Gur and belgiri- fruit, complete
Provision for providing and fixing of stone slab flooring over lime cocrete of thickness 75 to 100 mm stone size 0.30 x.0.45 m over cushion of lime mortar 1:1:1 ( 1 lime 1 surkhi 1 sand) of particular shape and size as per existing pattern complete.
Provision for Dismantling chain link fencing in built up sections in angles, struts, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
Provision of grill fencing of size 2.00x1.15 m having 2 Nos M.S. angle 50x50x5 mm of length 2.00 m, 2 No.50x50x5mm of length 1.00m 18Nos. 16 mm square bars of length 1.15m of pointed tip pierced form top MS angle spacing 100mm c/c and screwing the MS grill with nut/bolts in 12mm dia. hole at MS angle.
Provision for supply and fixing of double panel MS angle gate of size 3.00x3.00m with wicket gate of six 01x02 m, 15 Nos. of MMS 16 mm dia square bar with pointed tip on each panel, MS angle of size 50x50x5 mm with double padlock.
18 Feet Mild Steel Street Light Pole with installation (design will be apprved by Nagpur circle office).
LED street light branded 60-85 watt
2 core 2.5 mm armoured cable
1'' PVC pipe for underground light fitting including digging and back filling etc. complete.
6 Amp MCB, MCB box, Tape, clamp, switch etc. complete with fitting complete.
Kent RO 50 Ltr per hour capacity
Blue star stainless steel water cooler 150 Ltr capacity.
FRP fabricated cabin for water cooler with electrification cement concrete platform including installation etc. complete. As directed site in charge.
Water tank 1000 Ltr capacity with stand
Plumbing articles with fitting etc. complete.
Provision for providing the stone benches for sitting up for the tourists in the premises of the monument ( design to be approved circle office ).
Provision for stone dustbin of size 0.60 X 0.60 X 0.90 M with stainless steel removable dustbin of specific measurements complete.
Providing & fixing along with removing double Scaffolding system to support the roof structure of the building, up to 10 m height, above ground level, including additional rows of scaffolding in stepped manner as per the requirement of the site, made with 40mm to 60mm dia. wooden ballis placed 1.5 meter centre to centre, horizontal & vertical ballis joint with overlapping system in the scaffolding for working platforms etc. and maintaining it in a serviceable condition. The scaffolding systems shall be stiffened with bracings, runners made up of ballis, connecting with buildings,etc. wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen,etc. complete as per directions & approval of the Engineer-in-charge.
Provision for Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size).
Provision for painting steel work with deluxe multi surface paint to give an even shade. Two or more coat applied @ 0.90 lit / 10 sqm over an under coat of primer applied @ 0.80 ltr / 10 sqm of approved brand and manufacture.
Provision for providing and applying recessed pointing over the surface of Tomb after racking out excess water in combination motor 1:1:1(1 lime: 1 surkhi: 1 sand).
Provision for grouting in lime mortar 1:1:1(1 lime: 1 surkhi: 1: sand) required at Samadhi Chajja stitch the cracks including curing complete wherever necessary.
Providing and laying lime plaster 12 mm in roof for stopping water in lime mortar in ratio of 1:1:1 (1- lime, 1 Surkhi, 1. Sand) after removing of accumulated rubbish, including beating and treating with split bamboo and thappies till surface hardened for water tightening, including adding 2% solution of boiled water of Gum. Gur and belgiri- fruit, complete.
SHAIKH_RIYAZ_IJAJ_GOVT.CONTRACTOR
Mubarak Pathan
SIRAJUDDIN QUAZI
M/s. Shah Construction
Harsh Infrastructure
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .