Tender Value
₹1.1 L
EMD Value
₹2,240
Closing Date
1 Dec 2025, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2025_RDPR_296422_8
e-NIT 206 of REW Poonch 2025-26 Date 26-11-2025
Open Tender
Civil Works
Percentage
30 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Division Poonch
₹2,240
11 Dec 2025
26 Nov 2025
2 Dec 2025
26 Nov 2025
1 Dec 2025
26 Nov 2025
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 30% stone
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for:Foundations Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc
Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms.
Centering and shuttering including strutting, propping etc. and removal of form for: Edges of slabs and breaks in floors and walls
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level Mild steel and medium tensile steel bars
12mm Cement plaster finished with a floating coat of neat cement of mix: .1 1 : 3 ( 1 cement : 3 fine sand)
Providing and fixing G.I. pipes complete with G.I. fittings and clamps, including cutting and making good the walls etc.: 15 mm dia. nominal bore
Providing and fixing 15 mm nominal bore C.P. brass bib cock of approved quality conforming to IS : 8931
Supplying and fixing C.I. cover without frame for manholes: 20.14.1 455x610mm rectangular C.I. cover (light duty) the weight of the cover to be not less than 23 kg.
Carriage of Sand/Agg. 25 Km by MT and 200 Km By HL
Add Cost of CIB
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_960684.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .