Loading…
Loading…
Tender Value
₹2.4 L
EMD Value
₹11,750
Closing Date
20 Aug 2026, 6:55 pm
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
Development of drain mohalla road from nabi miri rehman to onwards at meeripora B
2026_RDPR_318570_52
NIT_23_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
Rathsun
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹11,750
30 Jul 2026
30 Jul 2026
21 Aug 2026
30 Jul 2026
20 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Engagement of labour for site clearance | 4 | no | 750 | ₹3,000 |
| 0_) | Earth work in excavation by mechnical means /mechanical in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 mt in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed:all kinds of soil | 19.89 | CUM | 480.4 | ₹9,555.16 |
| 0_) | Providing/Laying Stone soling Nallah hand packed on level in foundation trenches/Roomes excluding carriages of Stones.(Under foundation trench & Floors)avg H/L of 100 Mtr. | 14.12 | CUM | 1,000 | ₹14,120 |
| 0_) | Providing and laying in position cement concrete of specified grade 1:3:6 MIX including curing but excluding the cost of centring and shuttering. All work upto plinth level. | 21.52 | CUM | 5,733.4 | ₹1,23,382.77 |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form for Retaining walls, return walls, walls (any thickness) including attached pilastersbuttresses, plinth and string course fillets, kerbs and steps etc. | 92.23 | SQM | 286.35 | ₹26,410.06 |
| 0_) | Providing 12 mm plaster in 1:4 mix ratio( 1cement:4 fine sand) | 94.41 | SQM | 266.2 | ₹25,131.94 |
| 0_) | P/L of reinforced cement concrete in 1:2:4 Mix | 0.93 | cum | 7,104.3 | ₹6,607 |
| 0_) | steel Work reinforced for RCC work | 74.29 | kg | 115.35 | ₹8,569.35 |
| 0_) | Bajiri/sand for an average
lead of 15 km H/L 50 | 30.19 | CUM | 545.6 | ₹16,471.66 |
| 0_) | PROVISION FOR SIGN BOARD,WEEP HOLES OTHER ITEMS, ETC | 1 | job | 1,752 | ₹1,752 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
BOQ_1050690.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].