| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC VILL KADUA PO HARIATARA DISTT PASCHIM MEDINIPUR WB PIN 721304 | HARIATARA | PASCHIM MEDINIPUR | WEST BENGAL | 721304 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹7.5 L+₹52,400 (7.55%)Rejected-Finance | L2 | Rejected-Finance Not being L1 | |
| 3 | L3₹11.4 L+₹4.4 L (63.8%)Rejected-AOC VILL SAROT PALLY PO SANKRAIL DIST HOWRAH PIN 711313 WB | SANKRAIL | HOWRAH | WEST BENGAL | 711313 | L3 | Rejected-AOC Not being L1 |
Tender Value
₹1 L
EMD Value
₹20,000
Closing Date
30 Dec 2023, 6:00 pmClosed
CWE (AF) KALAIKUNDA
CWE (AF) KALAIKUNDA, KALAIKUNDA AIR FIELD POST, WEST MEDINIPUR (WB) - 721303
REPAIR/MAINT OF AC PLANTS, AHU AND OTHER ALLIED WORKS
2023_MES_629936_1
8648/KKD/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
AT AF STN KALAIKUNDA
AS PER NIT
7 documents required · 7 mandatory
₹500
GE (AF) KALAIKUNDA
₹20,000
Yes
1 Feb 2024
25 Nov 2023
1 Jan 2024
25 Nov 2023
30 Dec 2023
11 Dec 2023
Amount
S&F in repair expansion valve required for AC plant of Capacity 5.5 TR Complete all as specified and directed by Engr- in- Charge .
M&L for cleaning of evaporator coils of AC plant of capacity 5.5 TR as per Original Equipment Manufacturer's (OEMs) reccommendations to remove the dust particle formed on the coil & fins,cleaning of liquid lines stainer expansion valve complete all as specified and directed by Engr- in- Charge .
M&L for cleaning of evaporator coils of AC plant of capacity 11 TR as per Original Equipment Manufacturer's (OEMs) reccommendations to remove the dust particle formed on the coil & fins,cleaning of liquid lines stainer expansion valve complete all as specified and directed by Engr- in- Charge .
Comprehensive servicing for Package type 5.5 TR AC as per Original Equipment Manufacturer's (OEMs) reccommendations for a period of six months installed at various locations through OEMs Authorised Service Centre Engineers or through OEMs Certified Agencies as approved by GE, including cleaning of condensor ,carrying out necessary repairs,cleaning of filters, adjustments of assemblies, sub-assemblies, check the level of refrigerant, arresting the leakage of any type, replacement of parts, calibration including cleaning of condensor & eveporator coils fins with mild detergent and descaling of condensor coil for AC etc. or as per OEM check list through Certified Agencies as approved by GE, complete all as specified and as directed.
Comprehensive servicing for Package type 11 TR AC as per Original Equipment Manufacturer's (OEMs) reccommendations for a period of six months installed at various locations through OEMs Authorised Service Centre Engineers or through OEMs Certified Agencies as approved by GE, including cleaning of condensor ,carrying out necessary repairs,cleaning of filters, adjustments of assemblies, sub-assemblies, check the level of refrigerant, arresting the leakage of any type, replacement of parts, calibration including cleaning of condensor & eveporator coils fins with mild detergent and descaling of condensor coil for AC etc. or as per OEM check list through Certified Agencies as approved by GE, complete all as specified and as directed.
NOTES:- Applicable for BOQ Serial Item No. 3 & 3.01 here in above :- (i)S&F spare parts will be measured and paid separately under relevant item. (ii) The Contractor shall provide the following comprehensive services arising out of wear and tear of the normal running of Air Conditioners including maintenance of all mechanical, electrical and electronic parts /sub-assemblies. The preventive maintenance report will be as per the Original Equipment manufacturer's instructions (iii) Breakdown Maintenance : The Authorised Service Engineer of OEM or OEM Certified Agencies will carry out all breakdown maintenance after receiving information (written or oral) from GE (AF) KALAIKUNDA officials or their representatives, The OEM's authorised service representative or OEM certified agencies or approved will carry out the required repairs of the units and appraise GE,Engineer-in-Charge and JE the status of the break down repair at site. No payment shall be made on account of any breakdown service during maintenence period . (iii) The Service Engineer will be called in case of any breakdown and the same shall be attended within 24 Hours of lodging of complaint, failing which a penal recovery of Rs.200.00 (Rupees Two Hundred Only) per day till such time the unit is attended and complaint is resolved,will be recovered from the outstanding dues to the Contractor. (Iv) Cost of minor items like teflon tape,insulation tape, metal washers, fibre/rubber washers, screws, small nuts & bolts and like shall be deemed to be inclusive of the quoted rate. (v) Spares required for replacement of defective ones will be measured and paid seperately.
Disconnecting, dismantling and taking out existing burnt out compressor of package type AC 5.5 TR Capacity and supply and fixing sealed unit compresser of existing capacity , as per OEMs specifications,single phase, 230 V AC supply initialy filled with compressor oil/gas as speciifed by Engr-in-charge and testing on load for 24 hrs in summer complete all as specified and directed by Engr- in- Charge .
Disconnecting, dismantling and taking out existing burnt out compressor of package type AC 11 TR Capacity and supply and fixing sealed unit compresser of existing capacity , as per OEMs specifications, single phase, 230 V AC supply initialy filled with compressor oil/gas as speciifed by Engr-in-charge and testing on load for 24 hrs in summer complete all as specified and directed by Engr- in- Charge.
Comprehensive maintenance for Split Type Air Conditioner as per Original Equipment Manufacturer's (OEMs) reccommendations for a period of six months installed at various locations through OEMs Authorised Service Centre Engineers or through OEMs Certified Agencies as approved by GE, including carrying out necessary repairs,cleaning of filters, adjustments of assemblies, sub-assemblies, check the level of refrigerant, arresting the leakage of any type, replacement of parts, calibration including cleaning of condensor & eveporator coils fins with mild detergent and descaling of condensor coil for split AC etc. or as per OEM check list through Certified Agencies as approved by GE, complete all as specified and as directed. MAKE LG/Carrier/Samsung/Amtrex/Videcon /Hitachi/Blue star
Supply fixing in replacement of V Belt of size A-28, A-32 suitable for 5.5 TR Capacity package Unit AC as per OEMs specifications all as specified and directed by Engg- in - charge .
M&L micro filter for AC Plant of capacity 5.5 TR as per OEMs specifications complete all as specified
Taking out blower motor shaft from AC plant of capacity 5.5 TR , welding and grinding on lathe machine to make suitable allignment with bearing then refixed as per Original Equipment Manufacturer's (OEMs) reccommendations complete all as specified and directed by Engg- in - charge
S&F in replacement of outdoor fan motor for package AC plant of capacity 5.5 TR as per OEMs specifications complete all as specified and directed by Engg- in - charge
S&F in repair fan blade of outdoor unit of AC plant of capacity 5.5 TR as per OEMs specifications complete all as specified and directed by Engg- in - charge
S&F connector for 30-40 AMPS , 440 volts as per OEMs specifications complete all as specified and directed by Engg- in - charge
S&F Auto change over switch for package type AC plant 11 TR as per OEMs specifications complete all as specified and directed by Engg- in - charge
Supply and charging R-22 gas to maintain the required cooling effect as and when required in the split AC/ window type AC & other cooling applinces (charging cost including in this item) complete all as specified and directed by Engr- in- Charge .
Supply and charging R-407C Gas to maintain the required cooling effect as and when required in the Package type AC plant including (charging cost including in this item) complete all as specified and directed by Engr- in- Charge .
S&F in replacement of insulation Nnytriyle rubber 1/6 size as per OEMs specifications including fixing all as specified and directed by Engineer-in-charge.
All as per item No 16.00 here-in-before but 1/8 size as per OEMs specifications including fixing complete all as specified and directed by Engineer-in-charge.
All as per item No 16.00 here-in-before but 5/8 size as per OEMs specifications including fixing complete all as specified and directed by Engineer-in-charge.
S&F in replacement of Copper pipe of size 1/4 size as per OEMs specifications including fixing by brazing and jointing all as specified and directed by Engineer in charge.
All as per item No 19.00 here-in-before but size 1/2 size as per OEMs specifications including fixing by brazing and jointing all as specified and directed by Engineer in charge.
All as per item No 19.00 here-in-before but size 5/8 size as per OEMs specifications including fixing by brazing and jointing all as specified and directed by Engineer in charge.
Supply and Charging R-134 gas to maintain the required cooling effect as and when required in the water cooler, Refrigerator and other cooling appliance complete all as specified and directed.
Supply and charging Nitrogen gas Gas for finding out leakage as and when required as specified and directed by Engr in charge.
S&F in replacement of Printed Circuit Board with CT coil complete suitable for 16.5 TR capacity Package type AC Plant as per OEMs specifications complete all as specified and directed
Supply & fixing in replacement of Capacitor 36 MFD complete all as specified by Engr- in- Charge as per OEMs specifications complete all as specified and directed
Supply & fixing in replacement of Capacitor 45 MFD complete all as specified by Engr- in- Charge .
Supply & fixing in replacement of Capacitor 50+6 MFD as per OEMs specifications complete all as specified and directed
Supply fixing in replacement of Printed Circuit Board suitable for 2TR Capacity Split Unit Air Conditioners including remote, as per OEMs specifications complete all as specified and directed
Supply fixing in replacement of Printed Circuit Board suitable for 1.5 TR Capacity Split Unit Air Conditioners including remote,as per OEMs specifications complete all as specified and directed
Disconnecting, dismantling and taking out existing burnt out compressor from window/Split type Air conditioner 2 TR Capacity and supply and fixing sealed unit compresser of existing capacity 2 TR, single phase, 230 V AC supply initialy filled with compressor gas as per OEMs specifications complete all as specified and directed
All as per srl item No. 30.00 here-in-before but Cap 1.5 TR Single phase 230 volts AC 50 Hz supply complete all as specified and directed by Engr-in-charge.
M&L for Shifting of split type AC from MES yard / existing location to the new location by taking it out after filling the opening of old location with cement mortor, applying white wash on wall with matching with existing colour of the site and making opening holes on brick wall at new location and gap well finished with cement mortor, applying white wash, colour wash, distemper etc on wall to match with existing colour of the adjacent surface , installation and commissioning with replacement of insulation of suction & discharge line complete all as specified and directed by Engr-in-charge.
M&L for Shifting of window type AC from MES yard / existing location to the site/ new location where directed & installation by making necessary opening of brick wall/ window and preparing gap well finished by cement mortor applying white washing in matching with the existing colour, disposal of waste material/ filling gap with ply wood on front side of AC and outer corner of ply wood applying two coats of enamelled paint over a coat of primer on plywood surface to match the existing location all as directed by the Engr-in-Charge.
Note: Amount of Rs 12082.00 indicated in tender documents as 'Schedule of Credit' shall be deducted from the total quoted amount of BOQ.
JEETEN ENTERPRISE
M/s Santosh Industrial Corporation
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .