Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAccepted-AOC | ₹17.0 L | L1 | Accepted-AOC Lowest Rate Submitted |
| 2 | L2₹17.2 L+₹23,875 (1.41%)Rejected-AOC | ₹17.2 L+₹23,875 (1.41%) | L2 | Rejected-AOC Highest Rate Submitted |
| 3 | L3₹18.3 L+₹1.3 L (7.57%)Rejected-AOC | ₹18.3 L+₹1.3 L (7.57%) | L3 | Rejected-AOC Highest Rate Submitted |
| Sl No | Description | Qty | Unit | DNYANPRAKASH YASHWANTRAO TUMMAWAR L2 | PUNAM PRAVIN BURLE L1 | SALAXSH INTERIOR DESIGN L3 |
|---|---|---|---|---|---|---|
| 1.01 | 80 mm Metal | 660 | Cum | 7,42,500 ₹7,42,500 | 7,39,200 ₹7,39,200 Lowest | 7,78,800 ₹7,78,800 |
| 1.02 | Murum | 907.5 | Cum | 6,62,475 ₹6,62,475 | 6,53,400 ₹6,53,400 Lowest | 7,07,850 ₹7,07,850 |
| 1.03 | Compacting Earth Work | 1 | Sqm ( For 1 kilometer) | 90,000 ₹90,000 Lowest | 90,000 ₹90,000 Lowest | 90,000 ₹90,000 Lowest |
| 1.04 | Compacting Hard Murum | 1 | Sqm ( For 1 kilometer) | 85,000 ₹85,000 | 82,500 ₹82,500 Lowest | 85,000 ₹85,000 |
| 1.05 | Compacting 80 mm | 1 | Sqm ( For 1 kilometer) | 98,000 ₹98,000 | 99,000 ₹99,000 | 45,000 ₹45,000 Lowest |
| 1.06 | Cement Concrete Pipe (900mm Dia with Collar) | 1 | RTM ( For 1 kilometer) | 35,000 ₹35,000 | 30,000 ₹30,000 Lowest | 99,000 ₹99,000 |
| 1.07 | Board | 1 | Nos | 10,000 ₹10,000 | 5,000 ₹5,000 Lowest | 22,000 ₹22,000 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
25 Aug 2026, 6:00 pmClosed
Sachiv Sarpanch/Prashasak
Gp kadholi Tah Bhadrawati Dist Chandrapur
Material Supply to Matoshri Pandan Rasta Gp Kadholi Road metalling and earthwork for the Road from Vitthal Thengane Farm to Rahul Turankar Farm Mouja Bonthala
2026_CHAND_1329897_1
Tender_Notice_2026_27_2ndcall
Open Tender
Miscellaneous Works
Item Rate
Gp kadholi
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹10,000
Yes
Gp kadholi
7 Sept 2026
19 Aug 2026
27 Aug 2026
19 Aug 2026
25 Aug 2026
19 Aug 2026
19 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | 80 mm Metal | 660 | Cum | - | - |
| 1.02 | Murum | 907.5 | Cum | - | - |
| 1.03 | Compacting Earth Work | 1 | Sqm ( For 1 kilometer) | - | - |
| 1.04 | Compacting Hard Murum | 1 | Sqm ( For 1 kilometer) | - | - |
| 1.05 | Compacting 80 mm | 1 | Sqm ( For 1 kilometer) | - | - |
| 1.06 | Cement Concrete Pipe (900mm Dia with Collar) | 1 | RTM ( For 1 kilometer) | - | - |
| 1.07 | Board | 1 | Nos | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_2276574.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .