Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified. |
| 2 | Accepted-Technical | Accepted-Technical Qualified. |
Tender Value
₹27.0 L
EMD Value
₹54,069
Closing Date
1 Jun 2026, 3:00 pmClosed
Chief Officer, DMC
Daman Municipal Council, Fort Area, Moti Daman.
Construction of Toilet Block at Mitnawad Khariwad Ward No 15 Nani Daman. 2nd call
2026_DAMAN_4695_1
03/2026-27/DMC
Open Tender
Civil Works - Others
Works
180 days
Nani Daman
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Chief Officer, DMC
₹54,069
16 Jun 2026
21 Apr 2026
3 Jun 2026
21 Apr 2026
1 Jun 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismentaling tiled of stone floors laid in mortar including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift. | - | Sqm | - | - |
| 2.01 | Demolition of Brick work and stone masonry including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift.(ii) In Cement Mortar. | - | Cum | - | - |
| 3.01 | Demolition including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift. (i) R.C.C. work. | - | Cum | - | - |
| 4.01 | Excavation for foundation upto depth 1.50mt.depth including sorting out and stacking out and stacking of useful materials and Disposing of the excavated stuff upto 50mt. Lead (b) dense or hard soil. | - | Cum | - | - |
| 5.01 | Collecting, carting, stacking & spreading ruble stone 150 mm. to 200mm size at site of work as directed. | - | Cum | - | - |
| 6.01 | Providing and laying cement concrete 1:3:6 (1 cement :3 coarse sand :6 graded stone aggregates 20mm. nominal size) and curing complete excluding cost of form work in (a) Foundation and plinth. | - | Cum | - | - |
| 7.01 | Providing and laying controlled cement concrete M.250 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (A) Foundations, footings, Base of columns and Mass concrete. | - | Cum | - | - |
| 8.01 | Filling on foundation and plinth with murrum or selected soil in layer of 20 CM thickness including watering ramming and consolidation and etc. complete. | - | Cum | - | - |
| 9.01 | Providing formwork of ordinary timber planking so as to give a rough finish including centering shuttering strutting and propping etc. Height of propping and centering below supporting floor to ceiling not exceeding 4 M. and removal of the same for in situ reinforced concrete and plain concrete work in. (A) Foundations Footings Bases of Columns etc. and Mass concrete. | - | Sqm | - | - |
| 10.01 | Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) and finishing smooth with,curing etc. complete including the cost of formwork but excluding the cost of reinforcement for R.C.C work in (B) COLUMNS: (i) Having cross-sectional area 0.05 to 0.08 Sq.M. | - | Cum | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_4869.xls
BOQ • 0.31 MB
CorrigendumIV.pdf
PDF • 0.53 MB
CorrigendumIII.pdf
PDF • 0.53 MB
CorrigendumII.pdf
PDF • 0.53 MB
CorrigendumI.pdf
PDF • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .