| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | ₹2.9 L | L1 | Accepted-AOC Lower Quoted Rates |
| 2 | L2₹3.0 LRejected-Finance | ₹3.0 L | L2 | Rejected-Finance Higher Quoted Rates |
| 3 | L3₹3.1 LRejected-Finance N A | NA | NA | 121004 | ₹3.1 L | L3 | Rejected-Finance Higher Quoted Rates |
Tender Value
₹2.8 L
EMD Value
₹2,777
Closing Date
19 Feb 2026, 5:00 pmClosed
Sr. Executive Engineer
Sr. Executive Engineer, Electrical Division HPSEBL Gagret
Tender for Prov. and erection of 11/0.4 KV 63 KVA DTR along with 3-Phase LT line and Augmentation of 1-Phase to 3-Phase LT line in village Bandu (Bhadarkali) in Electrical section Dangoh under ESD Daulatpur.
2026_HPSEB_128481_1
GED-185/2025-26
Open Tender
Electrical Works
90 days
Daulatpur
Please refer Tender Document
2 documents required · 2 mandatory
₹590
Yes
₹2,777
Yes
2 Apr 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
Erection Part of 11/0.4 KV 63 KVATransformer
Erection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. ( 63 KVA Transformer)
Prov. & erection of Chain link fencing angle iron, Gate etc. for transformer fencing.
Electrical Inspection Fees for LT and Substation Complete in All respect.
Supply Part of 11/0.4 KV, 63 KVA Transformer
Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 63 KVA (1 No. Supply by HPSEBL)
Prov. Steel Tubular Poles 9 Mtr Long along with base plate complete in all respect (2 No. Supply by HPSEBL)
Prov. RCC Muffs with concrete filling complete in all respect.
Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA.
Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
Transformer Belting & Knee Bracing
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed]
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer]
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos
Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing)
Transformer L.T Distribution Box and GO Switch fixing Assembly
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No.
Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm
Prov. GO AB Switch Unit (11kV, 400A, 100 KA) Tripple Pole O/d Type
Prov. D.O Fuse Unit
Prov. Surge Arrester, 9 kV Station Class (Porcelain Type)
Prov. Insulator 11kV Disc(Polymeric,BS, 90 KN) CD-320 complete in all respect.
DEAD END CLAMPS 7/ 3.81 MM AAAC COND, BALL CLEAVES EYE SOCKET 11/22 KV 7500GMS, Bend Stapples etc. (3 Set Supply by HPSEBL)
Prov. Stay set complete
Prov. Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set) (40 Kg Supply by HPSEBL)
Prov. Pipe Earthing Set
Prov. 6 SWG GI wire For Earthing (15 Kg Supply by HPSEBL)
Prov. Panel (Distribution Box LT 63 kVA DTR MS Sheet od 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x5mm)inside .painted /powder coated after primar coating etc allied assembly MCCB 100 amp 3P 35kA , ICS =100 % ICU, KIT-KAT 200 Amp for 63 KVA DTR
Prov. Half Clamp (M.S. Flat 50X6 mm)
Prov. Full Clamp (M.S. Flat 50X6 mm)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Aluminium Thimble (16 Nos. Supply by HPSEBL)
Prov. Copper Thimble 200 Amp (4 Nos. Supply by HPSEBL)
Prov. Danger Plate (1 No. Supply by HPSEBL)
Prov. Barbed Wire
Prov. LT Cable 3.5 core 95 mm²
Prov. Energy Meters LT 3-ɸ, 4 wire CT operated Static Tri- Vector meter with Box(CT-100/5A) Accuracy Class: 0.5S, Category-C, DLMS Compliant for 63 KVA Transformer
Prov. Aluminium Paint.
Prov. Red Oxide
Erection Part for new 3-Phase LT line and Augmentation of 1-Phase to 3-Phase LT line
Erection of LT line.Digging of pit of stay, Erection of Steel Pole 8 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of new 3-Phase LT line and Augmentation of 1-Phase to 3-Phase LT line complete in all respect.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Supply Part for new 3-Phase LT line and Augmentation of 1-Phase to 3-Phase LT line
Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage} (1.445 Kms Supply by HPSEBL)
Prov. ST Pole 8 mtr.long alongwith baseplate complete in all respect. (5 Nos. Supply by HPSEBL)
Prov. RCC Muffs with concrete filling complete in all respect.
Prov. Angle iron (75x75x6) Length 1.5 mtr. + 0.2 mtr.
Prov. Shackle Insulator (16 Kn)
Prov. D-Iron (U-Clamps)
Prov. Earth Knob
Prov. LT Stay Set
Prov. Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set (30 Kg Supply by HPSEBL)
Prov. Full Clamps [ 2 No for A.I + 1 No for Stay Set]
Prov. Earthing Set complete
Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m (29 Kg Supply by HPSEBL)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Spiral PVC Spacer (10 Nos. Supply by HPSEBL)
Prov. Aluminium Paint
Prov. Red Oxide
Loading of DTR and LT lines materials on truck at Divisional Store and same material unloading at road head of site of work and Manual Carriage Of DTR and allied Material For Average Distance From Road To Site Of Work .(If required as per site).
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_189904.xls
BOQ • 0.72 MB
B.rar
Tender Documents • 0.48 MB
Spc.pdf
Additional Documents • 6.24 MB
Download all tender documents and submit your bid