Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹28,612
Closing Date
10 Sept 2026, 1:00 pm6d left
executive officer
Nagar palika parishad sardhana
WARD 14 AFTAB KE MAKAN SE CHANGGA KE MAKAN TAK CC ROAD AND NALI NIRMAN KA WORK
2026_DOLBU_1182151_1
910(12)/01.09.2026
Open Tender
Civil Works
Percentage
30 days
Nagar palika parishad sardhana
Please refer Tender documents.
2 documents required · 2 mandatory
₹588
Account No 408005000104 IFSC Code ICIC0004080
₹28,612
3 Sept 2026
3 Sept 2026
10 Sept 2026
3 Sept 2026
10 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CC ROAD AND INTER LOCKING TILES | - | - | - | - |
| 2 | Earth work in filling upto distance 10.00 km lead with cartage/royalty for levelling dressing including supply of all material,labour and T&P etc.required for proper completion of work, less drain dduction 12.50% settlement | 26.32 | cum | 374 | ₹9,843.68 |
| 3 | Concrete in 1:6:12 with cement,fine sand and brick ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work(Chpt-5/273) drain base | 4.23 | cum | 2,930 | ₹12,393.9 |
| 4 | M-150 brick work in 1:4 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,both side drain | 7.41 | cum | 6,601 | ₹48,913.41 |
| 5 | 12mm thick Plaster in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(asper analysis DRAIN WALL | 53.36 | cum | 181 | ₹9,658.16 |
| 6 | Laying of C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labour and T&P etc required for proper completion of work (Chpt-5/279a) | 0.53 | cum | 5,650 | ₹2,994.5 |
| 7 | Providing,laying,spreading 45.5-63mm stone Aggregate in one layer with fine sand including supply of all material,labour and T&P etc.required for proper completion of work AREA AS PER item no1 | 7.52 | cum | 3,676 | ₹27,643.52 |
| 8 | cement concerete with 2cm gauge approved sone grit coarse sand and cement in proportion of 1:1:5:3 in pavement for cc road coarse and fine aggregate confirming to is standard mixed in cincerete mixture laying and fixing of125 micron thick polytheen film wedge steel plates including supply of all material labour and T&P etc required for proper completion of work | 17.16 | cum | 7,019 | ₹1,20,446.04 |
| 9 | Supply and fixing of Iron work such as heavy size Iron for channel including supply of all material,labour and T&P etc.required for proper completion of work,(asper sail) channel | 0.9 | qtl | 7,088 | ₹6,379.2 |
| 10 | Add sign board of granite stone | 1 | nos | 4,200 | ₹4,200 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.84 MB
BOQ_2222339.xls
BOQ • 0.35 MB
ULBT12.pdf
Tender Documents • 0.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .