Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.2 LAccepted-AOC PATHANPURA RATH DISTRICT HAMIRPUR | HAMIRPUR | UTTAR PRADESH | 210301 | ₹75.2 L | L1 | Accepted-AOC Financial bid accepted by the committee |
| 2 | L2₹84.8 LRejected-Finance | ₹84.8 L | L2 | Rejected-Finance Rejected being higher rate |
| 3 | L3₹79.7 LRejected-Finance 01 MAIN REOAD OJHARA KASRAWAD DISTT KHARGONE MP 451228 | KHARGONE | MADHYA PRADESH | 451228 | ₹79.7 L | L3 | Rejected-Finance Rejected being higher rate |
Tender Value
₹100.0 L
EMD Value
₹7 L
Closing Date
16 Mar 2026, 12:00 pmClosed
S.E., Hamirpur Circle PWD Hamirpur
S.E., Hamirpur Circle PWD Hamirpur
New construction work of the remaining part of village Italiaraja Jigni via Pachkaudiya Bridge
2026_CEBAN_1122487_1
453/30C-Hamirpur Circle/2025 Date 27.02.2026
Open Tender
Civil Works - Roads
180 days
CD-2 PWD Hamirpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
₹7 L
S.E., Hamirpur Circle PWD Hamirpur
6 Apr 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
11 Mar 2026
Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 1000 meter as per MORD technical specification clause 301.5 MORD sepecification 301.5(i) S.No. 3.4 (Ordinary soil)
Construction of subgrade with approved material obtained from borrow pits with all lifts and leads. transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead up to 1000 m as per Technical specification cause 303.1. including Stablization with 2% slaked lime including its mixing with rotabator complete.
Construction of Granular sub base by providing well graded material, spreading in uniform layer with motor grader on prepared surface mixing by mix in place method with 2% Cement (OPC) with rotavator at OMC and compacting with smooth wheel roller to achive the desired density complete as per clause 401.
Cement Treated Base Providing , laying, spreading material on a prepared sub grade adding cement @ 4% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined strength and to form a layer of sub base.
Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical pecification Clause 503.
Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat . Technical sepecification Claues 508
Providing and laying seal coat by manual means with VG-10 grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-C As per Technical Specification Clause 510
Construction of subgrade with approved material obtained from borrow pits with all lifts and leads. transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead up to 1000 m as per Technical specification cause 303.1. including Stablization with 2% slaked lime including its mixing with rotabator complete. (Patri)
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications clauses 600,1200 & 1203
Plastering with cement mortar (1:4) mm thick on brick work in substructure as per techinical specification clauses 613.4 & 1204
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. (350 mm dai)
Providing and PCC M20 architectural coping on the top of wing wall,return wall etc. complete as per drawing and technical specification clauses 615,710 and 1204.3.11
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of work Maintenance cost for 1st year (@0 % of total work amount S.No.1-16) per KM.
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of work Maintenance cost for 2nd year (@1.00 % of total work amount S.No.1-16) per KM.
Maintenance Charge including @ Earth work , repair of painted surface, earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of work Maintenance cost for 3rd year (@1.50% of total work amount S.No.1-16) per KM.
Maintenance Charge including @ Earth work ,repair of painted surface,earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of work Maintenance cost for 4th year(@2.00% of total work amount S.No.1-16) per KM.
Maintenance Charge including @ Earth work ,repair of painted surface,earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of work Maintenance cost for 5th year (@3.00% of total work amount S.No.1-16) per KM.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.09 MB
Tendernotice_2.pdf
PDF • 2.17 MB
BOQ_2090384.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid