Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.9 LAccepted-AOC | ₹79.9 L | L1 | Accepted-AOC LER |
| 2 | L2₹79.9 LRejected-Finance 136 52 MATHALANGULA ST THIUVANNAMALAI 606601 | TIRUVANNAMALAI | TAMIL NADU | 606601 | ₹79.9 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | ARUNAI CONSTRUCTIONS L2 | SURYA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Part I - Construction of Side Drainage with in Srilankan Refugees Houses (Athiyandal Camp) at Kananthampoondi Panchyat. | |||||
| 1.01 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation | 1,081.08 | cum | 263.78 ₹2.9 L | 263.78 ₹2.9 L |
| 1.02 | Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc, | 154.44 | cum | 5,364.38 ₹8.3 L | 5,364.38 ₹8.3 L |
| 1.03 | Cement Concrete 1:3:6 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc, | 463.32 | cum | 5,638.7 ₹26.1 L | 5,632.5 ₹26.1 L |
| 1.04 | Supplying and erecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plance surfaces in all floors with all cross bracings using mild steel of size 90cm. X 60 cm. and 10 gauge stiffened, welded with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joist of size 10cm. x 6.5 cm. dia spaced about 90 cm. center to center and supported by casuarinas props of 10 cm. to 13 cm. dia spaced at 75 cm. center to center etc., complete coplying with standard specification ans as directed for the following items. | 3,088.8 | Sqm | 547.5 ₹16.9 L | 547.5 ₹16.9 L |
| 1.05 | Plastering with Cement Mortar 1:4 (One Cement and Three P.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers. | 579.15 | Sqm | 587.12 ₹3.4 L | 587.12 ₹3.4 L |
| 1.06Provision for Soak Pit 1 x 2 Nos. | |||||
| 1.07 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation | 75.46 | cum | 263.78 ₹19,904.84 | 263.78 ₹19,904.84 |
| 1.08 | Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc | 7.5 | cum | 5,364.38 ₹40,232.85 | 5,364.38 ₹40,232.85 |
| 1.09 | Supplying and erecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plance surfaces in all floors with all cross bracings using mild steel of size 90cm. X 60 cm. and 10 gauge stiffened, welded with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joist of size 10cm. x 6.5 cm. dia spaced about 90 cm. center to center and supported by casuarinas props of 10 cm. to 13 cm. dia spaced at 75 cm. center to center etc., complete coplying with standard specification ans as directed for the following items. | 135.54 | Sqm | 547.5 ₹74,208.15 | 547.5 ₹74,208.15 |
Updated dates
Tender Value
₹81.0 L
EMD Value
₹81,000
Closing Date
7 Jan 2026, 3:00 pmClosed
The Project Director, DRDA, Tiiruvannamalai
DRDA, Tiruvannamalai
Providing Basic infrastructure works at Srilankan Refugees Houses (Athiyandal Camp) in Kananthampoondi Panchayat in Tiruvannamalai Block Package No. TVM/2025-26/209 of Tiruvannamalai District
2025_RDTN_631930_1
A8/2616/2023 Date.21.11.2025 209
Open Tender
Civil Works
90 days
Tiruvannamalai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹81,000
9 Mar 2026
13 Dec 2025
7 Jan 2026
13 Dec 2025
7 Jan 2026
13 Dec 2025
Amount
Part I - Construction of Side Drainage with in Srilankan Refugees Houses (Athiyandal Camp) at Kananthampoondi Panchyat.
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc,
Cement Concrete 1:3:6 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc,
Supplying and erecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plance surfaces in all floors with all cross bracings using mild steel of size 90cm. X 60 cm. and 10 gauge stiffened, welded with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joist of size 10cm. x 6.5 cm. dia spaced about 90 cm. center to center and supported by casuarinas props of 10 cm. to 13 cm. dia spaced at 75 cm. center to center etc., complete coplying with standard specification ans as directed for the following items.
Plastering with Cement Mortar 1:4 (One Cement and Three P.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
Provision for Soak Pit 1 x 2 Nos.
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc
Supplying and erecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plance surfaces in all floors with all cross bracings using mild steel of size 90cm. X 60 cm. and 10 gauge stiffened, welded with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joist of size 10cm. x 6.5 cm. dia spaced about 90 cm. center to center and supported by casuarinas props of 10 cm. to 13 cm. dia spaced at 75 cm. center to center etc., complete coplying with standard specification ans as directed for the following items.
Cement Concrete 1:3:6 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc
Cement Concrete 1:2:4 mix using 20 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Cost and Supply of 40mm ISS HBG Metal including cost and conveyance.,etc
Collection and supply of Sand filling in Basement including cost and conveyance.,etc
Collection and supply of Gravel for filling in Basement including cost and conveyance.,etc
Cost and Supply of 20mm ISS HBG Metal including cost and conveyance.,etc
Supply of PVC Pipes 50mm dia with all labour charges.,etc.compelete.
Provison for Raod Crossing culvert 6 Nos.
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc,
Cement Concrete 1:3:6 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc,
Supplying and erecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plance surfaces in all floors with all cross bracings using mild steel of size 90cm. X 60 cm. and 10 gauge stiffened, welded with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joist of size 10cm. x 6.5 cm. dia spaced about 90 cm. center to center and supported by casuarinas props of 10 cm. to 13 cm. dia spaced at 75 cm. center to center etc., complete coplying with standard specification ans as directed for the following items.
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc, DECK SLAB
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
ARUNAI CONSTRUCTIONS (BID ID -1555722)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.09 MB
Tender_Document_209.pdf
Tender Documents • 0.40 MB
BOQ_755900.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid