Tender Value
₹6.7 L
EMD Value
₹6,700
Closing Date
27 Nov 2023, 3:00 pmClosed
Block Development Officer(B.Pt), Valangaiman
nt Officer(B.Pt), Valangaiman
Repairs to Kulakudy PUE School Building and Toilet Building in Sithanvalur Panchayat
2023_RDTN_389603_1
5015/2023/A2 Valangaiman Block Thiruvarur District
Open Tender
Civil Works
Item Rate
90 days
Block Development Office, Valangaiman
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,700
9 Dec 2023
20 Nov 2023
27 Nov 2023
20 Nov 2023
27 Nov 2023
20 Nov 2023
Amount
1. REPAIRS TO PUE SCHOOL ( NORTH FACING -1) 2 Class Room Kulakkudi @ Sithanvalur PANCHAYAT
Dismantling damaged Plastered Surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Dismantling damaged Chipping of concrete and roughening the surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Dismantling damaged Floor finish & dadooing walls in cement mortar with Mosaic Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Dismantling damaged Pressed Tiles and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:5,12mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:3,10mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officersolar Reflective ceramic tiles (Required design) of size 305x305x25 mm thick of approved quality and colour laid in CM 1:3, 12mm thick and pointed with tile grout(Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint,curing etc., complete complying with satandard apecification and as directed by the department officers.(The make and brand of the tiles should be got approved by the Executive Engineer before use on works) PWD Data (observed)
Provision for Repair widows charges
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete
Distembering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete
Blackboard Painting two coats over oldcement plastered surface with best approved best quality ofblackboard paint of approved colour over the existing priming coat etc., complete
Supply and Fixing of PVC Rain water Down fall Pipe 110mm
Towards cost of Provision for Bala Painting including cost of painting materials and all labour charges etc complete
Provision for Electrification Arrangemet
Provision for Light&Fan Point(concealed)
Provision for Plug Point SD 38
Provision for CFL Blub
Provision for Bulket fitting 100w
Provision for Tube Light Fitting
Provision for Celling fan
ii)Provision for Student Cubboard Sb Estimate
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
iii)Provision for Teachers Cubboard Sb Estimate
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
iv)Provision for Chappal Rack Sb Estimate
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing following thickness of cuddapah slab for cupboard
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
v)Provision for Pesdestal for Keeping Drinking Water Container
Dismantling the Existing Damaged cement Plastering including all chages etc for complete
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Providing granolithic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Dadooing walls Plain Galzed tiles of size 150x150x6mm cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Provision for PVC Pipe,Tank and Tap,Tee, Elbow and etc arrangements
vi)Provision For Ramp Repairs Sub estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Providing granolithic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Provision for Name board charges
Provision for Photo charges
2)Repairs to Boys Toilet at PUE School @ kulakudi in Sithanvalur Panchayat
Dismantling damaged Plastered Surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Dismantling damaged Chipping of concrete and roughening the surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:5,12mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:3,10mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officersolar Reflective ceramic tiles (Required design) of size 305x305x25 mm thick of approved quality and colour laid in CM 1:3, 12mm thick and pointed with tile grout(Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint,curing etc., complete complying with satandard apecification and as directed by the department officers.(The make and brand of the tiles should be got approved by the Executive Engineer before use on works) PWD Data (observed)
Provision for Door Repair charges
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete
Distembering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete
Supplying and fixing in position best quality and approved make Indian made white / colour glazed earthernware wash hand basin of size 550 x 400mm (with pedestal / without pedestal) with a pair of cast iron brackets, including cost 15mm dia brass CP pillar tap, 32mm dia "B" class GI waste pipe with rubber plug and chain, 15mm dia GM wheel valve, 15mm brass nipple, 15mm dia nylone connection, 32mm dia CP brass waste coupling including fixing of wash basin using CI brackets on to the wall in position with TW plugs and screws, rubber washers, white lead and giving necessary water supply connection and painting the brackets with two coat of painting over a priming coat of anti-corrosive paint including testing for leakages etc., complete complying with standard specification and as directed by the departmental officers. (The wash hand basin and specials should be got approved by the Executive Engineer before use on works).
i)Provision for Electrification Arrangemet
Provision for Light&Fan Point(Open)
Provision for Plug Point
Provision for CFL Blub
Provision for Tube Light Fitting
Provision For Ramp Repairs Sub estimate
Dismantling the Existing Damaged cement Plastering including all chages etc for complete
Dismantling damaged Chipping of concrete and roughening the surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Providing granolithic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
PVC Special (Sanitary arrangements)
PVC Pipe 110mm
Elbow(110mm)
Tee(110mm)
Provision For Precast Leachpit
Provision for Name board
Provision for Photo charges
3) Repairs to Girls Toilet at PUE School @ kulakudi in Sithanvalur Panchayat
Dismantling damaged Plastered Surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Dismantling damaged Chipping of concrete and roughening the surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:5,12mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:3,10mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officersolar Reflective ceramic tiles (Required design) of size 305x305x25 mm thick of approved quality and colour laid in CM 1:3, 12mm thick and pointed with tile grout(Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint,curing etc., complete complying with satandard apecification and as directed by the department officers.(The make and brand of the tiles should be got approved by the Executive Engineer before use on works) PWD Data (observed)
Provision for Door Repair charges
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete
Distembering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete
Supplying and fixing in position best quality and approved make Indian made white / colour glazed earthernware wash hand basin of size 550 x 400mm (with pedestal / without pedestal) with a pair of cast iron brackets, including cost 15mm dia brass CP pillar tap, 32mm dia "B" class GI waste pipe with rubber plug and chain, 15mm dia GM wheel valve, 15mm brass nipple, 15mm dia nylone connection, 32mm dia CP brass waste coupling including fixing of wash basin using CI brackets on to the wall in position with TW plugs and screws, rubber washers, white lead and giving necessary water supply connection and painting the brackets with two coat of painting over a priming coat of anti-corrosive paint including testing for leakages etc., complete complying with standard specification and as directed by the departmental officers. (The wash hand basin and specials should be got approved by the Executive Engineer before use on works).
i)Provision for Electrification Arrangemet
Provision for Light&Fan Point(Open)
Provision for Plug Point
Provision for CFL Blub
Provision for Tube Light Fitting
Provision For Ramp Repairs Sub estimate
Dismantling the Existing Damaged cement Plastering including all chages etc for complete
Dismantling damaged Chipping of concrete and roughening the surface and clearaing away from site including all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Providing granolithic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
PVC Special (Sanitary arrangements)
PVC Pipe 110mm
Provision For Precast Leachpit
Provision for Name board
Provision for Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
THAMARAISELVI
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .