Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹70.0 LAccepted-AOC 13193 GALI NO 9 NAMDEV MARG BATHINDA | ₹70.0 L | L1 | Accepted-AOC Lowest Quoted Amount |
| 2 | L2₹70.7 LRejected-Finance JANGIRANA PUNJAB | MANSA | PUNJAB | 151302 | ₹70.7 L | L2 | Rejected-Finance Higher Quoted Amount |
Tender Value
₹71.4 L
EMD Value
₹1.4 L
Closing Date
6 Feb 2026, 12:00 pmClosed
DSCO Keshav Kumar
Opposite Aggarwal Hospital, Kishanpura Road, Sangrur
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV/Sluice Valves, Construction of Haudies and all other allied works.
2025_DOA_153358_6
DSWC/SGR/2025-26/25
Open Tender
Pipe Laying Works
365 days
Sangrur
Please refer tender documents.
3 documents required · 3 mandatory
₹2,000
₹1.4 L
24 Mar 2026
26 Jan 2026
6 Feb 2026
26 Jan 2026
6 Feb 2026
26 Jan 2026
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
Divisional Soil Conservation Officer, Sangrur
Tender No: DSWC/DSCO/SGR/UGPL/2025-26/25
Name of the Firm/Bidder
Address of Firm/Bidder
Mobile No of Firm/Bidder Email ID of Firm
Total Estimated Amount of Works Rs. Seventy One Lakh Forty Thousand Eight Hundred Forty Eight Only.
Quoted by Contractor {- or + to estimated amount, in figure upto 2 dcimal point only} Quote (-/+)
Note: Please quote only figure (upto 2 decimal points) in above blue colour box in minus or plus. Do not put %age sign after this figure. Please check Quoted Rate in Next cell.
Note: Please refer to DNIT for item wise rate and details.
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 300 mm Dia RCC Pipes, fixing of AVP, NP3 pipes, Risers, Construction of Haudies at Village - Chatha Nanhera (Mogha No. 13566/L), Tehsil-Sunam and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 5648.7 /Cum 93.78 Ninety Three rupees and Seventy Eight paise
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 4955 /Mtrs 84 Eighty Four rupees
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 1982 /Joints 116.94 One Hundred Sixteen rupees and Ninety Four paise
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (300mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 1355.85 One Thousand Three Hundred Fifty Five rupees and Eighty Five paise
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (300 mm) 54 /Cut hole 75 Seventy Five rupees
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 17 /Cut hole 41 Forty One rupees
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (300mm) 54 /Riser & Valve 487.19 Four Hundred Eighty seven rupees and ninteen paise
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 17 /Air pipe 287.45 Two Hundred Eighty seven rupees and fourty five paise
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Ninety Three rupees and Seventy Eight paise
B.B.C 1:8:16 0.6 cum 3867.78 Three Thousand Eight Hundred Sixty Seven rupees and Seventy Eight paise
Plain Cement Concrete 1:2:4 0.14 cum 5097.57 Five Thousand Ninety Seven rupees and Fifty Seven paise
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum Five Thousand Forty Three rupees and Ten paise
12.5 mm thick cement plaster work 1:4 15.32 cum 201.89 Two Hundred One rupees and Eighty Nine paise
RCC Slab 1:2:4 0.21 cum 8194.65 Eight Thousand One Hundred Ninety Four rupees and Sixty Five paise
Foot rest (Item No. 29.37) 6 No 100 One Hundred rupees
Total Cost for ONE Haudi
Total Cost for Ten Haudis
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Four Thousand rupees
Sign Board (5' X 3') 1 each 4000 Four Thousand rupees
Fixing of gate valve (300 mm) 14 each 1454.1 One Thousand Four Hundred Fifty Four rupees and Ten paise
Nimar for jointing the pipe (300mm) 0.999 Per kg 60 Sixty rupees
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 275.233 per tonnes One Hundred Sixty rupees and Thirty paise
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 39381
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 500 mm Dia RCC Pipes, fixing of AVP, NP3 Pipes, Risers, Construction of Haudies at Village - Kanakwal Bhanguan 23518/L , Tehsil-Sunam and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 20899.73 /Cum 93.78 Ninety Three rupees and Seventy Eight paise
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 11858 /Mtrs 71 Seventy One rupees
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 4743.2 /Joints 299.2 Two Hundred Ninety Nine rupees and Twenty paise
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (500mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2777.02 Two Thousand Seven Hundred Seventy Seven rupees and Two paise
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (500 mm) 101 /Cut hole 127 One Hundred Twenty Seven rupees
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 33 /Cut hole 41 Forty One rupees
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (500mm) 101 /Riser & Valve 894.34 Eight Hundred Ninety Four rupees and Thirty Four paise
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 33 /Air pipe Two Hundred Eighty Seven rupees and Fifty Three paise
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Ninety Three rupees and Seventy Eight paise
B.B.C 1:8:16 0.6 cum 3804.91 Three Thousand Eight Hundred Four rupees and Ninety One paise
Plain Cement Concrete 1:2:4 0.14 cum Five Thousand Thirty Four rupees and Ten paise
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 4973.33 Four Thousand Nine Hundred Seventy Three rupees and Thirty Three paise
12.5 mm thick cement plaster work 1:4 15.32 cum 194.62 One Hundred Ninety Four rupees and Sixty Two paise
RCC Slab 1:2:4 0.21 cum 8131.25 Eight Thousand One Hundred Thirty One rupees and Twenty Five paise
Foot rest (Item No. 29.37) 6 No 100 One Hundred rupees
Total Cost for ONE Haudi
Total Cost for Eleven Haudis
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Four thousand Only
Sign Board (5' X 3') 1 each 4000 Four thousand Only
Fixing of gate valve (500 mm) 22 each 2569.71 Rupees Twenty Five thousand Sixty nine and seventy one paise only
Nimar for jointing the pipe (500mm) 1001.764 Per kg 60 rupees sixty only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 1831.308 per tonnes 209.86 Rupees two hundred nine and eighty six paise only
Credit of damaged lined water channel existing on site to be deducted from the bill of Agency 34047
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP, NP3 Pipes, Risers, Construction of Haudies at Village - Hambalwas 14328/R , Tehsil-Sunam and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1556.28 /Cum 93.78 Ninety three rupees and seventy eight paisa only.
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1048 /Mtrs 71 Seventy one rupees and zero paisa only.
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 419.2 /Joints 207.98 Two hundred seven rupees and ninety eight paisa only.
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (400mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2777.02 Two thousand seven hundred seventy seven rupees and two paisa only.
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 9 /Cut hole 105 Two thousand seven hundred seventy seven rupees and two paisa only.
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 4 /Cut hole 41 Two thousand seven hundred seventy seven rupees and two paisa only.
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (500mm) 9 /Riser & Valve 704.8 Seven hundred four rupees and eighty paisa only.
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 4 /Air pipe 286.81 Two hundred eighty six rupees and eighty one paisa only.
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Ninety three rupees and seventy eight paisa only.
B.B.C 1:8:16 0.6 cum 3798.9 Three thousand seven hundred ninety eight rupees and ninety paisa only.
Plain Cement Concrete 1:2:4 0.14 cum 5020.76 Five thousand twenty rupees and seventy six paisa only.
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 4970.32 Four thousand nine hundred seventy rupees and thirty two paisa only.
12.5 mm thick cement plaster work 1:4 15.32 cum 194.42 One hundred ninety four rupees and forty two paisa only.
RCC Slab 1:2:4 0.21 cum 7698.96 Seven thousand six hundred ninety eight rupees and ninety six paisa only.
Foot rest (Item No. 29.37) 6 No 100 One hundred rupees and zero paisa only.
Total Cost for ONE Haudi
Total Cost for One Haudis
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Four thousand rupees and zero paisa only.
Sign Board (5' X 3') 1 each 4000 Four thousand rupees and zero paisa only.
Fixing of gate valve (400 mm) 3 each 2022.8 Two thousand twenty two rupees and eighty paisa only.
Nimar for jointing the pipe (400mm) 57.85 Per kg 60 Sixty rupees and zero paisa only.
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 103.456 per tonnes 172.94 One hundred seventy two rupees and ninety four paisa only.
Grand Total (A+B+C)
Total Credit of damaged lined water channel existing on site to be deducted from the bill of Agency
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
NITUGPL252625.pdf
Tender Documents • 0.50 MB
DNITUGPL252625.pdf
Tender Documents • 1.16 MB
FBUGPL252625.xls
Additional Documents • 0.17 MB
Download all tender documents and submit your bid