Tender Value
₹59.4 L
EMD Value
₹1.2 L
Closing Date
16 Jun 2026, 1:30 pm
the Addl. Chief Engineer cum Director, PWD
O/o the Addl. Chief Engineer cum Director, PWD
Construction of Rebgon Thandwi Katindra Swargiyary Children Park at Salbari, Baksa District. TN_133_12 (R-1)
2026_BTC_52509_4
ACE-106/PWD/IFB/PT-I/23-24/293
Open Tender
Civil Works - Building
180 days
Baksa
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,200
₹1.2 L
Yes
26 May 2026
26 May 2026
16 Jun 2026
26 May 2026
16 Jun 2026
26 May 2026
26 May 2026 - 16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | 1.Boundary Wall with Fencing
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2.8.1 All kinds of soil | 1 | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete :
16.12.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 | 1 | Sqm | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size
derived from natural sources) | - | Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more | 1 | Kg | - | - | BI01010001010000000000000515BI0100001116 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more | - | Kg | - | - | BI01010001010000000000000515BI0100001117 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, etc. for mass concrete | - | Sqm | - | - | BI01010001010000000000000515BI0100001118 |
| 7 | 5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | Sqm | - | - | BI01010001010000000000000515BI0100001119 |
| 8 | 5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts | 1 | Sqm | - | - | BI01010001010000000000000515BI0100001120 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
5.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - | BI01010001010000000000000515BI0100001121 |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | Cum | - | - | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.34 MB
SBD_Bldg09.pdf
Tender Documents • 2.60 MB
BOQ_82989.xls
BOQ • 0.27 MB
FOB_09.pdf
Additional Documents • 0.34 MB
Download all tender documents and submit your bid