| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.8 LAdmitted-Fee/PreQual/Technical/Finance | -0.11% | ₹13.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹13.8 L+₹1,523.46 (0.11%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹13.8 L+₹1,523.46 (0.11%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹14.0 L+₹15,373.10 (1.11%)Admitted-Fee/PreQual/Technical/Finance 0 BAANGAD WALTERGANJ BASTI BASTI UTTAR PRADESH 272182 | BASTI | UTTAR PRADESH | 272182 | +1.00% | ₹14.0 L+₹15,373.10 (1.11%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹13.8 L
EMD Value
₹70,000
Closing Date
14 Aug 2026, 5:00 pmClosed
BDO SHIKARPUR
BDO OFFICE SHIKARPUR
Work no 1 Gram Kadrabad Me Daber Road Mukhya Marg se Sanjay ke Tubewell ki Aur CC Nad Nali Nirman Karya
2026_RDUP_1173766_1
534/ BLOCK SHIKARPUR 2026-27 DT 25-07-2026
Open Tender
Civil Works
Percentage
180 days
BLOCK SHIKARPUR
Tender Fee, EMD and Other documents as per the tender document/NIT
2 documents required · 2 mandatory
₹1,400
BDO SHIKARPUR
₹70,000
17 Aug 2026
31 Jul 2026
15 Aug 2026
3 Aug 2026
14 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old brick laid on edge kharanja including stacking of old bricks. As per SI NO. 17.17 new item | 187.11 | Sqm | 35 | ₹6,548.85 |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 upto 3.0 Km Distance | 158.4 | Cum | 195.3 | ₹30,935.52 |
| - | Laying of BOF soling with old bricks i/c preparation of subgrade and filling local earth in joints etc all comp at site as per SI no. 785 (labour only) | 290.51 | Sqm | 90 | ₹26,145.9 |
| - | Construction of Granular Sub Base providing well graded Mterial, spreading in uniform layers with tractor mount grader on prepared surface mixing by mix in place method with Rotavator at OMC , and compacting with smooth wheel roller to achieve the desired density,complete as per TECHNICAL SPECIFICATION clause 401 | 97.73 | Cum | 3,285 | ₹3,21,043.05 |
| - | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 | 19.89 | Cum | 6,636 | ₹1,31,990.04 |
| - | Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 | 85.55 | Cum | 8,055 | ₹6,89,105.25 |
| - | Plastering with cement, Coarse sand mortar (1:4) 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 | 50.4 | Sqm | 193 | ₹9,727.2 |
| - | Plain/rainforced cement concrete in substructure complete as per drawings and technical specifications Clause 802, 804,805,806,807,1202 1202 & 1204 (P.C.C. grade M 20) | 2 | Cum | 7,488 | ₹14,976 |
| - | Supply & Fixing of Informatory Sign board at site including letter, writing, painting etc all comp at site. | 1 | No. | 5,000 | ₹5,000 |
| - | DEDUCTION OF COMPETITIVE PRICE EFFICENCY (5%) | 5 | Percentage | - | - |
stage.html
html • 0.02 MB
finance_2204773.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_2204773.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .